Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

RESTORATION OF DAMAGED CONCRETE PAVEMENT, COVERED WALKWAY, PASSENGER TERMINAL BUILDING, SCOURED

PORTION OF SEAWALL & REPAINTING OF SECURITY FENCE


Port of Bulado, Guihulngan City, Negros Oriental

EQUIPMENT RATE SCHEDULE

Qty Unit PARTICULARS Capacity RATE PER HOUR


1 unit Backhoe .90 cu.m. 1,150.00
1 unit Bar cutter 185.00
1 unit Clam shell .90 cu.m. 230.00
1 unit concrete cutter 32.63
1 unit concrete vibrator 91.25
1 unit dump truck 10 cu.m., min 1,050.00
1 unit Jack hammer w/ compressor 250 cfm 917.88
1 unit One bagger concrete mixer 172.00
1 unit oxy/acetylene cutting outfit 300.00
1 unit road roller 10 T 950.00
1 unit transit mixer 8 cu.m. cap 1,200.00
1 unit truck mounted crane 25T 1,300.00
2 units welding Machine 300 amp 180.00
1 lot Barricades 2,500.00
1 lot warning devices 3,500.00
1 unit Fire Extinguisher 32.37

BIG J STEEL CORPORATION/ ROGEL U. SALVADOR - President

Name of Bidder/Authorized Representative


( Signatory's Legal Capacity)