Cold Work Permit
Cold Work Permit
Cold Work Permit
Chemical Cartridge Clean up any liquids/spill Falling or Dropped Objects Incompetent Personnel
ICC HSD-23/04038a SSIC Toolbox Talk HSD TBT Mech repair DMO B due to
leaking on 29 Apr 2024.pdf
SECTION 4: ENDORSEMENT
The work described in Section 1 to be undertaken subject to compliance with the requirements stipulated in Section 2 & 3.
VSP Sup Name: Nguyen Ba Quan Designation: VSP Supervisor Date/Time: 28-Apr-23 16:18
AA Name: Hy Tac Sang Designation: TLJOC Production Sup Date/Time: 28-Apr-23 17:57
SECTION 5: AUTHORISATION
I hereby give my approval for the work described in Section 1 to issue in accordance with the validity period below
From: 07:00 Date: 29-Apr-23 To: 18:00 Date: 30-Apr-23
OIM Name: Nguyễn Ngọc Tân Designation: TLJOC OIM Date/Time: 29-Apr-23 06:54
SECTION 6: INITIAL SITE GAS TEST (When required)
Date/time of testing LEL% H2S O2 % CO Others Equipment No AGT Date/time input
ppm ppm
29-Apr-23 07:00 0 0 20.8 0 No.1 Nguyen Ba Quan 29-Apr-23 07:16
SECTION 7: ISSUE
I, Area Authority, declare that all hazards have been identified and all specified control measures are in place and it is now safe for the
work specified on the WP to be performed.
AA Name: Hy Tac Sang Designation: TLJOC Production Sup Date/Time: 29-Apr-23 07:19
I, VSP Supervisor, accept and assign my PA to perform properly the work in accordance with the conditions stipulated on this Permit.
VSP Sup Name: Nguyen Ba Quan Designation: VSP Supervisor Date/Time: 29-Apr-23 07:19
I, Performing Authority, have read and understand the above conditions and precautions. I accept responsibility for carrying out work as
specified. I will ensure the persons under my control read, understand and comply with these conditions and precautions. I will notify
the VSP Supervisor/Area Authority on completion or interruption of this work.
PA Name: Doan Thanh Mai Designation: VSP Mechnical Tech Date/Time: 29-Apr-23 07:19
I, VSP Supervisor, have checked at worksite and confirmed that the statement of PA above is accepted.
VSP Sup Name: Nguyen Ba Quan Designation: VSP Supervisor Date/Time: 29-Apr-23 16:27
I, Area Authority, agree that the work has been properly performed, all involved persons have been withdrawn, the equipment and plant
have been left in a safe condition and clean. This PTW can be cancelled.
AA Name: Hy Tac Sang Designation: TLJOC Production Sup Date/Time: 29-Apr-23 16:27
I, VSP Supervisor, have verified and confirmed that the revelant certificate processing as below:
þ ICC, SSIC, CSEC already removed þ The worksite/equipment is returned to normal service
o ICC, SSIC, CSEC still in place o The worksite/equipment can't returned to normal service
VSP Sup Name: Nguyen Ba Quan Designation: VSP Supervisor Date/Time: 29-Apr-23 17:00
I, OIM, satisfied that the Permit and related documentation complies with the requirements of the PTW System, and declare the PTW is
cancelled. Any lessons learned have been communicated to the workforce and the Process Owner.
OIM Name: Designation: Date/Time: