Item ref Description of work Total cost Item ref Description of work Total cost
1 excavation 50.230
2 compacting 99.040
3 polthenye sheet 31.500
4 blinding concrete 46.780
5 concrete for footing 138.310
6 steel for footing
7 bitumen paint
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
365.860
Page 1
Cost of the construction Jalaan Mosque
Total cost
Page 2