02 Procedure For Inspection and Thermal Imaging of Busways

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Procedure for Inspection and Thermal

Imaging of Busways
Issue Date 24 Sep 2020 QI.P.6002

Amendment Page
Status: Add Modified Remove
1 DCR No: 45 Rev No.: 01 Rev Date: 02 Apr 2023
Name: Justin Jose Position: QHSE Officer Sign:

Status: Add Modified Remove


2 DCR No: Rev No.: Rev Date:
Name: Position: Sign:
Status: Add Modified Remove
3 DCR No: Rev No.: Rev Date:
Name: Position: Sign:

Status: Add Modified Remove


4 DCR No: Rev No.: Rev Date:
Name: Position: Sign:
Status: Add Modified Remove
5 DCR No: Rev No.: Rev Date:
Name: Position: Sign:

Status: Add Modified Remove


6 DCR No: Rev No.: Rev Date:
Name: Position: Sign:
Status: Add Modified Remove
7 DCR No: Rev No.: Rev Date:
Name: Position: Sign:
Status: Add Modified Remove

8 DCR No: Rev No.: Rev Date:


Name: Position: Sign:
Status: Add Modified Remove
9 DCR No: Rev No.: Rev Date:
Name: Position: Sign:
Status: Add Modified Remove

10 DCR No: Rev No.: Rev Date:


Name: Position: Sign:

DCR No: 45 Rev No:01 Rev. Date 02 Apr 2023 Page 2 of 7


Procedure for Inspection and Thermal
Imaging of Busways
Issue Date 24 Sep 2020 QI.P.6002

1. Scope

The purpose of this procedure is to streamline and standardize the process of Inspection and Thermal
Imaging of Busways. The scope of the Infrared Scan is limited to the use of the Thermal Imaging Camera to
perform a non-invasive and non-destructive examination. Infrared scanning (IR) accurately identifies the
presence of abnormal heat in electrical systems, which can help predict equipment trouble. This procedure is
applicable to employees, who are involved in the provision of Inspection and Thermal Imaging of Busways..

2. Referenced Standards
- SBC 401 Chapter 61
- ISO 18251-1

3. Equipment & Tools Used


FLIR E60 Infrared Camera
4. Procedure

TUV Austria ensures that a qualified and experienced Inspector is delivering this service with the help of a
Calibrated Infra-red Camera. Inspector shall perform the service taking steps including but not limited to;

• Review the Scope of Work to understand the work volume and Meeting with client focal point to
prepare a schedule.

• Indentifying items, which are to be inspected, with the help of client representative.

• Review the previous inspection reports if available.

• Taking all necessary Safety precautions prior to inspection.

• Ensuring removal of protection screens/covers by the client to gain access to the components.

• Ensuring application of full load to Electrical Appliances and Components prior to inspection.

• Performing Thermography Imaging Inspection with a calibrated Infrared Camera.

• Comparing the recorded temperature to the temperature range as mentioned below under General
Acceptance / Rejection (Delta T) Criteria for Electrical Equipment.

• Preparing an independent report with colour photographs.

DCR No: 45 Rev No:01 Rev. Date 02 Apr 2023 Page 3 of 7


Procedure for Inspection and Thermal
Imaging of Busways
Issue Date 24 Sep 2020 QI.P.6002

4.1. General Acceptance / Rejection (Delta T) Criteria For Electrical Equipment :

ANSI/NETA Suggested Actions Based on Temperature Rise


R
Priority Delta T between similar Delta T over ambient Recommended Action
equipment under similar air temperature
load
4 1-3⁰C 1-10⁰ Possible deficiency; warrants
investigation
3 4-15⁰C 11-20⁰ Indicates probable deficiency; repair as
time permits
2 ------ 21-40⁰ Monitor until corrective measures can
be accomplished
1 >15⁰C >40⁰ Major discrepancy; repair immediately

5. Checklist for Inspection of Busway

DCR No: 45 Rev No:01 Rev. Date 02 Apr 2023 Page 4 of 7


Procedure for Inspection and Thermal
Imaging of Busways
Issue Date 24 Sep 2020 QI.P.6002

6. Report

DCR No: 45 Rev No:01 Rev. Date 02 Apr 2023 Page 5 of 7


Procedure for Inspection and Thermal
Imaging of Busways
Issue Date 24 Sep 2020 QI.P.6002

DCR No: 45 Rev No:01 Rev. Date 02 Apr 2023 Page 6 of 7


Procedure for Inspection and Thermal
Imaging of Busways
Issue Date 24 Sep 2020 QI.P.6002

DCR No: 45 Rev No:01 Rev. Date 02 Apr 2023 Page 7 of 7

You might also like