The document outlines a method statement for laying subterranean electrical cables at an LSC site. It involves 17 activities such as opening trenches, manually excavating 75 meters of cable trench over 6 days, pulling and installing cables, testing insulation and conductivity, backfilling trenches, and restoring the site over 26 working days total. Safety personnel will oversee the work which requires electricians, helpers and equipment like shovels, cranes and testing meters.
The document outlines a method statement for laying subterranean electrical cables at an LSC site. It involves 17 activities such as opening trenches, manually excavating 75 meters of cable trench over 6 days, pulling and installing cables, testing insulation and conductivity, backfilling trenches, and restoring the site over 26 working days total. Safety personnel will oversee the work which requires electricians, helpers and equipment like shovels, cranes and testing meters.
The document outlines a method statement for laying subterranean electrical cables at an LSC site. It involves 17 activities such as opening trenches, manually excavating 75 meters of cable trench over 6 days, pulling and installing cables, testing insulation and conductivity, backfilling trenches, and restoring the site over 26 working days total. Safety personnel will oversee the work which requires electricians, helpers and equipment like shovels, cranes and testing meters.