Bypass To Hanota Cs

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A A

PROPOSED CROSS SECTION


C/L
SHOULDER PROPOSED CARRIAGEWAY SHOULDER
EXISTING CARRIAGEWAY
1.50 1.625 1.875 1.875 1.625 1.50 B
3.0% 3.0 %
3.5% 3.5 %
2:1
2:1

7.20
11.50
Bituminous Concrete BC 30 mm
Dense Bituminous Macadam DBM 50 mm
Hard Shoulder CBR> 12% TCS-1 Wet Mix Macadam WMM 250 mm D
Drainage Layer CRM 150 mm
Profile Corrective Soil CBR>7%
Existing Crust CROSS SECTION AS PER DPR
TYPICAL CROSS SECTION AT CH. 0.00M TO 630.00 AND 1000.00 TO 3230.00 M

C/L
PROPOSED CARRIAGEWAY
3.50 3.50
2.5% 2.5 % F

Bituminous Concrete BC 30 mm
Dense Bituminous Macadam DBM 50 mm
EXISTING C.C. ROAD
EXISTING RCC DRAIN TCS-2 EXISTING RCC DRAIN
G

TYPICAL CROSS SECTION AT CH. 630.00M TO 1000.00M

H
C/L
SHOULDER PROPOSED CARRIAGEWAY SHOULDER
EXISTING CARRIAGEWAY
1.50 1.750 1.750 1.750 1.750 1.50
2.50% 2.50 %
2.5% 2.5 %
2:1
2:1 J

3.50
7.20 K
11.50
Bituminous Concrete BC 30 mm
Dense Bituminous Macadam DBM 50 mm
Hard Shoulder CBR> 12% Existing C.C. Wet Mix Macadam WMM 250 mm
TCS-3 Drainage Layer CRM 150 mm
Profile Corrective Soil CBR>7%
Existing Crust L
TYPICAL CROSS SECTION AT CH. 3230.00M TO 3915.00 M
PROJECT NAME ROAD DETAIL CONSULTANT APPROVAL AUTHORITY CONSTRUCTION AGENCY NORTH SHEET NO: MPUDC-BPTH-RC-04
S
DEVELOPMENT OF ROAD FROM BYPASS TO 0+000M TO 3+240 M AATVIK CONSULTANCY MADHYA PRADESH URBAN DIAMOND INFRA CONSTRUCTIONS E

17 January 2024 19:54:03


HANOTA VILLAGE AT KHURAI (M.P.) & DEVELOPMENT COMPANY PRIVATE LIMITED SCALE: NTS REVISION: 00
DRAWING NAME INFRASTRUCTURE LLP
M LTD. BHOPAL (M.P.) CHENNAI W M
CROSS SECTION VIDISHA (M.P.) N DATE: 04.12.2023
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like