The document lists 24 entries describing work done on a road project. It includes details like the chainage numbers for start and end points, material used (sub grade top level, GSB top level, wet mix macadam), length of each segment, and notes on box culverts. The total length for each material is provided: 1890m for sub grade top level, 1820m for GSB top level, and 1820m for wet mix macadam. It is noted that 70m has been deducted from some totals due to box culverts.
The document lists 24 entries describing work done on a road project. It includes details like the chainage numbers for start and end points, material used (sub grade top level, GSB top level, wet mix macadam), length of each segment, and notes on box culverts. The total length for each material is provided: 1890m for sub grade top level, 1820m for GSB top level, and 1820m for wet mix macadam. It is noted that 70m has been deducted from some totals due to box culverts.
The document lists 24 entries describing work done on a road project. It includes details like the chainage numbers for start and end points, material used (sub grade top level, GSB top level, wet mix macadam), length of each segment, and notes on box culverts. The total length for each material is provided: 1890m for sub grade top level, 1820m for GSB top level, and 1820m for wet mix macadam. It is noted that 70m has been deducted from some totals due to box culverts.
No Discription of work From To Side Bill In Length Remarks
1 Sub Grade Top Level 83100 83350 SPS-01 250 2 Sub Grade Top Level 83350 83700 SPS-01 350 3 Sub Grade Top Level 83700 83900 SPS-01 200 4 Sub Grade Top Level 83900 84300 SPS-01 400 5 Sub Grade Top Level 84300 84840 SPS-01 540 6 Sub Grade Top Level 84840 84870 SPS-02 30 7 Sub Grade Top Level 84900 85020 SPS-02 120
Here 70m is Deducted for Box Culverts Have Been
Total 1890 Rectified By The BRO in SPS-01 Note - Above Have Been Already Taken In SPS-01 & SPS-02
This chainage is left out so need to make
7 GSB Top Level 83100 83200 100 the documents 8 GSB Top Level 83200 83500 SPS-02 300 9 GSB Top Level 83500 83600 SPS-02 100 Box Culvert 83+610 (3x3) 10 GSB Top Level 83620 83700 SPS-02 80 11 GSB Top Level 83700 84015 SPS-01 315 Box Culvert 84+020 (2x2) 12 GSB Top Level 84025 84715 SPS-01 690 13 GSB Top Level 84725 84840 SPS-01 115 Box Culvert 84+840(4x3) 14 GSB Top Level 84900 85020 SPS-01 120
Total 1820 Here 70m is Deducted for Box Culverts
Note - Above Have Been Already Taken In SPS-01 & SPS-02