Name : RAMMER PAKPAHAN

ACTIVITIES AT SINGATAC
no Date Time Activities
1 16-Nov-23 08.00 - 12.00 - Security Check
-Safety Induction
-PPE
13.00 - 18.00 -Performed visual inspection and DFT check
on 2 unit Grillage at white tent

-Assissted internal inspection at jetty area

2 17-Nov-23 08.30 - 09.40 Performed Visual inspection and DFT check 2 nd coat
on 5 bundles plate
10.00 - 12.00 Performed Visual inspection and DFT check internal
final inspection on 2 unit grillage at white tent
13.00 - 14.30 Pull off test Batch 1 and 3
14.30 - 17.00 Performed visual inspection and dft check at blasting
chamber after application 2nd coat on stairs,bundle
plate and various small items
17.00 - 18.00 Installed dolly for test panel batch 2

3 18-Nov-23 08.30 - 09.30 Performed visual inspection and dft check for internal
final inspection on 5 bundle plate after rectifying
09.30 - 12.00 Performed visual inspection and dft check for internal
on Base Frame for station 1 at jetty
13.30 - 14.30 Performed visual inspection and dft check for internal
on Base Frame for station 2 at jetty
14.30 - 16.00 Assissted inspection final top coat at warehouse
on 2 unit grillage type 1
16.00 - 18.00 Assissted inspection visual and dft check
on base frame for station 1 and 2 at jetty

4. 19-Nov-23 08.30 - 09.30 Performed internal final inspection top coat


- Bundle 13 pcs
-2 connecgtor base frame station 2
09.30 - 12.00 Performed internal final inspection top coat at jetty
on :
- 2 rigid support frame
- Base frame station 2
Performed final inspection on Base frame station 1

5 20-Nov-23
Comment

Cleaned the surface and rectified damage area


Build up the thickness

cleaned the surface and rectified damage area


build u\p the thickness
Visual and dft ok

cleaned the surface and build up dft

visual and dft ok

visual and dft ok

visual and dft ok