Professional Documents
Culture Documents
Access of Low Income People To Housing-KKB Lahore
Access of Low Income People To Housing-KKB Lahore
Rizwan Hameed1, Obaidullah Nadeem1, Muhammad Adil2, and Muhammad Qasim Ashraf2
1
Department of City and Regional Planning, UET., Lahore
2
Graduate, Department of City and Regional Planning, UET., Lahore
Abstract. Like many other cities in the developing world, Lahore is also facing a severe housing problem. In this regard,
government has taken number of initiatives but these have proved to be inadequate and un-affordable to low income people due
to high land prices. Private sector has also taken initiatives to provide housing. In this context Saiban, an NGO has launched
Khuda-Ki-Basti-4 housing project at Kala Shah Kaku in Lahore with the view to replicate Khuda-Ki-Basti housing scheme
initiated at Hyderabad and which proved to be a successful project primarily due to incremental development approach. This
research attempts to assess that whether KKB-4 is serving its purpose and that land speculators have not jeopardize the access of
low income people to housing.
Results of interviews with residents show that the criteria necessitating stay in the reception area within 45 days is one of the key
factor ensuring that only low income people have access to plots. People are happily living there and proud to be part of Khuda-
Ki-Basti project despite some concerns relating to infrastructure and amenities. The project has the potential to be replicated by
the public sector agencies provided it gets conceptual acceptance of decision makers.
I. INTRODUCTION
Housing has been observed and conceptualized in different ways in the literature. As a shelter it
is described as a social necessity recognized all over the world in terms of most important need
of the man, after food [1]. Housing as a basic necessity holds an important place in the general
strategy of development for its socio-economic characteristics [2].
Housing can be regarded as a fundamental right since it forms an indispensable part of human’s
life and ensures their dignity, protection and privacy. It fulfills social needs of basic gathering
and acts as an important source where relationships are forged and nurtured. The right of
adequate housing should be interpreted in a wider spectrum. It contains freedom and entitlements
such as protection against forced evictions, arbitrary destructions and demolition, security of
tenure, availability of facilities, affordability, habitability, non-discriminatory access, cultural
adequacy, restitution of housing, land and property along with participation in housing related
decision making at national and community level.
1
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
In cities of developing countries, urbanization and arising pseudo-urban economy is giving birth
to immense poverty among rapidly growing urban population [3]. In most of the developing
countries, these urbanization processes have led to a massive shortage of housing and qualitative
deficiencies [4] and as a result vast majority of urban population cannot afford cost of
conventional housing. This puts a great pressure on existing housing supplies as national
governments and private developers in developing countries are unable to cope up with the ever
increasing demand. Different projects that were initiated to address the housing issues ended up
in a fiasco and many of them which were meant for urban poor ended up in middle class
housing. As a result, different modes of rental accommodations have been built in the developing
countries for vast majorities and majority of the poor live on rent [5]. Similarly, there are hardly
some developing countries which do not have any low income housing arrangement in the form
of slum or squatter settlement providing housing to the poor. In fact slums and squatter
settlements are a synopsis of poor quality houses and it is conventionally supposed that such
settlements exhibit a major housing problem and are clear indicator of housing shortages in the
cities of developing countries.
Pakistan is rapidly urbanizing country in South Asia and with the ever expanding cities, access to
affordable housing is a key issue for Pakistani middle and lower income class [6]. As per the
World Bank statistics, the 37% of the total population of Pakistan is now living in urban areas
and it is expected to grow further in the near future [7]. Like many other developing countries,
Pakistan is also facing severe problems of housing shortage and the situation is more precarious
in urban areas. Reference [6] highlights that the urban housing shortage is estimated at 3.5-4
million units, nearly all amongst the segments of population with low affordability. For instance,
in Lahore the second largest city in the country, households at the bottom 68% of the income
distribution can only afford 1% of the available housing stock, while households at the top 12%
of the distribution can afford 56% of available housing. Similarly, reference [8] note that in the
Punjab Province, a number of factors have been contributing to negatively affect urban land and
housing markets and thus forcing poor people to live in low quality housing. In particular, “The
supply of serviced land is constrained by widespread public ownership of land; inadequate trunk
infrastructure provision to developable sites; complicated property rights; land titling and
registration systems, and inappropriate and inefficient land use plans and regulations; rent
controls; and highly and distorting taxes. These impediments make it difficult for land and
housing markets to respond to housing demand and, as a result, land and housing prices are
expensive. Consequently, most households are priced out of the formal market and nearly 50
percent of housing is produced through informal procedures without infrastructure, titling, and
planning.” P. 14.
The Government of Pakistan has been trying to address the problem of housing shortage. The
national housing policy [9] suggested different strategies to improve the prevailing housing
conditions. These comprised of institutional development and capacity building by empowering
stakeholders, introduction of innovative approaches for screening of eligible households for
2
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
incremental housing finance, endorsing new ideas such as reduce standards, regulating squatter
settlements, introducing incremental approach, and promoting community participation. Despite
the fact that state endeavored to provide housing but the efforts could not produce desired results
as expected owing to various reasons ranging from institutional and financial inadequacies,
inappropriate policies and regulations through to scarcity of developed land, hike in land prices
in the wake of land speculation and corruption [10], [11].
Additionally project was facilitated at various levels including: social, financial and technical.
For instance, in regard to last mentioned element, residents and newly arrived inhabitants
received building and design assistance, orientation of public infrastructure and amenities,
designing of floor plans and received assistance in the provision of suitable building materials
from informal construction sector. All of the mentioned elements, as well as the provision of a
site and layout plan, which included the designation of 15% of the area for public amenities and
public spaces, contributed to the relatively fast consolidation of the KKB community.
Furthermore, the local authorities and KKB administration managed to eliminate land
speculations in the project area. In order to gain access to the plot, applicants had to present
themselves with the whole household and all household’s goods. They were¸ at the very first
instance, accommodated in a provisional camp, the ‘reception area’, where they had to live for
about a fortnight to prove themselves as deserving family. Secondly, the beneficiaries did not
receive allotment letters for their plots, immediately after access to plot. Instead, after a first,
modest down payment, a small monthly amount-easily payable and negotiated amount- had to be
deposited for infrastructure provision. ‘Only when the full costs of the plot and infrastructure
have been paid will allotment papers be issued. In this way, any long absence from the plot can
be punished by cancelling the application and, with it, the allocated plot’pp-86-7. [12].
3
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
Shah Kaku in Lahore in 2006. The Saiban is an NGO headed by former Director General of
HDA who was the mastermind behind the successful implementation of incremental housing
approach at Gulshan-e-Shahbaz housing scheme at Hyderabad.
III. RESULTS
The Khudaki Basti Schemes 1-3 have been launched on government sponsored land in Karachi.
However, due to lack of any support by any development authority, Saiban had to purchase the
land for the commencement of KKB-4 near Kala Shah Kaku in Lahore with the help of few
donors and investor at the rate of Rs. 10 lac per acre. The site is easily accessible from G.T road
and it stretches over an area of 191.52 kanal. It has been planned on equally divided 11 blocks
4
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
ensuring compliance with planning and design standards and accompanied by park/open space in
the center to enhance livability. The KKB-4 administration obtained approval of the scheme
from TMA Ferozewala and it took almost one year due to lengthy and cumbersome procedure.
The scheme comprises of 460 plots having dimensions 24’ x 34’ with certain exceptions due to
geometrical constraints. By the time of survey (in 2015), two schools, a mosque and few shops,
electricity and sewerage at KKB-4 have been made available to meet the needs of the residents.
A communal hand pump is used by residents to get water for various needs. This appears to be
slight departure from original concept of providing all services incrementally as done in case of
KKB-1 at Hyderabad because of different target market in Lahore. However, other development
works including water supply, street lights, and parks are planned to be executed gradually. The
plots have been divided into two categories i.e. ordinary and prime. Ordinary plots are
exclusively meant for low income households on subsidized and affordable price following
procedural and validation requirements set by Saiban. On the other hand, prime plots-located on
central spine and periphery-are sold on market rate to cross subsidize infrastructural provision
and affordable housing. This, in turn, helps to contribute towards financial sustainability and
portrays an endeavor to set a precedent for self-sustained low income housing projects. The
ordinary and prime plots were available at the time of survey at the price of Rs. 1, 20,000 and Rs.
3, 90,000 respectively.
5
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
per month. Further inquiry revealed that majority were either salaried workers (52%) or earning
from their small business (26%) whereas remaining were laborers/daily wagers (22%).
Table II provides information about distance of work location of head of household from KKB-
4. It is clear that majority (54%) has to travel more than 15 km daily to reach their work places
which mainly are located in the city. Moreover, most (78%) of them spend Rs. 1000 to Rs. 3000
per month in respect of travelling expenses (see table III). Further investigation revealed that as
many as 86% of interviewed residents uses either public transport or motorcycle as mode of
transport which also indicates that majority belongs to low income class.
Table II: Distance of work location of Table III: Cost incurred per month on transport
household head from KKB-4 Travel cost (Rs) Frequency Percentages
Distance Frequency Percentages
(km) > 1000 10 11.1
<5 4 4.4
1000-2000 47 52.2
5-10 22 24.4
2001-3000 23 25.6
11-15 15 16.7
>15 49 54.5 < 30001 10 11.1
Selected residents were asked also about the reasons for moving out from previous place of
residence to KKB-4 and the responses are presented in table IV. It is clear that most (60%) of
residents shifted to KKB-4 because they were living in rented houses and could not afford to
own a house somewhere else. Similarly, some (12%) left their previous residence due to family
6
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
problems and for some (9%) KKB-4 offered ray of hope to turn the dream of owning a house
into reality.
Under speculation phenomenon, a plot is sold several times through different owners at a much
higher price. In order to corroborate, residents were asked about from whom they bought the
plot. In reply all the selected residents reported that they bought their plots from KKB-4
management except one resident who bought the house from previous owner who sold it after
fulfilling the condition of five years of demonstrated presence at the plot as imposed by Saiban to
curb speculation. Moreover, sale and purchase of plot is restricted and can only be done through
KKB administration thus further lowering the chances of speculation.
It was equally important to confirm whether residents of KKB-4 have paid the price of plot in
installments. Out of 90 interviewed residents 62 had already paid all the installments. Table V
shows that of those 62 residents, majority (49 of them) paid installments over a period ranging
from 2 to 5 years which obviously is a reasonable timeframe for low income groups to pay the
price of plot at the rate of around Rs. 1000 to Rs. 2000 per month. When asked, majority (82%)
managed to pay monthly installment to buy the plot at KKB-4 through personal savings.
7
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
Table V: Time taken to pay all installments from the year of purchase of plot
No of Year of purchase of plot Total
Years 2007 2008 2009 2010 2011 2012 2013 2014
1 1 1 0 0 5 0 0 2 9
2 2 0 0 3 4 3 2 1 15
3 2 0 6 1 1 2 0 0 12
4 1 0 5 4 1 0 0 0 11
5 1 0 3 7 0 0 0 0 11
6 1 1 0 0 0 0 0 0 2
7 0 1 0 0 0 0 0 0 1
8 1 0 0 0 0 0 0 0 1
Total 9 3 14 15 11 5 2 3 62
KKB4 offers incremental construction approach for the convenience of low income people
without any condition of completion period. In this regard, a question was asked from the
residents whether they agree with it or not. As many as 58% agreed with the incremental
approach, 33% disagree and opined that it’s easy to build the house in one go whereas 8%
remained indifferent to this question. Table VI presents data about construction status of house
with respect to year of occupation.
It is clear that more than half of the interviewed residents were yet to complete the construction
of their house with some even after 7 or 8 years of plot occupation. This finding is in line with
the fact that generally low income people often find it difficult to construct the house in single
8
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
phase primarily because of lack of adequate finance needed to do so. This argument was further
supported by the fact that vast majority of residents of constructed houses in KKB-4 proceeded
with the construction in phases as evident from table VII.
The opinion of residents on condition of KKB-4 to demonstrate need of a plot by residing in the
reception area within 45 days of approval of application was also obtained. The analysis shows
that 52% agreed with this approach and the timeframe given since it help filter out speculators
while some 18% remained indifferent to this question. But another 30% didn’t agree and argued
that either it should not be mandatory or the time period to report to KKB-4 administration for
stay in reception area after approval of application should be enhanced since this involves
considerable time to leave old place of residence, bring all belongings and invest life savings at a
newer place.
The positive attitude of administration and efficient delivery is a key factor towards success of
any organization. Therefore, a question was also asked to judge satisfaction level of residents
with KKB 4 administration. While 7% remained indifferent, as many as 52% interviewed
residents were satisfied with the administration due to their cooperative behavior and efficient
response to issues and queries. Still 41% were not satisfied primarily due to inefficient provision
of infrastructure particularly roads and piped water in the wake of incremental approach adopted
by the KKB-4 administration to provide infrastructural facilities progressively using proceeds
from sale of prime plots and installments from occupants of ordinary plots. Nevertheless, on the
whole majority (65%) of interviewed residents had feeling to be proud of being part of KKB-4
9
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
initiative as compared to small minority (18%) for not feeling so while 17% preferred not to
answer this question.
IV. CONCLUSIONS
The analysis of data presented here shows that the criteria necessitating stay in the reception area
is one of the key factors to weed out land speculators and ensuring that only low income people
have access to plot in KKB-4 housing project. The condition to permit sale and transfer of plot
ownership after five years of occupation and physical presence at the plot and that too through
KKB-4 administration further contributes to effectively control speculation. The KKB-4 has
been successful in offering a window of opportunity to low income people to build a home with
legal title for the first time in their lives since most of the people who have moved to KKB-4
were previously living in rented houses. Although some residents have concerns about pace of
infrastructure provision most of the residents feel proud to be part of KKB-4 due to the fact that
they got their own house. The study highlights that Saiban applied the incremental development
approach at KKB-4 with some adjustments in the original approach applied at KKB-1 which
points to the fact that the said approach is flexible and can be replicated by adapting to local
circumstances, a point already noted by reference [13].
V. RECOMMENDATIONS
The experience of KKB-4 indicates that housing at an affordable price can be delivered to meet
the need of low income people without burdening the state. In this context it offer great insight
and a viable option for public sector planning agencies to replicate such initiatives having
potential to ensure affordable housing development. But this obviously cannot be achieved
without conceptual acceptance by the decision makers and bringing changes in existing
regulations to accommodate incremental housing development. A detailed investigation to
understand the dynamics of successful development of KKB-4 will be necessary to come up with
lessons for better replicating such projects not only elsewhere in the country but also in other
developing countries to address the challenge of housing low income groups. Based on such an
assessment standard guidelines may be developed to facilitate the replication process while
keeping in view the local variations in conditions within which such a project is to be executed.
Similarly, while the layout plan of KKB-4 is according to official standards with reasonably
wide streets, equally divided blocks with a park in the center of each block. Furthermore, the
layout plan was approved by the local planning agency though after taking considerable period
of time. But this situation calls for a separate set of regulations both for low income housing
projects involving incremental development approach as well as house construction under such
projects so to ensure replicating this approach with minimal bureaucratic hurdles and more ease.
10
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
ACKNOWLEDGEMENTS
The authors are grateful to Saiban officials and households for sparing valuable time and
providing the requisite information. This article is based on a research project undertaken at the
Department of City and Regional Planning (DCRP), University of Engineering and Technology
(UET), Lahore under the supervision of first author [14]. While no funds were obtained, a
conducive research environment provided by the DCRP is duly acknowledged.
REFERENCES
1. O. Y. Ronke, “Housing in the Third World Cities and Sustainable Urban Developments,”
Developing Country Studies, Vol. 4, No. 8, 2014.
2. D.C.I. Okpala, D.C.I “Financing Housing in Developing Countries: A Review of the
Pitfalls in the Development of Formal Housing Finance Systems,” Urban Studies, Vol.
31, No 9, 1994, In: O, Y, Ronke, “Housing in the Third World Cities and Sustainable
Urban Developments,” Developing Country Studies, Vol. 4, No. 8, p. 112, 2014.
3. A.O. Ozo, “The Private Rented Housing Sector and Public Policies in Developing
Countries: The Example of Nigeria,” Third World Planning Review, 12, pp. 261-279, In:
A. Gilbert, “Third World Cities: Housing, Infrastructure and Servicing,” Urban Studies,
Vol. 29, Nos. 3-4, pp. 435-460, 1992.
4. A. Gilbert, “Third World Cities: Housing, Infrastructure and Servicing,” Urban Studies,
Vol. 29, Nos. 3-4, pp. 435-460, 1992.
5. C. Rakodi, “Rental Tenure in the Cities of Developing Countries,” Urban Studies, Vol.
32, Nos 4-5, pp. 791-811, 1995.
6. H. Shaikh, Housing inequality in Pakistan: The case of affordable housing. International
Growth Centre Note February 2016. Available at:
http://www.academia.edu/31824293/Housing_inequality_in_Pakistan [Accessed October
25, 2017]
7. S. Malik, and J. Wahid, “Rapid Urbanization: Problems and Challenges for Adequate
Housing in Pakistan,” Journal of Sociology and Social Work, Vol. 2, No. 2, pp. 87-110,
December 2014.
8. D. E. Dowall, and P. Ellis, Urban Land and Housing Markets in the Punjab, Pakistan,
Institute of Urban and Regional Development, University of California, Berkeley,
November 2007.
9. Government of Pakistan, National Housing Policy 2001, Islamabad: Ministry of Housing
and Works, 2001.
10. A. Hasan, “Land Contestation in Karachi and the Impact on Housing and Urban
Development,” Environment and Urbanization, Vol. 27, No. 1, pp. 217-230, April 2015.
11. R. Hameed, O. Nadeem, G.A. Anjum, and S. Tabbasum, “Role of Private Sector in
providing Affordable Housing in Lahore,” Technical Journal, Vol. 21, No. IV, pp. 8-16,
2016.
11
International Conference on Sustainable Development in Civil Engineering, MUET, Pakistan (23th – 25th Nov, 2017)
12. J.V.D. Linden, “On Popular Participation in a Culture of Patronage: Patrons and
Grassroots Organizations in a Sites and Services Project in Hyderabad,
Pakistan’, Environment and Urbanization, Vol. 9, No. 1, pp. 81–90, April 1997.
13. A. Rahman and B. Hassan, The Challenges of Expanding Saiban: Scaling Affordable
Housing for Low Income Communities in Pakistan, Acumen Fund Concepts, Acumen
Funds, April 2009.
14. M. Adil and M. Q. Ashraf, “Assessment of Khuda Ki Basti Low Income Housing Project
Kala Shah Kaku, Lahore,” Research Project, Dept. CRP, UET., Lahore, Pakistan, 2015.
12