Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MISS. ROMELA BEGUM Consumer No 72013434

Father’s /Husband Name Account Number 15/9/C

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/151

National ID Number Tariff LT-E-NORMAL

Address PABNA ROAD ,ISHURDI

Mobile No(Owner) 01717424954 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 3 Maximum Demand(MD)

New Meter Number 20330010930 Old Meter Number 96802273

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12393 Transformer Name RAIL GATE-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 1/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. ANISUR RAHMAN OLIF Consumer No 72036577

Father’s /Husband Name Account Number 6322/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/152

National ID Number Tariff LT-E-NORMAL

Address RAIL GATE ,ISHWRDI

Mobile No(Owner) 01717424954 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330010929 Old Meter Number 51556795

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12393 Transformer Name RAIL GATE-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 2/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. ROBIUL ISLAM Consumer No 72044081

Father’s /Husband Name Account Number 979/C1

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/159

National ID Number Tariff LT-C1-NORMAL

Address VALU PARA

Mobile No(Owner) 01921597657 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330010948 Old Meter Number 0014221

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12397 Transformer Name FISHARIJ-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 3/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name EDOTCO BANGLADESH CO LTD Consumer No 72045845

Father’s /Husband Name Account Number 7135/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/163

National ID Number Tariff LT-E-NORMAL

Address THANA PARA ISHWARDI

Mobile No(Owner) 01771648434 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 15 Maximum Demand(MD)

New Meter Number 20330011208 Old Meter Number 0010238

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12403 Transformer Name RAHMAN KOLONI-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 4/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name PURBASHA ORGANIC FOOD AND BEVE Consumer No 72043873

Father’s /Husband Name Account Number 978/C1

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/156

National ID Number Tariff LT-C1-NORMAL

Address BOROICHARA JOYNAGOR

Mobile No(Owner) 01711251011 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 40 Maximum Demand(MD)

New Meter Number 20330010927 Old Meter Number 0014228

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12395 Transformer Name PUBASHA MURIR MILL-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 5/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. BAJLUR RAHMAN Consumer No 72044905

Father’s /Husband Name Account Number 09/D3

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/161

National ID Number Tariff LT-D3-NORMAL

Address POUROSOVA ROAD ISHWARDI

Mobile No(Owner) 01723662035 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330010947 Old Meter Number 0014257

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12399 Transformer Name POST OFFICE-250 KVA

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 6/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD NURNNABI BIPLABUR RAHMAN Consumer No 72044036

Father’s /Husband Name Account Number 6948/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/157

National ID Number Tariff LT-E-NORMAL

Address MADDHO ARONKOLA

Mobile No(Owner) 01718313909 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 10 Maximum Demand(MD)

New Meter Number 20330010950 Old Meter Number 0014226

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12362 Transformer Name FAYER SERVICE-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 7/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name FIBER AT HOME LTD Consumer No 72045848

Father’s /Husband Name Account Number 7136/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/164

National ID Number Tariff LT-E-NORMAL

Address DORINARICHA, ISHWARDI

Mobile No(Owner) 01737968559 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 10 Maximum Demand(MD)

New Meter Number 20330011207 Old Meter Number 0010239

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12393 Transformer Name RAIL GATE-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 8/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name EDOTCO BANGLADESH CO.LIMITED Consumer No 72042654

Father’s /Husband Name Account Number 6858/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/154

National ID Number Tariff LT-E-NORMAL

Address MD. MONOWAR SHIKDER VELUPARA

Mobile No(Owner) 01660107569 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 12 Maximum Demand(MD)

New Meter Number 20330010928 Old Meter Number 012776

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12389 Transformer Name VELU PARA-200 KVA

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 9/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. HAEDAR ALI Consumer No 72044031

Father’s /Husband Name Account Number 6952/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/158

National ID Number Tariff LT-E-NORMAL

Address UMIR PUR

Mobile No(Owner) 01713589683 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330010949 Old Meter Number 0014222

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12397 Transformer Name FISHARIJ-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 10/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD BABUL AKTHER Consumer No 72044281

Father’s /Husband Name Account Number 6982/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/160

National ID Number Tariff LT-E-NORMAL

Address POST-OFFICE MORE ISHWARDI

Mobile No(Owner) 01740917072 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 10 Maximum Demand(MD)

New Meter Number 20330011210 Old Meter Number 0012473

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12391 Transformer Name KRISHI OFFICE-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 11/13
1/16/24, 11:49 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MST. SEFALY BEGUM Consumer No 72045305

Father’s /Husband Name Account Number 10/D3

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/162

National ID Number Tariff LT-D3-NORMAL

Address UMIRPUR

Mobile No(Owner) 01736223591 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330011209 Old Meter Number 1678871256192758

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12401 Transformer Name UMIRPUR-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 12/13
1/16/24, 11:49 AM NESCOworkOrders

59.152.63.251:59101/hes/# 13/13

You might also like