Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 29

AFR DAILY JOBS ACTIVITY RECOR

DATE

02.07.2022

03.07..2022

04.07.2022

05.07.2022

06.07.2022

07.07.2022

08.07.2022
09.07.2022
10.07.2022
11.07.2022
12.07.2022
13.07.2022

14.07.2022

16.07.2022

17.07.2022

18.07.2022

19.07.2022
19.07.2022

20.07.2022

21.07.2022

23.07.2022

24.07.2022

25.07.2022

26.07.2022

27.07.2022
27.07.2022

28.07.2022

30.07.2022

31.07.2022
AFR DAILY JOBS ACTIVITY RECORD
JOB DESCRIPTION
Liquid AFR main pump found jam dismanteling done and cleaned and re assembled, trial taken found ok
Apron damage pan repairing work, 5no.s pan made ready
Apron hopper plate found bend, cut and removed also 1no.s roller bracket found damag, cut and removed
Material issued from store for shredder shutdown work
Platform made ready and fixed at 50KL liquid storage tank
During plant stoppage due to power failure BC-100 1no.s impact idlers replaced with new
Grab crane inspection done
Gun metal bush work at workshop
Preheater 2nd floor CM pump line diverting work from calciner to TAD
Shredder stopped after 600 hours for knife rotation work
All knife rotation work done also 6no.s new holder and knife fixed
Knife holders hardfacing done
2no.s bottom center counter knife replaced with new towards from RBC-2 side
Screen reparing done also in RBC-1 side 100mm screen fixed
Both pump filters removed and inspection done found ok no any foreign material found
Screen door shaft additional half flange fixed and welding done

Shredder roto NDE side bearing inspection done found ok also clearance checked found 0.07mm, new EP-2 grease provided

RBC-1 and RBC-2 belt beraing inspection and side skirt replacement
Apron feeder hopper guide plate positioning and welding work
Apron feeder agitator 6no.s angle fixed
Grab crane bottom pulley with gun metal bush replaced with new, only one pulley new and other 3pulleys old.
BC-200 belt patch fastening work
Liquid AFR trolley pump dismantled and inspection done found diaphragm damage
Grab crane inspection work

On leave

CM-3 Shut down work (Bag house bags replacement work)


Liquid AFR Cooler side SV fixed in water line as per process requirement
Shredder Screen repairing work and Door shaft welding done towards RBC-1 side.
Shredder stopped due to screen damage, screen repairing done also found 1no.s counter knife missing
Shredder RBC-3 belt joint Fastner done
Liquid AFR cooler side pipe line work
RBC-3 head drum side hand railing work and RBC-1 tail drum side opening closing done.
Cooler side Liquid AFR IR pump sifted to preheater side and fixed at pump-1.
Shredder screen repairing work
Cooler side Yamada pump outlet inspection and dencil pump valve replacement work
Shredder discharge RBC-2 scrapper got damage, repairing work done
Cooler side liquid AFR Yamada pump replaced with IR pump
Preheater side Liquid AFR pump-1 PH-1 replaced with new IR pump which is inlet and outlet direction is reversed.
Grab crane inspection done in A shift
Liquid AFR Firing pump-1 got jam, dismanteled and cleaning done.
Shredder stopped due to wedge piece found damage, repairing done also shaft welding done
Preheater 2nd floor TAD firing line re routing work done
Maharaja gate odor sheet repairing done
Grab crane inspection done in A shift
Preheater side liquid AFR firing pump-1 motor got jam, motor replaced by electrical team and coupling dismanteling and
assembling work done
AFRE shredder counter knife repairing work
Apron pan repairing work
Both gate odor nozzle replaced with new
Oxygen and LPG cylinder issuig from store
All 6no.s screen replaced with new 80mm screen
All counter knife reapired and fixed
B-20 oil cooler filter removed and cleaning done with air due to alarm

Pump 18.1 rotor pressure fittings got oil leakage due to inside seal found damage, oil leakage arrested temporarily

2no.s knife holder fixed


mechanical joint repairing work RBC-1
Shredder discharge RBC-2 3no.s skirt replaced
Grab crane LT wheel towards Shredder side (apron side) bearing cover bolt found cut 4no.s and bearing came out 3-4mm,
corrective action taken
Both B19.1 and B19 nitrogen top up earlier it was 8bar after top up 12.5bar
AFR grab crane 18mtrs towards maharja gate side rope replaced with new due to rope found damage
AFR grab crane LT drive towardsShredder side (Apron side) bearing housing cover locking done
AFR shredder Screen door shaft towards RBC-1 side welding done
BC-100 belt damage rain hood removed
Apron 1no.s roller and 1no.s bucket replaced during kiln break down
AFR shredder stopped due to stone feeding, during stoppage B18 pump PRV removed and cleaning done also B17 pump
fitting douty seal replacement done
BC-100 belt near apron counter weight added for material scrapping
Material issuing from store
Housekeeping work
Apron 3no.s bucket roller got damage due to load jhoomer feeding, 3no.s bucket to be replace
Grab crane inspection done found ok
EHS OBSERVATION CLOSING AT Shredder rbC-2 gratting
Apron inspection work done
Grab crane inspection done
Shredder shaft welding done towards RBC-1 side
Shredder emergency water line valve replacement
Apron agitator greasing done
Liquid Storage tank agitator greasing work

Shredder stopped at 03:00am due to hydraulic motor side screen damage, screen replaced with old screen, during shredder
starting B17.1 filter pump alarm found frequently due to oil temperature low 42C, hydraulic system run manually to increase
oil temperature till 52C and run the shredder in auto mode
Grab crane bucket got damage, repaiirng work done
Apron inspection done
Grab crane inspection done
Shredder door bolt cut new bolt provided also 2 chain block fixed to hold the door
Shredder RBC-1 hand railing work done
BC-100 tail drum side apron discharge skirt rod provided
Grab crane inspection done
Apron inspection done
RBC-1 magnetic separator belt 1no.s pillow block bearing replaced with new
Shredder hose pipe received from store for inspection and return back to store
RBC-1 magnetic separator head pully NDE side shaft cut, dismantled and repairing done
Goa yard and ratna giri yard sheeting done
D
MANPOWER REMARK
Hanchanal,Abhishek,Minto
Dinesh,Chakku,Ritlal
Arun- night shift
Minto,Abhishek
Dinesh,Govardhan,Minto,Abhishek
Govardhan,Dinesh
Govardhan,minto
Hanchanal-B shift
Arun,Govardhan,Chakku,Ritlal
Shivanand,Asif,Sachin,Mahantesh,Dinesh,Chakku,Ritlal
Shivanand,Asif,Sachin,Mahantesh,Dinesh,Chakku,Ritlal
Shivanand,Asif,Sachin,Mahantesh,Dinesh,Chakku,Ritlal
Shivanand,Asif,Sachin,Mahantesh,Dinesh,Chakku,Ritlal
Shivanand,Asif,Sachin,Mahantesh,Dinesh,Chakku,Ritlal
Shivanand,Asif,Sachin,Mahantesh,Dinesh,Chakku,Ritlal
Shivanand,Asif,Sachin,Mahantesh,Dinesh,Chakku,Ritlal
Shivanand,Asif,Sachin,Mahantesh,Dinesh,Chakku,Ritlal

Hanchanal,Abhishek,Govardhan
Hanchanal,Govardhan,Arun,Abhishek
Hanchanal,Govardhan,Arun,Abhishek
Sunil,Jitender,Baldev,Pundlik
Sanjay,Arun,Chalwadi
Dinesh,Chakku,ritlal,arun,govardhan
Hanchanal,Minto

Hanchanal,Anil,Abhishek,Arun
Dinesh,Arun,Hanchanal,Abhishek
Dinesh,Chakku,Minto,Abhishek,
Hanchanal,Arun,Ritlal
Laxman,Permeshwar,yogesh
Dinesh,Chakku,Govardhan,Hanchanal
Minto,Abhishek,Dinesh,Chakku,Govardhan
Hanchanal,Govardhan,Dinesh
Hanchanal,Govardhan,Dinesh
Hanchanal,Govardhan,Mintoo,Abhishek,Ritlal
Hanchanal,Govardhan,Mintoo,Abhishek,Ritlal
Hanchanal,Govardhan,Mintoo,Abhishek,Ritlal
Hanchanal
Hanchanal,minto,abhishek
Dinesh,Govardhan,Abhishek
Dinesh,Govardhan,Abhishek
Dinesh,Govardhan,Abhishek
Hanchanal,ritlal
Hanchanal,ritlal

Chakku,Mintoo
Dinesh,Mintoo,chakku
Dinesh,Mintoo
Abhishek,Ritlal
Dinesh,Chakku,Ritlal,Govardhan
Asif,Sachin,Mahantesh,Krishna
Krishna,Sachin

Krishna,Sachin
Chakku
Phagu team
Sachin team
Hanchanal,Govardhan

Laxman
Dinesh,Ritlal,Abhishek,Hanchanal,Minto,Sanjay
Phagu team with mallu
Sanjay

Dinesh,Chakku,hanchanal,arun
Asif,Sachin,Jainapur

Dinesh,Chakku
Dinesh,Ritlal

Sanjay
Hanchanal, Abhishek
Chakku,Ritlal
Hanchanal, Abhishek
Hanchanal, Abhishek
Hanchanal,Chakku,Rirlal
Hanchanal,Chakku,Rirlal
Hanchanal,Abhishek
Chakku,Ritlal

Sanjay and chalwadi team

Hanchanal team
Hanchanal,Abhishek
Hanchanal,Abhishek
Govardhan,Arun,Ritlal,Mintoo
Govardhan ,arun (Chakku-Diverted to work shop in phagu gang)
Govardhan,Arun,Ritlal,Mintoo
Govardhan, Arun
Govardhan, ritlal
Govardhan,Chakku,Ritlal,Minto,Arun
Ritlal
Dinesh,Govardhan,Abhishek,Hanchanal,Arun
Phagu team
AFR DAILY JOBS ACTIVITY
DATE
01.08.2022

02.08.2022

03.08.2022

04.08.2022

06.08.2022

07.08.2022

08.08.2022

09.08.2022

12.08.2022

13.08.2022

14.08.2022

15.08.2022

16.08.2022
17.08.2022

18.08.2022

19.08.2022

20.08.2022

21.08.2022

22.08.2022

23.08.2022
24.08.2022

25.08.2022

26.08.2022

28.08.2022

29.08.2022

30.08.2022

31.08.2022
AFR DAILY JOBS ACTIVITY RECORD
JOB DESCRIPTION
Shredder RBC-2 head drum motor platform railing re routing done
Grab crane inspection done
Apron 4 bucket replacement during kiln stoppage (Cooler problem)
Grab crane all drive inspection and pulley greasing work, track bolt tightening
BC-200 belt 1no.s return roller replaced with new
Shredder shut down work
Grab crane LT drive towards shredder side NDE side bearing replacement
Shredder RBC-1 magnetic separator coupling bolt bush replacement
Shredder Hydraulic block to hydraulic motor © Hose pipe fitting O ring replacement
Scra removing
Platform work at Grab crane area
Liquid CM pump 6" butter fly valve got damage need to be replace
210 flap gate cylinder inspection done found ok
Apron chain shifted fom store to maharaja office
Scrap plate shifting from clinker yard to maharaja office for grab crane bucket repairing work
Flushing pump shifted to slag mill and inform to Harinath sir
Main hoist gear box bearing issued from store
Main hoist gear box made ready
6no.s apron bucket repaired at workshop and 1no.s new bucket issued from store also shredder ram cylinder pin issued from
over to shredder operator
Grab crane inspection done by hanchanal and ritlal
Shredder ram cylinder pin came out correction done

Shut down started from 12.08.2022


Apron pan replacement
Apron agitator repaiiring work
Shredder screen damage and RBC-1 side screen door shaft welding found crack- Corrective action done
Shredder RBC-2 permanent magnet height adjusted
Apron pan replacement
RBC-3 tail drum lagging work
RBC-3 head drum lagging and BC-100 tail drum lagging
Apron pan replacement
Grab crane LT drive DE Wheel dismanteling and assembling work, New shaft fixed
Shredder screen repairing and RBC-2 belt adjusting also screen door shaft welding
LT wheel towards shredder side fixed alignment pending
Shredder shaft replacement and RBC-1 side screen replaced with new-100mm
Agitator NDE side bearing clearance 0.10mm also bearing housing plate repaired and packing provided
Apron drives inspection Head drum DE- 0.11mm, nde-0.12mm also coupling checked found ok, coupling center distance-10mm
level ok

Both bottom and top flap gate DP test done by pm cell found ok (Shivanand and shravan), bottom flap gate cylinder to be repl
Grab crane LT drive cpp side motor with coupling replaced with new
Grab crane Lt drive shredder side blade alignment done and trial taken also vibration reading noted
MOTOR NDE H4.9 V3.8 A3.0 DE H4.0 V3.7 A3.2 SHREDDER SIDE
GEAR BOX NDE H1.4 V1.4 A1.3 DE H1.5 V1.7 A1.0 SHREDDER SIDE
MOTOR NDE H2.6 V3.5 A2.5 DE H2.0 V3.7 A3.7 CPP SIDE
GEAR BOX NDE H2.0 V3.6 A2.2 DE H2.4 V3.0 A1.9 CPP SIDE
Shredder RBC-1 side screen got damage replacement done with new 100mm screen also RBC-1 tail drum side side skirt replac
door welding done
BC-200 drive both input and output coupling inspection done found ok
BC-100 drive input coupling ok but output coupling bolt bush found wear also coupling bolt hole size enlarge, new bush with2
provided. Also alignment checked with pm cell found ok
BC-200 belt joint repairing done also side skirt repairing done.
Grab crane track checked found not good alignment to be done
Grab crane LT drive cpp side NDE wheel found abnormal sound while running, need to check
Grab crane 36mtrs wire rope replaced with new towards apron side
Grab crane all pulleys greasing done
Grab crane bucket strengthening done
Grab crane top pulley guide plate repairing done
Grab crane all ct and lt wheel bearing inspection work
Grab crane all drives gear box oil level inspection done
BC-100 belt patch work
Grab crane LT drive CPP side NDE wheel removed and shifted wheel fixed properly and stitch weling done
BC-100 belt patch work
Grab rane LT drive CPP side Drive wheel lifting purpose 30mm plate fixed
Grab crane LT drive Shredder side drive handrailing work done
Grab crane track survey done by mr Bijoy mandal(mines) with pm cell sundaresh sir
Grab crane all LT wheel top cover modification
Grab crane top pully side wire rope guide bush replaced with new both big and small
8mm plate issue from store for extractor discharge chute fabrication and work started
210 flap gate cylinder dismantled found seal damage, new seal not match to cylinder.
Both 210 and 205 flap gate cylinder fork repaired
BC-100 belt drive side skirt board fixed
Preheater 2nd floor by pass chute slide gate and its arrangement removed and made dummy
BC-100 tail drum extractor discharge chute fabrication work
Shredder RBC-3 hopper back side skirt fixed, roller replaced and belt trial and tencioning done also guard fixed
Apron hopper gryzzly bar cut as per process requirement
Shredder screen repaired towards 2no. From hydraulic motor. Top half portion found cut
Grab crane track shredder side 2no.s joint made linear and CPP side 1no. Joint 12mm packing done
Agitator drum hole patch work and apron guard fixed
BC-100 belt tail drum side axtraction discharge side skirt board fixed
Preheater 2nd floor by pass chute slide gate and its arrangement removed and made dummy
SNCR nozzle cooling fan bearing and coupling inspection done found ok also new grease provided
Shredder screen repaired towards 2no. From hydraulic motor.
Extractor agitator repairing work
Extractor platform toe guard fixing
Extractor system drum bolt plate replacement and trial taken but it is not success. Drum lift 200mm and locking done with ang
Extractor weigh feeder tail drum side guard modification and belt adjusted
Extractor and its weigh feeder all bearing greasing done
Shredder screen repairing work
Liquid AFR main firing pump got jam dismanteling and assembling work
Extractor drum height increased from 200mm to 300mm as instructed by TH
Shredder screen welding
Liquid AFR unloading pump hose pipe and filter cleaned
BC-100 belt magnetic separator coupling guard fixed
Liquid AFR earthing cable stand fixed
All scrap removed from shredder side
Extractor apron geared motor dismanreling and assembling work
Motor trial taken after dismanteling 1500rpm/4.0A in Delta condition
Motor trial taken after assembling to gear box 1500rpm/4.5A in Delta condition
geared motor assembled and trial taken at 1400rpm/7.5A in delta condition
Drum lifting trial taken but not success motor taking load but not rotating
Extractor weigh feeder belt sway alarm. Belt adjusted
Shredder screen welding done
Liquid AFR preheater side and cooler side earthing cable stand fixed
Liquid storage tank both 30KL and 50KL agitator greasing done also Castrol Alpha SP 320 oil top up
Shredder RBC-2 belt patching with fastner
New apron panel room roof sheeting work
Shredder RBC-1 magnetic separator coupling bolt inspection done found ok
Grab crane inspection work
Shredder Screen door Bearing housing (RBC-1 side) welding crack, glosing and welding done
Apron pan repairing work
Shredder RBC-1 magnetic separator coupling bolt inspection done found ok
Grab crane inspection work
Shredder screen repairing work
New apron discharge guide plate provided
Shredder screen repairing work
Grab crane inspection work and all wheel greasing done
Shredder screen repairing work
Shredder RBC-1 magnetic separator top pulley pillow block bearing replaced with new
Grab crane inspection work
Hopp feed apron discharge slope plate installation work
MANPOWER REMARK
Dinesh,Chakku
Hanchanal, Ritlal
Dinesh,Chakku,Ritlal, Hanchanal
Govardhan,Mintoo
Arun,Abhishek
All team
Bipin and rameshwar team
Hanchanal,Roshan,Minto
Hanchanal,Roshan,Minto
Hanchanal,Roshan,Minto
Chakku, govardha,ritlal
Arun,Abhishek
Arun,Abhishek
Roshan, Abhishek
Dinesh,Arun
Roshan, Abhishek
Roshan, Abhishek
Roshan,Abhishek,Dinesh,Chakku,Govardhan,Ritlal,Mintoo

Dinesh,Govardhan,Minto,mahesh
Roshan,Abhishek
Dinesh,Govardhan,Minto,mahesh,Roshan,Abhishek
Dinesh,Abhishek
Dinesh,Roshan,Mintu,Mahesh,Abhishek
Govardhan,Hanchanal,Chakku,Arun
Chakku,arun,hanchanal,abhishek
Dinesh,Mahesh,Sanjay
Roshan,Govardhan,Mintu
Dinesh,Mahesh,Sanjay
Roshan, minto, govardhan
Dinesh,Chakku,Arun,Mahesh,Abhishek,Hanchanal
Roshan,Mahesh,Sanjay
Dinesh,Govardhan,Minto

Arun,Chakku,Abhishek
Sanjay,Roshan,Mahesh
Sanjay,Roshan,Mahesh
SHIVANAND PM CELL

Sanjay,Roshan,Mahesh

Hanchanal,Abhishek

Arun,mintu,chakku

Sanjay,Roshan,chakku,mintu
Sanjay,Roshan,chakku,mintu
Sanjay,Roshan,chakku,mintu
Sanjay,Roshan,chakku,mintu
Hanchanal,Abhishek
Hanchanal,Abhishek
Dinesh,Mintu,Mahesh,Arun
Sanjay,Roshan,chakku,mintu
Dinesh,Mintu,Mahesh,Arun
Sanjay,Roshan,chakku,mintu
Sanjay,Roshan,chakku,mintu

Roshan,sanjay,hanchanal
Roshan,sanjay,hanchanal
Dinesh,Mintu,Abhishek,Chakku
Govardhan,arun,mahesh
Govardhan,arun,mahesh
Govardhan,arun,mahesh
Arun,Govardhan,Abhishek
Dinesh,Chakku,Mintu
Hanchanal,Roshan,Sanjay
Roshan,Sanjay
Roshan,Sanjay
Roshan,Sanjay
Roshan,Sanjay
Dibesh,Chakku,Mintu
Govardhan,Mahesh,Arun
Govardhan,Mahesh,Arun
Dinesh,Mahesh,mintu,hanchanal
Dinesh,Mahesh
Roshan,Abhishek
Dinesh,Mahesh,Hanchanal,Mintu
Dinesh,Mahesh,Hanchanal,Mintu
Roshan, Abhishek
Chakku and mahesh
Roshan,Govardhan,Chakku
Dinesh, Govardhan,Roshan,Mahesh
Mahesh,Chakku
Abhishek, Arun
Roshan
Hanchnal, chakku
Dinesh, Govardhan,Roshan,Mahesh
Chakku,Arun,Mahesh,Roshan
Chakku,Arun,Mahesh,Roshan
Chakku,Arun,Mahesh,Roshan
Chakku,Arun,Mahesh,Roshan
Chakku,Arun,Mahesh,Roshan
Chakku,Arun,Mahesh,Roshan
Mahesh,Roshan
Hanchanal,Arun
Arun,Abhishek
Hanchanal,Arun,Mahesh,Abhishek
Dinesh,Chakku,Mintu
Hanchanal,Abhishek
Hanchanal,Abhishek
Chakku,Dinesh
Dinesh,Chakku,Mintu
Roshan
Hanchanal,Abhishek
Chakku,Dinesh
Dinesh,Chakku,Govardhan,
Dinesh,Chakku,Govardhan,
Hanchanal,Abhishek
Dinesh,Chakku,Govardhan,
Roshan,Arun,Mahesh
Hanchanal,Abhishek
Dinesh,Chakku,Govardhan,
AFR DAILY JOBS ACTIVITY RECORD
DATE
01.09.2022

03.09.2022

04.09.2022

05.09.2022

06.09.2022
AFR DAILY JOBS ACTIVITY RECORD
JOB DESCRIPTION

Shredder screen repairing work


Material shifting from store
Grab crane inspection
Liquid AFR firing pump TAD got jam due to high viscous material, jam removed and repaired with old material
Extractor weigh feeder scrapper got displaced and struck, scrapper removed and re started
Shredder screen repairing work
Shredder screen door hydraulic cylinder arrangement turning at workshop
Shredder shut down material issued from store and shifted to site
Screen door screen assembly work
Screen door screen assembly work
Material shifting from store
Grab crane and belt conv area inspection
MANPOWER REMARK

Chakku hanchnala
Chakku hanchanal arun govardhan mintu
Hanchanal abhishek
Govardhan,Chakku,Mahesh,Abhishek
Govardhan,Chakku,Mahesh,Abhishek
Govardhan,Chakku,Mahesh,Abhishek
Hanchanal- B shift
Dinesh,Chakku,Arun,Govardhan
Dinesh,Chakku,Arun,Govardhan
Dinesh,Chakku,mahesh,Roshan
Arun,Abhishek,Mintu
Hanchanal
AFR DAILY JOBS ACTIVITY RECORD
DATE

26.10.2022

27.10.2022
AFR DAILY JOBS ACTIVITY RECORD
JOB DESCRIPTION
Apron bucket bend removing work
Bottom slide gate towards coal mill side cylinder replaced with new
Plant general inspection work
Apron bucket bend removing work and repairing work
Belt skirt cutting
Oxygen shifting from store and liquid AFR inspection
MANPOWER REMARK
Dinesh, Chakku
Roshan,Govardhan,Palton,Abhishek
Hanchanal
Dinesh,Palton,Govardhan
Hanchanal,Roshan
Arun,Abhishek
AFR DAILY JOBS ACTIVITY RECORD
DATE

01.11.2022

02.11.2022

03.11.2022
AFR DAILY JOBS ACTIVITY RECORD
JOB DESCRIPTION
NEW APRON DOOR OPENING AND CLEANING AND INSPECTION
LADDER FIXING WORK AT SHREDDER SCREEN DOOR
LIQUID FIRING CM PUMP LINE 3" BUTTER FLY VALVE REPLACEMENT DONE
NEW APRON AIR BLASTER FIXING WORK
BELT SHIFTING AND PLY REMOVING WORK
GRAB CRANE INSPECTION WORK, BAGFILTER MOTOR COUPLING BORE DIMENSIONS
HOT AIR LINE WORK
HOT AIR LINE WORK
BELT PLY REMOVING WORK
HOT AIR LINE BAG FILTER BASE FRAME FABRICATION
SHREDDER RBC-1 SKIRT REPLACEMENT AND SHOVEL MAKING FOR MATERIAL DRYING
HOT AIR LINE BAG FILTER BEARING REPLACEMENT
MANPOWER REMARK

DINESH,CHAKKU,ROSHAN,ABHISHEK

DINESH,CHAKKU,GOVARDHAN,PALTON,PANDIT
ARUN,ABHISHEK,ROSHAN
HANCHANAL
VIKAS TEAM & RAMVILAS TEAM
VIKAS TEAM & RAMVILAS TEAM
ROSHAN,PANDIT
DINESH,CHAKKU,ARUN
GOVARDHAN,PALTON
HANCHANAL,ABHISHEK
26.10.2022 27.10.2022 01.11.2022 02.11.2022 03.11.2022
1 Dinesh 3 3 3 3 0
2 Chakku 3 3 0 3 0
3 Govardhan 0 3 0 3 0
4 Palton 0 3 0 3 0
5 Roshan 0 3 3 0 3
6 Palton 0 3 0 0 0
7 Hanchanal 0 3 0 0 0
8 Abhishek 0 3 0 0 3
9 Pandit 0 3 0 0 0
10 Sanjay 4 4 4 4 4