DN25 2.90m DN25 2.

90m

0.00m 0.00m

A-VIEW B-VIEW

Ball valve DN25

APPROVED NOTED/INFO/REFERENCE

AWCI RETURNED W/O ACTION


DN25

DN25

B
RFC FOR CONSTRUCTION
CHECKED DATE REVIEWED DATE

RECOMMENDED: MELVILLE A. MUTUC


MECHANICAL DESIGN SUPERVISOR

RENE U. ALBAY
APPROVED:
ELECTRICAL DESIGN MANAGER

DN25

TO DELUGE VALVE A FOR APPROVAL


OWNER:
NATIONAL GRID CORPORATION
OF THE PHILIPPINES
NGCP Building, Power center complex
Quezon Avenue cor BIR Road, Diliman, Quezon City

CONTRACTOR:
NEW NORTHEAST ELECTRIC GROUP HIGH
VOLTAGE SWITCHGEAR CO., LTD.
MANUFACTURER:
NANJING EXCELLENT TECHNOLOGY
INTERNATION CORPORATION
PROJECT NAME: MINDANAO SUBSTATION REHABILITATION PROJECT,
STAGE 1 - SCHEDULE IV (AURORA AND ZAMBOANGA SUBSTATIONS)
NOTE: & MINDANAO SUBSTATION UPGRADING PROJECT,
STAGE 1 - SCHEDULE IV (NAGA SUBSTATION)
1、THE ELEVATION IS THE CENTRE OF THE PIPES. THE ELEVATION UNIT IS m. CONTRACT NO: DRAWING /DOCUMENT DESCRIPTION:
Sp19.MSRP1.Mt-0408(IV) LAYOUT OF PILOT HEAD
THE DIMENSION UNIT IS mm. APPROVED: DATE:
9/16/2021
(SPRINKLER)-100MVA TRANSFORMER
2、ALL PIPES, FITTING SHALL BE MADE OF GALVANIZED IRON SCH. 40 ASTM A53. CHECKED: DATE: Project Location/Name of Substation: SCALE:
9/16/2021 NAGAMIN SUBSTATION NTS
3、THE POSITION OF PIPES AND NOZZLES CAN BE SLIGHTLY ADJUSTED ACCORDING TO THE ACTUAL SITUATION ON SITE DRAWN: DATE: DRAWING NO: SHT. NO.: Rev. Ind.:
9/16/2021 0408 (IV) NAA 8125 Q 001 A 19 of 23 1
PREVIOUS DRAWING NO: 0408 (IV) NAA 8125 Q 001