Download as pdf or txt
Download as pdf or txt
You are on page 1of 13

1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD.NURNNABI BIPLABUR RAHMAN Consumer No 72032832

Father’s /Husband Name Account Number 34205/A

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/131

National ID Number Tariff LT-E-NORMAL

Address POST OFFICE MOR ,ISHWARDI

Mobile No(Owner) 01714958413 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 45 Maximum Demand(MD)

New Meter Number 20330011380 Old Meter Number 14486422

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12362 Transformer Name FAYER SERVICE-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 1/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. NUR UDDIN SAFI Consumer No 72013525

Father’s /Husband Name Account Number 4426/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/129

National ID Number Tariff LT-E-NORMAL

Address KADAMTOLA ,ISHURDI

Mobile No(Owner) 01718980646 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330011227 Old Meter Number 62809038

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12366 Transformer Name KHADO GUDAM-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 2/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD.ALTAF HOSSAIN BISHWASH Consumer No 72013440

Father’s /Husband Name Account Number 7/C

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/136

National ID Number Tariff LT-C1-NORMAL

Address PABNA ROAD ,ISHURDI

Mobile No(Owner) 01714958413 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 22 Maximum Demand(MD)

New Meter Number 20330011229 Old Meter Number 012438

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12366 Transformer Name KHADO GUDAM-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 3/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name ABU TAHER Consumer No 72013311

Father’s /Husband Name Account Number 676/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/140

National ID Number Tariff LT-E-NORMAL

Address THANA PARA BUTTER FLY ,ISHURDI

Mobile No(Owner) 01721800675 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330011230 Old Meter Number 96802270

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12391 Transformer Name KRISHI OFFICE-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 4/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name BUTTERFLY MARKTING Consumer No 72016054

Father’s /Husband Name Account Number 4559/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/142

National ID Number Tariff LT-E-NORMAL

Address PABNA ROAD ISHURDI,PABNA

Mobile No(Owner) 01721800675 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 20 Maximum Demand(MD)

New Meter Number 20330011216 Old Meter Number 96802271

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12391 Transformer Name KRISHI OFFICE-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 5/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD.RUHOL AMIN BISHAS Consumer No 72013231

Father’s /Husband Name Account Number 3736/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/147

National ID Number Tariff LT-E-NORMAL

Address REL GATE PABNA ROAD ,ISHURDI

Mobile No(Owner) 01775893838 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330011217 Old Meter Number 06872659

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12393 Transformer Name RAIL GATE-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 6/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name RUPOSHI BANGLA SHEBA CLINICK Consumer No 72010418

Father’s /Husband Name Account Number 2101/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/148

National ID Number Tariff LT-E-NORMAL

Address REL GATE ,ISHURDI

Mobile No(Owner) 01712130482 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 20 Maximum Demand(MD)

New Meter Number 20330011218 Old Meter Number 51560214

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12393 Transformer Name RAIL GATE-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 7/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MANAGER MARKENTAIL BANK Consumer No 72033278

Father’s /Husband Name Account Number 6095/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/135

National ID Number Tariff LT-E-NORMAL

Address PRO:MD. SHAJAMAL ,PABNA

Mobile No(Owner) 01714958413 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 45 Maximum Demand(MD)

New Meter Number 20330011228 Old Meter Number 1448620

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12362 Transformer Name FAYER SERVICE-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 8/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. BIPUL HOSSAIN Consumer No 72013432

Father’s /Husband Name Account Number 498/C

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/138

National ID Number Tariff LT-C1-NORMAL

Address POST OFFICE MORE ,ISHURDI

Mobile No(Owner) 01712564566 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 4 Maximum Demand(MD)

New Meter Number 20330011379 Old Meter Number 62575960

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12391 Transformer Name KRISHI OFFICE-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 9/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. SHAJAHAN ALI Consumer No 72028318

Father’s /Husband Name Account Number 5514/E

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/141

National ID Number Tariff LT-E-NORMAL

Address POST OFFICE ROAD ,ISHWARDI

Mobile No(Owner) 01721800675 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 20 Maximum Demand(MD)

New Meter Number 20330011215 Old Meter Number 62576214

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12391 Transformer Name KRISHI OFFICE-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 10/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. MONJUR AND ABDUR ROHMAN Consumer No 72013524

Father’s /Husband Name Account Number 762/C

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/121

National ID Number Tariff LT-C1-NORMAL

Address PABNA ROAD ,ISHWARDI

Mobile No(Owner) 01712136499 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 8 Maximum Demand(MD)

New Meter Number 20330011381 Old Meter Number 96802227

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12364 Transformer Name ALOBAG MOR-200

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 11/13
1/16/24, 11:46 AM NESCOworkOrders

Northern Electricity Supply Company Ltd.

SMART PREPAYMENT METER INSTALLATION FORM

Name of the Office Ishwardi S&D Feeder Name TOWN

Feeder Code 51 DCU Number

Consumer Name MD. EAMUDDIN BISHWASH Consumer No 72013450

Father’s /Husband Name Account Number 505/C

Mother’s Name Bill Group / Book/ Work order Number 7215 / 77L/124

National ID Number Tariff LT-C1-NORMAL

Address PABNA ROAD ,ISHWARDI

Mobile No(Owner) 01925455587 Mobile No(User)

New Meter Type Poly Phase Meter Old Meter Type Poly Phase Meter

Sanction Load(KW) 2 Maximum Demand(MD)

New Meter Number 20330011382 Old Meter Number NOTFOUND

New Meter Reading (kWh) Old Meter Reading (kWh)

Installation Team Number Last Billed Reading

Transformer Code 12366 Transformer Name KHADO GUDAM-250

Connection Type Offline New meter installation date

List of Recovery Material

List of Accessories Used Service Drop Cable length (if any):

Seal Numbers(New Meter) Seal Numbers(Old Meter)

Old Meter Photo New Meter Photo GPS Coordinates

(,)

I THE UNDERSIGNED CONSUMER/ON BEHALF OF CONSUMER HEREBY CONFIRM THAT MY OLD ENERGY METER IS REPLACED BY THE
ABOVE MENTIONING NEW SMART PRE PAYMENT METER. THE LAST READING OF MY ENERGY METER IS TAKEN BEFORE DISMANTLING
INFRONT OF ME.

I HAVE NO OBJECTION AGAINST THE ABOVE INFORMATIONS & INSTALLATION SERVICE PROVIDED HEREWITH.

Signature of Consumer: Date:

Signature of authorized Signature of authorized


Star Representative (Site) Star Representative (Office) representative of project (NESCO) representative of S&D (NESCO)

59.152.63.251:59101/hes/# 12/13
1/16/24, 11:46 AM NESCOworkOrders

59.152.63.251:59101/hes/# 13/13

You might also like