Professional Documents
Culture Documents
ANAA - HSE - 022 - F5 - Permit - To - Work - Lifting. 14 01 2024
ANAA - HSE - 022 - F5 - Permit - To - Work - Lifting. 14 01 2024
ANAA - HSE - 022 - F5 - Permit - To - Work - Lifting. 14 01 2024
NAME OF THE CONSTRUCTION SUPERVISOR PRESENT DURING LIFTING WORK : OMAR BELKHCHINE
DAILY REVALIDATION
SCT Construction Team Check
DATE START TIME SIGNATURE FINISH TIME SIGNATURE
(Name / Signature)
1/6/2024
1/7/2024
1/8/2024
1/9/2024
1/10/2024
1/11/2024
1/12/2024
SCT
1. Check equipment load chart, and load weight Const
- Mobile crane (whether lifting plan was delivered or not)
lifting 2. Check operation of overload prevention device and see if limit is
(Before work) lifted SCT
3. Confirm access to work area is restricted (Assignment of HSE
أعمال الرفع. signalman and banksman, and zoning)
2. Lifting
Work الخ، البكرة، الحبال السلكية، أصفاد الرفع، تفقد مخطط الرفع و حالة حبال الرفع1
- عملية ربط الحبال
تفقد درجة تحمل المعالق-2 F/M
( و معدات، سلسلة،بكرة inchar
وكذلك،تفقد الموجه أو المشرف المعين للتحكم في األعمال المتزامنة في مستويات عليا وسفلى-3' ge
)رفع أخري.
.حظر منطقة الرفع
Remarks
LIFTING PLAN (Below 20Tons)
Project NAAMA CCPP Date 14 / 01 / 2024
Subcontractor CERI Date of lifting 14 / 01 / 2024
Supervisor on site OMAR BELKHCHINE
Description of Lifting Activity LIFTING OF THE INLECT DUCT ROOF PLATE
LOAD LINE
a) Hook Block Capacity Ton b) Size of Cable (mm) 0
d) Cable Capacity
c) Number of Line Pull Ton
per chart
e) Maximum Capacity of Load Line ( c x d) .00 Ton
3/12
CRITICAL LIFTING PLAN (20Tons AND OVER,50M and Higher)
Position Name Position Name
Supervisor Rigger
Crane Operator Rigger
Ground Conditions
Have assurances been obtained that the ground can withstand the load? Yes / No
Reviewed(HSE Manager)
Name/Signature Date / / 20
Attachment obligatory
Attachment #1 Crane position, Weight position, Swing of boom, Working radius, Length of
- Drawings Including; boom, Angle of sling when lifting, Location of lifting lugs, Foundation
Attachment #2
Load Chart
- Crane Load Chart
4/12
CRITICAL LIFTING PLAN (Tandem Lifting)
Project NAAMA CCPP Date / / 20
Subcontractor Date of lifting / / 20
Supervisor on site
Description of Lifting Activity
Note : Tandom lifing should be below 75% for Crane Capacity
1. Main Crane / 1st Crane
Details of Load Load Position 1 Load Position 2 Load Position 3
Weight of load Ton Ton Ton
Dimensions (m x m x m)
Max. height of lift from ground(m)
Weight of Hook Block(Ton) 0.0 Ton 0.0 Ton 0.0 Ton
Weight of lifting tackle (Ton) 0.0 Ton 0.0 Ton 0.0 Ton
LOAD LINE
a) Hook Block Capacity 10 Ton b) Size of Cable (mm)
d) Cable Capacity
c) Number of Line Pull Ton
per chart
e) Maximum Capacity of Load Line ( c x d) .00 Ton
5/12
CRITICAL LIFTING PLAN (Tandem Lifting)
2. Tailing Crane / 2nd Crane
Details of Load Load Position 1 Load Position 2 Load Position 3
Weight of load Ton Ton Ton
Dimensions (m x m x m)
Max. height of lift from ground(m)
Weight of Hook Block(Ton) 0.0 Ton 0.0 Ton 0.0 Ton
Weight of lifting tackle (Ton) Ton Ton Ton
LOAD LINE
a) Hook Block Capacity Ton b) Size of Cable (mm) 0
d) Cable Capacity
c) Number of Line Pull Ton
per chart
e) Maximum Capacity of Load Line ( c x d) .00 Ton
6/12
CRITICAL LIFTING PLAN (Tandem Lifting)
Position Name Position Name
Supervisor Rigger
Crane Operator Rigger
Ground Conditions
Have assurances been obtained that the ground can withstand the load? Yes / No
Reviewed(HSE Manager)
Name/Signature Date / / 20
Attachment obligatory
Attachment #1 Crane position, Weight position, Swing of boom, Working radius, Length of
- Drawings Including; boom, Angle of sling when lifting, Location of lifting lugs, Foundation
Attachment #2
Load Chart
- Crane Load Chart
7/12
LIFTING PLAN (Additional Lifting work)
Project NAAMA CCPP Date / / 20
Subcontractor Date of lifting / / 20
Supervisor on site
Description of Lifting Activity
Details of Load Load Position 1 Load Position 2 Load Position 3
Weight of load 1 Ton 1 Ton 1 Ton
Dimensions (m x m x m) 100*100*100
Max. height of lift from ground(m) 3 3 3
Weight of Hook Block(Ton) 1.0 Ton 0.0 Ton 0.0 Ton
Weight of lifting tackle (Ton) 2.0 Ton 0.0 Ton 0.0 Ton
Calculation Chart 1st 2nd 3rd
Total weight 4 Ton 1 Ton 1.0 Ton
Max crane capacity at radius 0.0 Ton 0.0 Ton 0.0 Ton
Capacity Ratio (%) - Max 90% 0.0% 0.0% 0.0%
Details of Crane Load Position 1 Load Position 2 Load Position 3
Maker & Model (Model No.)
Capacity (Ton)
Max. boom length for Lifting
Max. Working radius from center of
crane (m)
Jib Length (m) and offset Angle
(if needed)
Counter Weight (Ton)
Outrigger Span (fully)
Mat Size (M X M)
LOAD LINE
a) Hook Block Capacity Ton b) Size of Cable (mm) 0
d) Cable Capacity
c) Number of Line Pull Ton
per chart
e) Maximum Capacity of Load Line ( c x d) .00 Ton
Lifting tackle (Spreader Bar, Sling, Schakle)
1. Spreader Bar (If need)
a) Capacity Ton b) Weight Ton
2. Sling
a) Capacity b) Q'ty
c) Capacity (At angle used) Ton d) Total Weight of Slings 0.0 Ton
f) Total Rigging capacity (2b x 2c) Ton
3. Schakle
b) Total Weight of
a) Schakle Capacity and Q'ty Ton/ Set Ton
Schakles
Position Name Position Name
Supervisor Rigger
Crane Operator Rigger
Ground Conditions
Have assurances been obtained that the ground can withstand the load? Yes / No
Prepared (In charge person) Name/Signature / / 201
Approved ((SUB)-Cons't Manager) Name/Signature / / 201
Review (SCT CONS'T Team) Name/Signature / / 201
Approved (SCT PTW Coordinator) Name/Signature / / 201
Obligatory of Attachment #1 Crane position, Weight position, Swing of boom, Working radius, Length of boom,
- Drawings Including; Angle of sling when lifting, Location of lifting lugs, Foundation
Obligatory of Attachment #2
Load Chart
- Crane Load Chart
SLING AND SCHAKLE CALCULATION
1. 2 Points Lifting
L (Length of Sling) 10 m
1. 4 Points Lifting
L (Length of Sling) 10 m
D (Diagonal) 7.0710678118655 m
D B
P
LIFTING PLAN (Below 20Tons)
Project NAAMA CCPP Date 04 Jan 2018
Subcontractor SAMSUNG Date of lifting 10 Jan 2018
Supervisor on site Jockey Lee
Description of Lifting Activity GT Acoustic Barrier Wall panel Material Transportation
LOAD LINE
a) Hook Block Capacity 58.4 Ton b) Size of Cable (mm) 17
d) Cable Capacity
c) Number of Line Pull 3 5.816 Ton
per chart
e) Maximum Capacity of Load Line ( c x d) 17.45 Ton
11/12
LIFTING PLAN (Below 20Tons)
Position Name Position Name
Supervisor Rigger
Crane Operator Rigger
Ground Conditions
Have assurances been obtained that the ground can withstand the load? Yes / No
Prepared
Name/Signature Date / / 201
Reviewed
Name/Signature Date / / 201
Approved
Name/Signature Date / / 201
Attachment obligatory
Attachment #1 Crane position, Weight position, Swing of boom, Working radius, Length
- Drawings Including; of boom, Angle of sling when lifting, Location of lifting lugs, Foundation
Attachment #2
Load Chart
- Crane Load Chart
12/12