GCP-1001-01-CS-0138-0000-D-VE-02264

SUPPLIER REPRESENTATIVE DAILY REPORT


STSO No.: VDR-02264 COMPANY: Westech Engineering, Inc.
REFERENCE PO No. POA-MLGA-10003 PROJECT: Los Pelambres
SUPPLIER: WESTECH ENGINEERING, INC. REPORT DATE 19-sep-22
SUPPLIER REP.: Joseph Nelson REPORT No. VDR-02264
SDN NO: 26148-323-YR293-MLGA-02264
EPC: EPC3 CONTRACT NO: 26148-220-HC4-MLGA-00293
START DATE SITE ARRIVAL
START TIME STOP TIME TOTAL HOURS
12-sep-22 DATE
07:30 18:30 11:00
(Travel to site begins) 19-sep-22
DESCRIPTION OF SUPPLIER REPRESENTATIVE WORK PERFORMED TODAY:
Part A (Completed by RSE/RFE)

Kurtis verified he could bring up HMI on my laptop via VNC. Started creating SIT paperwork and supported Loop checking with
help from Nathan Tenney (SLC). Nate fixed errors as needed.
4 data points were added to the data transfer list for LAL41x28

NON-MANUAL HOURS
ST OT
10:00 00:00
SPECIAL COMMENTS (Final Site
Revisado
departure date)
Billable Manual Support Hours: 10
Rework or Non-Billable Manual Support
0
Hours:
Reported by (Print Name): Miguel Zuñiga Date: 27-sep-22

BECHTEL RECORD OF SUPPLIER REPRESENTATIVE WORK PERFORMED TODAY


PART B (Completed by Supplier

SUPPLIER REPRESENTATIVE AND MANUAL CRAFT HOUR VERIFICATION


Representative)

MANUAL
ST OT
SPECIAL COMMENTS: (Delays, Hold
ups, Equipment issues, Non-Bechtel Revisado
work, etc.)
Billable TA Hours: 0
Rework or Non- Billable TA Hours: 0
Prepared by (Print Name): Eudo Arteaga Perdomo Date: 28-sep-22

Originator: Joseph Nelson Date: 19-sep-22

SWPP 6301, Rev. 2 – Services of Supplier Representatives

Distribution:

Original – FCM

Copies – RFE or RSE, Construction or Startup, Field Project Controls

Bechtel Confidential
©Bechtel Corporation 2002, 2013. Contains information that is confidential and proprietary to Bechtel or its affiliates, clients or suppliers, and
may not be used, reproduced or disclosed without Bechtel's prior written permission. All rights reserved.