2 Model Introduction
3 Actual Testing
4 Parameter Identification
5 Model Verification
1 Background and Significance
2 The turbine governor system is the basic data for power grid
stability analysis
Model of electro-
Model of steam Mechanical
hydraulic control Model of actuator
turbine power
system
3 Actual Testing
Actual
Static test Testing Load test
Frequency step
Small step test of disturbance test
actuator opening in power control
mode
Start
Model simulation
执行机构开度/%
Calculation of error between measured Adjusting PID
data and simulation data parameters
no
Does the error
meet the standard
requirements
Yes
End
Parameter Identification-Identification of
4 Steam Turbine Volume Time Parameters
调节级压力/MPa
热再压力/MPa
中排压力/MPa
The parameters of the steam turbine are identified through frequency disturbance test data of the load
valve controlled open-loop method. Consider the steam pressure after the regulating stage P1 as the
concentrated parameter of the steam volume in the HP cylinder. Represent the inlet steam pressure of
IP cylinder P2 as the steam pressure of the reheater. The exhaust pressure of IP cylinder P3 represents
the steam pressure of the low-pressure connecting pipe.
5 Model Verification-Accuracy index
Rise time tUP:In the step test, the time
required from the addition of the step
quantity to the change of the controlled
quantity to 90% of the step quantity
Maximum Peak
Peak power Maximum
output Regulating time( power time
time of HP output Regulating time(s)
power of HP s) of HP
cylinderP (s) power of HP
cylinder(%) cylinderP
cylinder(%)
(s)
Measured 35.82 0.71 60.6
Measured -42.09 0.94 60.5
Simulation 35.95 0.80 59.62
Simulation -35.98 1.04 59.61
Deviation -0.14 -0.09 0.98