90

NOTES:
1. fcu=40 N/mm 2

o
180
2. f y =460 N/mm2
o
360

N
o
270

Engineering Affairs Sector

Building Department

COLUMNS SCHEDULE
C1 50 8 T 16
(20X50) T10 @ 15 cm

20
C2 50 10 T 16 NOTES
(20X50) T10 @ 15 cm

20
80
C3 12 T 16
T10 @ 15 cm

20
(20X80)
20
N.C 4 T 16

20
UP TO T.B LEVEL ONLY
(20X20) T8 @ 15 cm

A B C D E F G H I J K L M N O
49.52
4.82 4.10

0.20 4.60 3.18 2.82 3.70 2.30 4.30 4.30 2.30 3.70 2.50 3.50 3.40
0.22
NC NC C2 C1 C1 NC C1
1 C2
C2 C2 C1 C1 1
P(T.B)= 10 T C2 P(T.B)= 22 T P(T.B)= 18 T P(T.B)=11 T P(T.B)= 16 T P(T.B)=12 T
P(T.B)= 18 T P(T.B)= 10 T P(T.B)= 8 T P(T.B)= 18 T
P(T.B)=10 T
P(T.B)= 12 T
C1 P(G.F)= 12 T P(G.F)= 23 T C2 P(G.F)= 25 T P(G.F)= 30 T P(G.F)= 26 T P(G.F)= 11 T P(G.F)= 11 T
P(T.B)= 25 T
P(G.F)= 29 T P(T.B)= 15 T P(G.F)= 13 T P(T.B)= 9 T
Pu(tot)= 22 T Pu(tot)= 43 T Pu(tot)= 46 T P(G.F)= 28 T P(G.F)= 22 T P(G.F)= 15 T
Pu(tot)= 45 T Pu(tot)= 44 T Pu(tot)= 21 T Pu(tot)= 19 T Pu(tot)= 47 T Pu(tot)= 25 T
Pu(tot)= 53 T Pu(tot)= 37 T Pu(tot)= 24 T

OWNER:
4.40

4.40
0.80
2.50
0.10 P(T.B)=14 T C3
P(T.B)=7 T
P(T.B)=7 T
P(T.B)= 14 T P(T.B)= 14 T P(T.B)= 16 T P(T.B)= 17 T P(T.B)= 18 T
AL RASIKHOON REAL STATE EST-CO
P(T.B)= 19 T NC NC P(T.B)= 17 T P(T.B)= 17 T P(G.F)= 16 T P(G.F)= 18 T P(G.F)= 30 T NC P(T.B)= 24 T P(G.F)= 22 T P(G.F)= 26 T
P(T.B)= 17 T
P(G.F)= 23 T P(G.F)= 15 T Pu(tot)= 39 T
1.20

1.20

P(G.F)= 15 T Pu(tot)= 30 T Pu(tot)= 32 T P(G.F)= 31 T

1.10
P(G.F)= 15 T Pu(tot)= 46 T Pu(tot)= 44 T
Pu(tot)= 42 T Pu(tot)= 32 T Pu(tot)= 32 T Pu(tot)= 55 T
NC Pu(tot)= 32 T P(T.B)=13 T
0.20

0.20

0.20

0.20
2 C2 2 PROJECT DESCRIPTION :
0.10

0.10

0.10
0.10

NC
C2
C2 C2 P(T.B)= 14 T C1 C1 C1 NC NC C2 NC
P(G.F)= 34 T 0.22 P(T.B)=14 T P(T.B)=19 T C1 C1 P(T.B)=21 T P(T.B)=8 T
9.70

9.70
0.20 P(T.B)= 6 T PROPOSED RESIDENTIAL
1.90

1.90
Pu(tot)= 48 T
1.60 P(G.F)= 16 T
0.20 0.20 0.20
NC NC
1.60 C1 C1 C1
0.02
C1 P(T.B)=4 T
Pu(tot)= 22 T
BUILDING G
C1
0.20

3 C1 C1 C1 C1 3
P(T.B)=6 T P(T.B)=6 T
P(T.B)= 13 T P(T.B)= 9 T P(T.B)= 9 T P(T.B)= 13 T NC
P(T.B)= 11 T P(T.B)= 16 T P(T.B)= 5 T P(T.B)= 14 T P(T.B)= 10 T P(T.B)= 19 T
1.50

1.50
P(G.F)= 15 T
P(G.F)= 20 T
Pu(tot)= 31 T
P(G.F)= 15 T
Pu(tot)= 28 T Pu(tot)= 24 T
P(G.F)= 15 T P(G.F)= 5 T
Pu(tot)= 14 T
P(G.F)= 6 T
Pu(tot)= 11 T
P(G.F)= 19 T
Pu(tot)= 32 T
P(G.F)= 16 T
Pu(tot)= 30 T
P(G.F)= 10 T P(G.F)= 16 T
Pu(tot)= 35 T
DRAWING TITILE :
Pu(tot)= 31 T Pu(tot)= 20 T
C1
4 C1 4
P(T.B)= 5 T
P(G.F)= 15 T COLUMNS LAYOUT
1.90

1.90
P(T.B)= 11 T
P(G.F)= 14 T 2.31 Pu(tot)= 20 T
Pu(tot)= 25 T
C1
5 5
C1
P(T.B)=14 T P(T.B)= 5 T
P(G.F)= 9 T
PLOT NO. ARCH. ENG.
Pu(tot)= 14 T
2883 Zineddine
SECTOR STRUC. ENG.
Masfout Sector KHALED
DISTRICT M.E.P. ENG.
MASFOUT AHMED EL TOHAMY

JOB. NO. DRAWN BY :


NOUFAL KP
SCALE CHECKED BY :
1:100 Zineddine
ST COLUMNS LAYOUT SHEET NO. DATE :
ST-01 1:100 ST 01 JUNE / 2023
90

o
NOTES:
180
o
360

* THE LOAD OF COLUMNS ARE ULTIMATE BY TONS. 2


N 1. fcu=40 N/mm
o
270

2. f y =460 N/mm2
* OVER BURDEN FILL AND SELF WEIGHT ARE CONSIDERED IN
THE EXCEL SHEET FOR FOOTINGS DESIGN.
* THE BEARING CAPACITY OF SOIL IS 200 KN/M 2 FOR SOIL REPORT
SHALLOW FOUNDATION. CONSULT SOIL TEST LAB.
Engineering Affairs Sector
* THE DEPTH OF FOUNDATION IS NOT LESS THAN 1.25m . REF NO :CST-2020-3614
Building Department
*THE EXCAVATION LEVEL TO BE COMPACTED USING HEAVY
VIBRATORY ROLLER.

A B C D E F G H I J K L M N O NOTES
49.52
4.82 4.10
1.00
4.60 3.18 2.82 3.70 2.30 4.30 4.30 2.30 3.70 2.50 3.50 3.40

0.65
F1 F2 F2 F* F2 F* F2 0.69 F3 F2 F* F2 F1 F1
1 1
1.40

1.40

1.40

1.50

1.40

1.00

1.10
1.40

1.70

1.80

1.70

1.40
Pu= 21 T Pu= 19 T
P(T.B)=11 T P(T.B)=12 T P(T.B)=10 T
Pu(tot)= 46 T Pu(tot)= 47 T Pu(tot)= 25 T
Pu(tot)= 45 T

0.65
Pu(tot)= 22 T Pu(tot)= 44 T Pu(tot)= 53 T Pu(tot)= 37 T Pu(tot)= 24 T
Pu(tot)= 43 T C.F1
1.70 1.70 1.90 1.70
1.10 1.70
1.40 1.80 1.40
1.90
4.40

4.40
1.00
1.00 0.55 F3

1.50
F* P(T.B)=14 T
F*
1.00

0.65
1.70

1.00
2.10 1.40 1.40
1.10
P(T.B)=7 T F* 1.40 P(T.B)=7 T 1.90 1.00
1.40 1.10 1.10

0.70
1.00 Pu(tot)= 39 T Pu(tot)= 44 T
Pu(tot)= 32 T Pu(tot)= 46 T
Pu(tot)= 42 T
F2 Pu(tot)= 55 T P(T.B)=13 T
F1 F** F1 Pu= 32 T F**
2 F* Pu= 30 T F*
2
1.40

1.00
1.40

1.70

1.70
1.70

1.10

1.10

1.10

1.10

1.50
F2 F*
F1 P(T.B)=14 T Pu(tot)= 32 T P(T.B)=19 T P(T.B)=21 T P(T.B)=8 T
F3 F2
Pu(tot)= 32 T
F2
9.70

9.70
3.40
1.90

1.90
1.00 Pu(tot)= 48 T
1.40 1.70
C.F2
F* F* 1.40 Pu(tot)= 22 T
0.54 F2
1.00

F1 F1 Pu= 11 T F1 F1 P(T.B)=4 T F1

1.40
3 3

1.10

1.10

1.10

1.40
P(T.B)=6 T P(T.B)=6 T

0.50
Pu(tot)= 24 T Pu(tot)= 31 T Pu= 14 T
0.54
Pu(tot)= 32 T Pu(tot)= 30 T F* Pu(tot)= 20 T
Pu(tot)= 35 T
F1
1.50

1.50
1.40 1.40 1.40 1.10
F1 F1 F1
4 4
1.10

1.10

Pu(tot)= 31 T Pu(tot)= 28 T Pu(tot)= 20 T


1.90

1.90
1.00
Pu(tot)= 25 T F1
F*
1.40

1.40

5 5
1.00

F1 P(T.B)=14 T Pu(tot)= 14 T

1.10

OWNER:
AL RASIKHOON REAL STATE EST-CO

SCHEDULE OF FOOTINGS (G ONLY).


PROJECT DESCRIPTION :
SIZE OF R.C.C. BOTTOM STEEL TOP STEEL PROPOSED RESIDENTIAL
TYPE a (cm) b (m) H (m) SHORT BAR LONG BAR SHORT BAR LONG BAR
REMARKS
BUILDING G

F1 1.40 1.10 0.35 Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C ----- ----- ISOLATED FOOTING


DRAWING TITILE :
F2 1.70 1.40 0.40
1.25

Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C ----- ----- ISOLATED FOOTING


FOOTINGS LAYOUT
VARIES

F3 1.90 1.50 0.40 Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C ----- ----- ISOLATED FOOTING


0.10

P.C.C
CF1 1.80 1.80 0.50 Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C COMBINED FOOTING PLOT NO. ARCH. ENG.
2883 Zineddine
SHALLOW FOUNDATIONS CF2 3.40 2.10 0.50 Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C Ø 16 @ 20 cm C/C COMBINED FOOTING
TYPICAL CROSS SECTION SECTOR STRUC. ENG.
F** 1.10 1.10 0.35 Ø 12 @ 20 cm C/C Ø 12 @ 20 cm C/C ----- ----- ISOLATED FOOTING Masfout Sector KHALED

F* 1.00 1.00 0.35 DISTRICT M.E.P. ENG.


Ø 12 @ 20 cm C/C Ø 12 @ 20 cm C/C ----- ----- ISOLATED FOOTING
MASFOUT AHMED EL TOHAMY

JOB. NO. DRAWN BY :


NOUFAL KP
SCALE CHECKED BY :
1:100 Zineddine
ST FOOTINGS LAYOUT SHEET NO. DATE :
ST-02 1:100 ST 02 JUNE / 2023
90
NOTES:
1. fcu=40 N/mm 2

o
F. F. L (TOC)

180
A 142 mesh
1Y8

2. f y =460 N/mm2
o
360

Y 8 @ 15 C/C
TIE BEAM
AS / SCHEDULE
N
o
270

Y 12 @ 15 C/C
BLOCKWORK WALL
SLAB THICKNESS 18 CM
Y8@20
Y 12 @ 15 C/C
Engineering Affairs Sector
Y 12 @ 15 C/C
Y12@20

50
Building Department

25

10
10
10CM THICK P C C

WELL COMPACTED ROAD BASE LAYER.

20
TYP. SECTION UNDER BLOCKWORK
well compacted sub grade

NOTES

A B C D E F G H I J K L M N O
49.52
4.82 4.10

4.60 3.18 2.82 3.70 2.30 4.30 4.30 2.30 3.70 2.50 3.50 3.40

1 TB2 TB1 TB1 TB2 TB2 TB1 TB1 TB1 TB1


1
TB2 TB1 TB1 TB2

TB1
TB1
TB1 TB1
TB2

TB1
TB2
TB2

TB2

TB2

TB2
TB1

TB2
TB1
4.40

4.40
TB2

TB2

TB1
TB1
TB2

TB2

TB2
TB1 TB1 TB1 TB1
W.F Expansion Joint (2 cm) W.F
TB1

W.F W.F
TB2 TB2
TB1 TB1 TB2 TB1 TB1 TB1

TB2
2 TB1 TB2 2
TB1 TB1
9.70

9.70
TB1
W.F

TB1
1.90

1.90
TB1
TB1
TB1

TB1
TB1

TB1
TB1
TB2 TB2 TB1 TB2 TB1 TB1 TB1 TB2
TB1

TB1

3 TB1 3
TB2

W.F W.F
1.50

1.50
TB1

TB1 TB1
4 4
TB2

TB2

TB1
1.90

1.90
OWNER:
5 TB1 TB1
5 AL RASIKHOON REAL STATE EST-CO

PROJECT DESCRIPTION :
PROPOSED RESIDENTIAL
BUILDING G

DRAWING TITILE :

TIE BEAMS LAYOUT


TIE BEAMS REINFORCEMENT SCHEDULE
PLOT NO. ARCH. ENG.
SIZE BOTT REINF. BOTT REINF. TOP REINF. EXTRA AT TOP STIRRUPS Zineddine
TYPE 2883
B H CONTINUOUS mid span CONTINUOUS OF SUPPORTS
SECTOR STRUC. ENG.
Masfout Sector KHALED
TB1 20 50 2 Ø 16 1 Ø 16 2 Ø 16 2 Ø 16 T 8 / 15 CM C/C
DISTRICT M.E.P. ENG.
TB2 20 50 2 Ø 16 2 Ø 16 3 Ø 16 2 Ø 16 T 8 / 15 CM C/C MASFOUT AHMED EL TOHAMY

JOB. NO. DRAWN BY :


NOUFAL KP
SCALE CHECKED BY :
1:100 Zineddine
ST TIE BEAMS LAYOUT SHEET NO. DATE :
ST-03 1:100 ST 03 JUNE / 2023
90
NOTES:
2

o
1. fcu=40 N/mm

180
o

2. f y =460 N/mm2
360

N
o
270

Engineering Affairs Sector


0.20
DETAIL OF EXTRA STEEL(TYP) T12 /20 cm C/C (TOP & BOTTOM) 0.20

0.25
2Y12

Building Department

0.25
2Y12

FINISH LAYER Y 8 / 20
2Y12
Y 8 / 20
2Y12

1.50
1.50

1.25
1.25
COL

10
AS/PLAN
TOP STEEL :- SLAB

22
BEAM
BEAM
BOTTOM STEEL :-
AS/PLAN
AS/PLAN

SEC IN COL FOR PARAPET


SEC IN PARAPET EXTEND COL UP TO COPYING BEAM
TYPICAL O.T.S OPENING DETAILS
SECTION IN SLAB
NOTES

A B C D E F G H I J K L M N O

49.52
4.82 4.60 3.18 2.82 3.70 2.30 4.30 4.30 2.30 3.70 2.50 3.50 3.40 4.10

1 B1 B1 B2 B2 B1 B1 B2 B2
1
B1 B1

22 cm THICK
B1 B1 22 cm THICK B1
MESH T12 @ 20 cm C/C BOTTOM B1
4.40

4.40
B1 MESH T12 @ 20 cm C/C BOTTOM
MESH T12 @ 20 cm C/C TOP
MESH T12 @ 20 cm C/C TOP

3.00
B1 B2
Expansion Joint (2 cm) B2
3.00

B2
B1
2 B2 B1 2

3.00
3.00

3.00
3.00

3.00
9.70

9.70
3.00 3.00
1.90

1.90
3.00 3.00 B1 B1
3.00
WT B1 B1 B1 B1 B1
B1 B1
3 B1 3
B1 B1
1.50

1.50
B1
B1
4 4
B1
1.90

1.90
OWNER:
B1
5 5 AL RASIKHOON REAL STATE EST-CO

PROJECT DESCRIPTION :
PROPOSED RESIDENTIAL
BUILDING G

DRAWING TITILE :

G.F COVERING SLAB


BEAMS REINFORCEMENT SCHEDULE
BOTTOM RFT. EXTRA AT BOT TOP REINF. EXTRA AT TOP PLOT NO. ARCH. ENG.
TYPE B H CONTINUOUS @ MID-SPAN CONTINUOUS OF SUPPORTS STIRRUPS 2883 Zineddine
SECTOR STRUC. ENG.
B1 20 60 2 Ø 16 1 Ø 16 2 Ø 16 2 Ø 16 T 8 / 15 C/C Masfout Sector KHALED
DISTRICT M.E.P. ENG.
MASFOUT AHMED EL TOHAMY
B2 20 60 2 Ø 16 2 Ø 16 2 Ø 16 3 Ø 16 T 8 / 15 C/C JOB. NO. DRAWN BY :
NOUFAL KP
SCALE CHECKED BY :
1:100 Zineddine
ST G.F COVERING SLAB SHEET NO. DATE :
ST-04 1:100 ST 04 JUNE / 2023