I II III
OBJECTIVES AND BLOCKAGE, SOME
ORIENTATION CHALLENGES COMMENTS
PDP VIII FOR RE
DEVELOPMENT
2
CONTENTS
I II III
OBJECTIVES AND BLOCKAGE, SOME
ORIENTATION CHALLENGES COMMENTS
PDP VIII FOR RE
DEVELOPMENT
3
OBJECTIVES AND ORIENTATION OF POWER DEVELOPMENT PLANVIII UP TO
2030
IMPLEMENTING A JUST ENERGY
ENSURE NATIONAL ENERGY TRANSITION
SECURITY • RE will reach 30.9-39.2% by 2030 (towards the
• GDP growth of 7% period 2021-2030 target of 47% in case JETP is fully and substantially
‣ Power sale 8.8%, Power production 8.7% implemented.
period 2021-2030 • Control GHG (204-254 million tons CO2 by 2030)
‣ (Sale/production 2030 will reach and about 170 million tons of CO2 if JETP is fully
505.2/567 billion kWh) and substantially implemented
‣ Pmax: reach 90,500 MW by 2030
5
5
CONTENTS
I II III
OBJECTIVES AND BLOCKAGE, SOME
ORIENTATION CHALLENGES COMMENTS
PDP VIII FOR RE
DEVELOPMENT
6
BLOCKAGE, CHALLENGE
FOR RE DEVELOPMENT
Other issues
Infrastructure is not complete
Legal framework The data is not reliable enough
National technical standards National marine security and
for renewable energy defense
development Management, operation and
Strategy - Policy
Long-term, stable, consistent Decision on the use of professional contractor for
Planning with the reality of renewable marine space human resource capacity
Renewable energy energy development, making The licensing and survey development
resource planning is the most of and exploiting process is clear and Power grid and logistics are not
clear, integrated and all renewable energy sources transparent complete
must be long-term Attractive, attracting social Harmonized power purchase Localization of equipment is still
Related planning ensures resources agreement low
consistency and legality Support the development Guaranteer the connection
(marine space planning, chain, localization, and cost to the power grid
land use planning...) reduction Loan regulations
7
CHALLENGES IN IMPLEMENTING ONSHORE WIND POWER PROJECTS
THE CURRENT PRICE BRACKET DOES NOT ENCOURAGE RE
01 DEVELOPMENT, IT IS DIFFICULT TO ATTRACT INVESTORS, ESPECIALLY
IN THE NORTHERN REGION
IT TAKES 7-10 YEARS TO DEVELOP AN OFFSHORE WIND POWER PROJECTS => IF THE LEGAL BASIS OF
RELEVANT REGULATIONS... IS NOT COMPLETED, THE POSSIBILITY OF ACHIEVING THE TARGET OF
DEVELOPMENT OF OFFSHORE WIND POWER IS VERY DIFFICULT; CAUSING EFFECTS ON ELECTRICITY 9
9
INVESTMENT MOBILIZATION CHALLENGES
10
10
CONTENTS
I II III
OBJECTIVES AND BLOCKAGE, SOME
ORIENTATION CHALLENGES COMMENTS
PDP VIII FOR RE
DEVELOPMENT
11
SOME COMMENTS TO ACHIEVE RE DEVELOPMENT OBJECTIVES
13
13