Professional Documents
Culture Documents
Delineated Flowchart
Delineated Flowchart
Delineated Flowchart
MANUFACTURA ESBELTA
Actividad 2 T2
“Delineated Flowchart”
• Customer: Logistics
• Order:
✓ Lot of 360 pieces.
✓ Packing : 30 p/t.
✓ Sizes: Small – Medium – Large.
✓ Color: White with blue details.
✓ Company name embroidery: Navy
blue.
DELINEATED FLOWCHART
Area Position Time
Company name: Textiles Marelyn
5 min 15-20 min 5 min 2 hrs 4 min 2 min
Home Process
Start
Start
Client
Costumer´s need Deliver the order
Design Deliver the
to buy shirts
approval by order
according to their
costumer
specifications.
Sales Cashier
Take the
order to the
costumer
Manufacturing Operators
Oncethe
Once thedesign
designis
is approved,
approved, productions
productions
begins
begins
Finance Cashier
Receive
payment for
the order
“DELINEATED FLOWCHART” Company name: Textiles Marelyn / T-shirt production process
Area Position Time
15-20 min 20 min 30 min 15 min 20 min 30 min 5 min
Home Process
Start
Cut Operator
Cut the fabrics
to make the
shirts
Embroidery Operator
Assemble the
parts to finish
the shirts
Packing Operator
Iron, fold and
pack the shirts