Rop Sinaw Cable & Water Line Route

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TRANSFORMER YARD

5130 800 6000 800 6000


800L COLUMNS AT EVERY 6 MTRS TYPICAL (20 NOs.)
14100

200
200 9500 200 4000

5130 800 6000 800 6000


6500

1500

1200

1000
EARTH CABLE

1465
B

1700
POWER CABLE

1855
2000
1855
DRAIN PIPE

500
2300 2000 1450 POWER CABLE

A 2000 150 1500 1500 1000


1200

280

5 KL BULK TANK
1000

3000

5200
EXISTING BLOCK
TRANSFORMER YARD BLOCK WALL
5800

WALL (TYP.)
WATER PIPE LINE

NEW AMF PANEL


1600
PROPOSED BURRIED WATER PIPE LINE
3 STEPS 3 STEPS
PROPOSED BLOCK WALL
CABLE ROUTE PATH

500
RECONFIRMED AT SITE N1 @4000mm Height from
EXISTING CABLES TO BE NGL

1200
UP
PROPOSED BURRIED 5500Lx2300Wx800H UP
CABLE ROUTE PATH GENSET FOUNDATION

5200
5500

1200
500
9200

300
FEEDER PILLER PANEL (EXISTING)
1200 EARTH CABLE
POWER CABLE

4000
FUEL FILLING /
CAM LOCK
455
600
700
1000

EXISTING BLOCK

1350
WALL (TYP.) WATER TAP
METERING PANEL (EXISTING)
Earth Cable
PROPOSED BLOCK WALL
Power Cable @4000mm Height from
NGL
3200

Power Cable

WATER PIPE LINE 3 MTRS WIDE GATE


A Ø100mm SLEEVE

2300
2000
FOR LUBE OIL DRAIN /

1845
PROPOSED BLOCK WALL REFILL PROVISION.
@4000mm Height from
NGL
CLUSTER WALL
1000 3000 1200

600 3500 1400

9500 A
ELV

CABLE & WATER


LINE ROUTE

You might also like