Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

SAP PRODUCTION PLANNING (PP) T - CODES

• SAP PP provides some shortcut codes to save time and


effort these codes are known as transaction codes (T-
Codes)
• These transaction codes consist with alphanumeric that
take us directly to the desired screen.

Work Centre transaction codes:


T-CODE DESCRIPTION
CEWB Engineering Workbench

CC04 Display product structure

CR01, CR02, and Create, change and display work centre


CR03 respectively.
CA85 Replace work centre

CR11, CR12, and Create, Change and Display capacity


CR13 respectively
CR21, CR22, and Create, Change and Display hierarchy
CR23 respectively
CR60 This transaction code is used for Work
centre information system
CR05 Work centre list

CR06 Cost centre assignments

CR07 Work centre capacities

CR08 Work centre hierarchy

1
CA80 Work centre usage

CR15 Capacity usage

CR10 Work centre change document

CR03 Display work centre

CR13 Display capacity

CR23 Display hierarchy

BOM Transaction Codes:


T-CODE DESCRIPTION
CS01, CS02, and Create, Change and Display BOM.
CS03
CS11 Explode BOM level by level – single and
multilevel
CS12 Explode multi-level BOM

CS13 Display summarized BOM

CS03 Display single-level BOM

2
Routing Transaction Codes:
T-CODE DESCRIPTION
CA01, CA02, and Create, Change and Display routing
CA03 respectively
CA11, CA12, and Create, Change and Display reference
CA13 operation set respectively.
CA12, CA22, and Create, Change and Display rate
CA23 routing respectively.
CA31, CA32, and Create, change and Display reference
CA33 rate routing respectively.
CA85 Replace work centre

CA95 Replace reference operation


set/reference rate routing
CA75 This transaction code is used for
Replace PRT
CA97 Schedule material masters

CA96 Update material masters

CA99 With archiving

CA98 Without archiving

CA70 PRT use

CA90 Reference operation set usage

CA80 Work centre usage

3
CA51 Print list

CA60 Routing changes

CA63 Rate routing display documents

CA64 Reference rate routing change


documents

Capacity Transaction Codes:


T-CODE DESCRIPTION
CM21 Capacity levelling work centre view –
Capacity planning table
CM22 Capacity levelling work centre view –
Capacity planning table (tabular form)
CM27 Capacity levelling individual capacity
view – Capacity planning table
CM28 Capacity levelling individual capacity
view – Capacity planning table (tabular
form)
CM31 Capacity levelling order view –
Capacity planning table
CM23 Capacity levelling order view –
Capacity planning table (tabular form)
CM25 Variable capacity levelling: Online

CM40 Variable capacity levelling: Execute in


the background

4
CM41 Variable capacity levelling:
Background log
CM32 Capacity levelling project view –
Capacity planning table
CM26 Capacity levelling project view –
Capacity planning table (tabular form)
CN22, CN23 Capacity requirements – Change,
display network respectively
MD12, MD13 Capacity requirements – Change,
display planned order respectively
CM01 This transaction code is used for
Capacity evaluation work centre view:
Load
CM02 Capacity evaluation work centre view:
Orders
CM03 Capacity evaluation work centre view:
Pool
CM04 Capacity evaluation work centre view:
Backlog
CM05 Capacity evaluation work centre view:
Overload
CM07 Variable capacity evaluation

CM50 Extended evaluation: Work centre view

CM51 Extended evaluation: Individual


capacity view
CM52 This transaction code is used for
extended evaluation: Order view

5
CM53 Extended evaluation: Project view:
WBS element/operation
CM54 Extended evaluation: Project view:
Version
CM55 Extended evaluation: Work
centre/Version

Planning Transaction Codes:


T-CODE DESCRIPTION
MD25, MD26, and Create, Change and display planning
MD27 calendar respectively.

MDL1, MDL2, and Create, Change and Display


MDL3 production lot respectively

MD01 Total planning online

MDBT Total planning in background

MD03 This transaction code is used for


Single-item, single-level planning
MD02 Single-item, multi-level planning

MD43 Interactive single-item planning

MD50 Multi-level, make-to-order planning

6
MD51 Multi-level project planning

MD20, MD21 Create and Display planning file entry


respectively.

MD11 and MD12 Create and change planned order


respectively

MD13 and MD16 Individual and collective access of


planned order respectively
MDLD print MRP list

MD61, MD62, and Create, Change and display planned


MD63 independent requirements respectively

MS31, MS32, and Create, Change and Display planning


MS33 scenario respectively.
MF50, MF52 Change and Display planning table
respectively.
CO01, CO02, and Create, Change, and display
CO03 production control order respectively.

7
© Copyright TagSkills. The copyright in
this work is vested in TagSkills. Please
note and abide by copyright laws. This
presentation is for educational purposes
only, all logos, photos, and information,
etc used in this Presentation is the
property of TagSkills. SAP is a registered
trademark of SAP AG in Germany and
many other countries. We are NOT
associated with SAP.

You might also like