GLA Level 03 Total GLA Parking Quantities 0 5m 10m 20m 50m

Department Area GENERAL NOTES


101087 m² Level Count
Scale 1:500 All rights reserved.
Tenant Storage 536 m²
All drawings and written material appearing here,
Grand total: 4 536 m² LEVEL B1 1952 constitute original and unpublished work of the
LEVEL 01 741 Architect and may not be duplicated, used or
disclosed without written consent of the Architect.
CP 02 659
Notes and material designations are typical for
CP 03 660 similar
conditions unless otherwise indicated.
4012
All dimensions and setting out are for design intent
and subject to appropriate coordination and
construction tolerances.

Do not scale from this drawing.

Structural Note:

1. All Mall levels indicated at Finished Floor Level (FFL)


all retail units to be FFL minus 100mm.

2. Slab edges at Mall openings 20mm back from void


edge / bridge line.

3. Slab edge to outside face perimeter wall columns

4. Bridges to be 4000mm wide.

1:15
1:10 1:10 1:11
1:22

Ventilation
MAJID AL FUTTAIM GROUP.
CORE C
Unit Size Thresholds
Ventilation
MOB
Comms. F&B
Ventilation
38 m²
Substation F&B Tenant Seating
Elec. room
Flagship 401-600 m2
Vent. Stairwell
Flagship 601-1000 m2
Stairwell Food Court
Tenant Storage
MOB Elec.
Elec SubStation
118 m²
Elec SubStation Food Court Seating
room
Comms. Hypermarket
room 49 m²
Leisure
CORE B
Elec SubStation Elec SubStation Lineshop 0-150 m2
Lineshop 151-400 m2
ETS Room

ST-07
Major 5001+ m2
238 m² 1:12
148 m² Mini Major 1001-2500 m2
Mini Major 2501-5000 m2

Gas Meter
500 m² Room

Skylight above
Unit abbreviations :-
Stairwell
67 m²
MOB
Elec. Comms.
FC ### - Food Court Unit
room room
FS ### - Food Court Seating Area
CORE A
LS ### - Licensed Seating Area
ST-08 ST ### - Storage Area
120 m²

1:12

ETS Room

Elec
Substation 1:11

IT

Vent.
11 m²
Elec. BOM Elec. MOB
Storage room
room
26 m²Stairwell Comms. Stairwell Comms.
Storage

Vent. CORE D CORE E 99 m²


T 09-04-14 Final Scheme Design Issue
CAR
PAR
K
139 m² S 03-04-14 Updated Leasing Plans
R 28-03-14 BOH Study
Comms. Q 21-03-14 Scheme Design GAs
BOM
ST-05 P 18-03-14 Updated Leasing & Fire Strategy
150 m² N 13-03-14 Updated Leasing Plan
Elec.
room
M 28-02-14 For Structural Coordination
L 21-02-14 Updated - Scheme Design Issue
K 07-02-14 Updated - Scheme Design Issue
J 24-01-14 Scheme Design Issue
Stairwell G 20-12-13 Leasing Drawing Update
Elec
Room CORE F REV NO. DATE DESCRIPTION

REVISIONS
Gas ETS Room ETS Room
Meter Room

North

EMERGENCY VEHICLE
KEY PLAN
12 m²
IT

Elec
Substation

Elec Room

Generators Department Legend Almaza City Centre


EM
E CLIENT
RG
EN
CY
CORE G Parking
VE Stairwell CORE H Comms.
HIC Comms. Elec.
LE Elec Substation BOM Elec Substation Elec.
room
75 m² 49 m²
room BOM
Elec. Tenant Storage
Substation
Stairwell

Vent.

ON
PA LY
R
CA K
R

RTKL UK Ltd.
Nexus
25 Farringdon Street, 10th Floor
London EC4A 4AB
Tel: +44 (0)20 7306 0404
Fax: +44 (0)20 7306 0405
www.RTKL.com

SHEET IDENTIFICATION
TITLE

Leasing Plan - Roof


LY
K ON
R
PA R
CA

STATUS

1:10 Scheme Design


PROJECT NUMBER DATE DRAWN: 10/31/13
50-13004.00 SCALE @ A0: As indicated
EL
LEV

17/04/2014 17:23:22
Author
1

DRAWN BY:
CHECKED BY: Checker
EL 0

DRAWING NUMBER
LEV

MAF. Company. Disc. Series. Level. Zone. Drg No. Rev.

002-RTK-A-005-03-XX-001 T