NOTES :
1. ALL DIMENSIONS ARE IN MILLMETRES AND LEVELS ARE IN METERS UNLESS
OTHERWISE MENTIONED
FOR PIERCAP RC DETAILS
2. DRAWING SHOULD NOT BE SCALED, ONLY WRITTEN DIMENSIONS ARE TO BE
REFER SEPRATE DRAWING 01 FOLLOWED.
01
FOR PIERCAP RC DETAILS REFER SEPARATE DRAWING 3. GRADE OF REINFORCEMENT SHALL BE Fe5OOD CONFORMING TO IS: 1786-2008.

LD
(TYP)
4. CLEAR COVER SHALL BE AS FOLLOWS:

300
11 11
LD

A) PILE : 75 mm
B) PILECAP : 75 mm
C) PIER : 40 mm

12

12
10 10 T16-03-RING
F 10
01000 c/c 5. BAR CALL UPS ARE GIVEN AS FOLLOWS:
F
12

14

11
(INNER RING) 10T20-01-150-BF
(TYP)

75
300

POSITION- BF : BOTH FACE


75

SPACING (IF REQUIRED)

02 BAR MARK
DIAMETER OF BAR
13 A A TYPE OF BAR

(TYP)
300
NUMBER OF BARS (OPTIONAL)

6. LAPPING OF BARS SHALL BE 60 D.


3T12-15
T25-01 01 7. CHAIR BARS SHALL BE PROVIDED AT 1000mm c/c TO SUPPORT THE TOP & BOTTOM
REINFORCEMENT AS PER SITE REQUIREMENT.

8. DEVELOPMENT LENGTH OF BARS SHALL BE MINIMUM 36D, WHERE D' IS THE DIAMETER

E LONGITUDINAL CROSS SECTION 03 T12-02-150


9.
OF BAR.

NOT MORE THAN 25% OF REINFORCEMENT SHALL BE LAPPED AT ANY LOCATION


E
( SCALE 1:50 )
(SHOWING PIER REINFORCEMENT ONLY)
(OUTER SPIRAL REINFORCEMENT)
(BAR MARK 15 , 16 , & 17 NOT SHOWN FOR CALRITY) LEGEND:

TRANSVERSE CROSS SECTION FOUNDING LEVEL : CONSTRUCTION JOINT

01
01
C/C : CENTER TO CENTER
( SCALE 1:50 )
: TOP REINFORCEMENT

T20-12-150 (SHOWING PIER REINFORCEMENT ONLY) : BOTTOM REINFORCEMENT

11 REINFORCEMENT T1
T2

B1
: TOP OUTER
: TOP INNER

: BOTTOM QUTER
10T25-10

14 14 14 14 14 14 14 14 14
DETAILS OF PILE
10

12 12 12 12 B2 : BOTTOM INNER
(TYP)

FAV.

D
: FAVOURABLE

D
300

12 T10-14-150 UNFAV. : UNFAVOURABLE

69T25-11 LD : DEVELOPMENT LENGTH

PLAN OF PIER
( SCALE 1:50 )
T20-07-125
( SCALE 1:25 )
(SHOWING PIER REINFORCEMENT ONLY)

T12-09-250 C/C 06 09 SCHEDULE OF REINFORCEMENT


06
(Subject to site check)
07 09 BOTH WAYS BAR BAR
REMARKS
SPACING/Nos. SHAPE
MARK DIA.
08

08
08

08

01 25 22 NOS. 300
FAV.

PILE
450 02 12 150 C/C ---
07
05
07

05
05

03 16 1000 C/C ---


C TYP c/c OF PILE C
(TYP)

05 FAV.
300

04

08

08

04
04 25 125 C/C 300 300
04 05 25 125 C/C 300 300 ---
04 03 06 20 125 C/C 1650 650 ---

PILE CAP
02 ---
(TYP)

07 20 125 C/C 1650 650


300

05 6400
08 16 10 X 4 NOS. 2800 ---
01
SECTION B-B 09 12
250 C/C SHEAR
( SCALE 1:50 ) BOTHWAYS LINK
( SHOWING PILECAP REINFORCEMENT ONLY) 10 25 10 X 2 300 FAV.
11 25 69 X 2 300 FAV.
12 20 150 C/C 6920 ---

PIER
13 16 3X2 300 6920 300 ---
08 C
09 T25-05-125-B2 T20-07-125-T2
08 160

B 08
T25-05-125-B2
300
(TYP)
10T12-08
SECTION A-A 14 10
13 X
150 C/C
1170 --- B
15 12 3X2 300 1170 300 ---
T20-06-125-T1
( SCALE 1:25 )
08

08
08

08

B
B
(TYP)

SECTION C-C
300

08
08 08

08 ( SCALE 1:50 )
C
PLAN AT PILE CAP TOP
(SCALE 1:50)
(SHOWING PILECAP REINFORCEMENT) PROJECT : CLIENT : CONTRACTOR : DESIGN CONSULTANT : REINFORCEMENT DETAILS
OF PIER, PILE CAP, PILE
A FOR P1 TO P10
DATE SCALE DRAWING NO
A
AS SHOWN AES-RJN-R-142

EDUCATION PURPOSE ONLY EDUCATION PURPOSE ONLY EDUCATION PURPOSE ONLY EDUCATION PURPOSE ONLY NAME SIGN.

DRAWN BY

DESIGN BY

11 10 9 8 7 6 5 4 3 2 1

You might also like