AP-01 Proposal For Water Intake-AP-01
AP-01 Proposal For Water Intake-AP-01
00M
10.00M
1.00M
1.00M
10x1x3M Gabion Wall
0.80M
1.00M
3.00M
7.00M
Section A-A
10.00M
1.00M
0.75M 0.30M
7.00M
0.30M 0.75M 7.00M
A
A 4.90M
1.50M
RRM 1:5 with both side plaster 1:5 CS
0.70M
2.00M 1.00M
10x1x3M Gabion Wall
0.30M
0.80M
40MM PVC Pipe to Outlet Water to near Road
Plan View
1.00M
5.78M
5.78M
M 7.00M
90
Section A-A
9.
C B
9.
5
2M
0.75M 0.30M
7.00M
0.30M 0.75M 7.00M
A
A 4.90M
6M
.6
1.50M
RRM 1:5 with both side plaster 1:5 CS
10
0.70M
12
2.00M
.5
0M
5.78M
5.78M
0.30M
40MM PVC Pipe to Outlet Water to near Road
D Plan View
A
CLIENT: CONTRACTOR:
NEPAL ELECTRICITY AUTHORITY, NEPAL
Notes:
PINGGAO GROUP CO.,LTD
1. All the dimension are in meter, otherwise specified
CONSULTANT: PROJECT:
POWER GRID CORPORATION OF INDIA LTD. 220 kV Chilime Hub – Trishuli-3B
Hub Transmission Line under 220kV
SURVEYED BY: Chilime -Trishuli Transmission
SAHAN ENGINEERING CONCERN PVT. LTD. System Project
PREPARED BY TITLE:
CHECKED BY Water Intake along Leg B&C of AP-01
APPROVED BY DWG.NO.: SHEET NO :01
Print Size: ISO A3 Scale: Not in Scale PG/NEA/220KV/CHI-TRI/MS/01