Professional Documents
Culture Documents
Cims-23s-9459 SL-292
Cims-23s-9459 SL-292
Above Equipment was inspected by CIMS in accordance with applicable Saudi Aramco GI's, ASME and API standards.Deficiencies that require
corrective actions are listed below. Specific repairs to correct each deficiency should be noted in the action taken column.
when re-inspected is requires a complete copy of this report should be ready for review by the inspector
I agree to take full responsibility for this inspection اواوافق الى تحمل المسؤليه الكامله عن هذا الفحص
Contact : +966-558220217