Quantity as per Quantity as per IE Quantity as per IE Quantity as per IE

If defect found,Chainage
Sl. No. Nature of defect/deficiency Unit IE Inspections as Inspections dated Inspections dated Inspections dated Remarks
& side
per 15.09.2020. 28.09.2020. 15.10.2020 31.10.2020

ROADS

Carriageway and paved shoulders

SERVICE ROAD-13+080 RHS,


Pot holes MCW- 24+020 LHS,21+670 RHS MCW,26+410 RHS (MCW)10+250 RHS (Elevated Highway),10+255 RHS (Elevated Highway). Sqm 28.75 5.75 2.95 4 -
(The view of the defect/ deficiencies photograph are enclosed for the ready reference)

SERVICE ROAD- 16+900 to 16+940 LHS ,15+800 to 15+830 LHS ,28+200 to 28+500 RHS,23+620 LHS,17+230 RHS,19+025
LHS,15+800 to 16+200 RHS,10+260 LHS ,22+620 to 22+640 LHS,27+200 to 27+225 LHS , 26+290 RHS,28+200 to 29+250 RHS,
19+310LHS,19+200 to 19+300 RHS , 29+250 to 29+450 RHS, 10+780 to 11+300 LHS,10+300 to 10+440 LHS,29+250to 29+300
RHS,27+860 RHS,24+600LHS,28+000(below flyover),19+250 RHS ,11+830 to 11+870 LHS, 17+370 LHS,29+000 to 29+150 Poor Maintenance by the Concessionaire-
Removal of debris LHS,29+150 to 29+200 LHS,25+350 to 25+800 RHS ,25+750 LHS ,25+350 RHS ,10+650 to 11+500 LHS ,26+780 to 26+920 Cum 220.4 241.4 230 221.8 Compliance Vide letter no.NBTPL/O&M/K&J/130
LHS ,15+300 LHS ,13+300 to 14+320 LHS,14+530 to 14+545 LHS ,14+320 to 14+350 LHS (Right side) ,16+600 to 16+800 RHS & dated.16.10.2020 (IE recived date 17.10.2020)
Entire carriage portions (both MCW & SR) all along the Project Highway,
MCW:24+000 to 24+150 LHS, 27+000 to 29+500 LHS,26+300 to 29+500 RHS,11+960 to 12+210 LHS,
(The view of the defect/ deficiencies photograph are enclosed for the ready reference)

Hard/earth shoulders,side slopes,drains and culverts

2 Poor Maintenance by the Concessionaire-


Desilting of drains in Culvert Parapet wall damage -10+300 RHS (Service road)
Cum 0.425 0.425 0.425 0.4625 Compliance Vide letter no.NBTPL/O&M/K&J/130
Urban/semi-urban areas
dated.16.10.2020 (IE recived date 17.10.2020)

Road side furnishes including road signs and pavement marking

i)Damage to shape or position;poor visibility or loss of retro reflectivity

Speed Breaker thermo plastic painting :


LHS-
11+450,11+480,11+550,11+600,12+110,12+150,13+600,13+630,14+050,14+700,15+340,15+580,15+600,15+650,15+750,15+850
,15+880,16+400,16+800,17+050,17+190,17+230,17+450,17+850,17+990,18+150,18+180,18+550,18+630,20+150,20+250,24+48
0,20+510,21+240,21+350,21+450,21+930,21+980,22+240,22280,22+450,22+500,22+750,22+850,23+550,23+650,23+750,23+90
0,23+950,24+050,26+450,26+500,26+700,26+800,26+850,27+400,27+650,27+680,27+800,28+050,28+100,28+500,29+500
RHS-
10+000,14+060,14+080,14+250,15+000,15+630,15+660,15+830,16+000,16+030,16+170,16+200,16+450,17+600,17+650,17+880
,17+910,18+130,18+150,18+900,19+600,19+900,20+130,20+150,20+230,20+260,21+800,21+900,21+950,22+240,22+280,23+63 Poor Maintenance by the Concessionaire-
a)Thermoplastic painting 0,23+650,23+900,24+000,24+050,24+550,25+500,25+650,25+900,26+000,26+520,26+550,26+630,26+650,26+750,26+850,26+9 Sqm 11347 11347 Compliance for Thermoplastic Painting Vide letter
11347 4321.5 no.NBTPL/O&M/K&J/131 dated.17.10.2020 (IE
80,27+000,27+120,27+150,27+200,27+250,27+650,27+700,28+000,28+050,28+400,28+450,29+500
Road/pavement Marking - recived date 20.10.2020)
Service road:10+890 to 11+000 RHS,10+250 to 10+650 RHS,12+000 to 12+400 RHS,,14+800 to 15+000 LHS (Service
road),13+360 to 13+820 RHS (Service road),12+664 to 12+400 RHS (Service road),13+330 to 12+8400 RHS (Service
road),13+150 to 13+330LHS (Service Road),10+510 to 10+610 LHS(Service road),13+500 to 13+580 RHS (service
road)14+450 to 14+950 RHS (service road),13+200 to 12+875 LHS (service road),12+664 to 12+790 RHS(service road),
MCW:10+000 to 10+510 RHS,10+130 to 10+340 LHS,14+500 to 15+300 LHS,25+700 to 26+350 RHS ,12+110 to 12+870 LHS
(MCW), ,13+150 to 13+320 LHS (MCW),13+330 to 13+820 RHS (MCW),10+610 to 10+510 RHS (MCW),10+340 to 10+510
LHS(MCW below elevated highway),12+000 to 12+110 LHS (MCW),10+680 to 10+750 LHS (MCW)

b)Road Studs
Damaged/Missing From Road studs missing Km.10+000 to Km.29+500 MCW(BHS) and Elevated highway Km 10+150 to Km14+500(BHS) Each 4115 4115 4115 4115 No progress
Km.10+000 to Km.29+500

c) Enamel painting Corrosion of hand rail -Elevated Highway portion from Km 10+000 to 14+500 both side,Above VUP and flyover hand Sqm 6933.23 6933.23 6885.38 6885.38 -
rail(15+855,18+010,20+350,22+070,23+815,26+675,27+833 BHS)

3
Quantity as per Quantity as per IE Quantity as per IE Quantity as per IE
If defect found,Chainage
Sl. No. Nature of defect/deficiency Unit IE Inspections as Inspections dated Inspections dated Inspections dated Remarks
& side
per 15.09.2020. 28.09.2020. 15.10.2020 31.10.2020

Chevron painting on concrete barrier faded off:


Elevated Highway-10+150 to 14+500 both side
MCW-VUP ,Minor bridge, flyover portion MCW BHS-16+940 to 17+430,17+750 to 18+300,20+025 to 20+725,21+775 to
22+450, 23+450 to 24+125,26+400 to 27+000, 27+525 to 28+240,27+525 to 28+240,19+320 to 19+374,15+500 to 16+200,
Service Road-11+960 to 12+110 LHS,29+200 to 29+500 RHS,12+320 to 13+300 RHS,19+600 to 19+850LHS,24+400 to 25+300
d)Painting on Concrete RHS,24+400 to 25+300 LHS ,21+100 to 21+700 LHS,16+600 to 17+220 RHS,21+000 to 21+750 LHS ,18+000 to 18+050 LHS
(MCW) ,16+940 to 17+350 LHS ,18+500 to 19+350 LHS, 27+150 to 27+400 LHS ,18+400 to 18+900 RHS , 24+500 to 24+600 Sqm 14985 14985 24883 24883 Work under progress
surfaces RHS,
Kerb painting-13+400 to 14+400 RHS ,26+000 to 26+400 LHS,17+650 to 18+500LHS,18+350 to 19+000 RHS,10+580 to
10+990 LHS,11+960 to 12+140 LHS, 28+300 to 28+750 LHS,27+100 to 27+650 LHS, 14+500 to 15+150 RHS ,17+000 to
17+400 LHS,29+250 to 29+500 RHS , 13+360 to 14+200 LHS,12+660 to 13+150 LHS, 13+090 to 12+660 RHS,12+420 to
12+000 RHS.

Road signs Damages/Faded off :


Service road :21+440 RHS,27+780 RHS 18+070 RHS ,16+000 LHS ,20+260 RHS ,18+700 RHS ,13+360 LHS ,15+600
LHS,12+320 LHS ,20+550 LHS ,21+390 LHS,29+410 LHS ,28+350 RHS , 29+420 RHS ,23+250 RHS,29+440
LHS,22+740 LHS , 26+510 LHS ,24+650 LHS , 26+950 RHS ,22+800 LHS ,26+830 LHS,16+600 RHS,10+680 LHS,
27+170 LHS ,27+00 LHS, 27+810 LHS
MCW :21+750 RHS MCW,13+320 LHS (Elevated highway)14+085 RHS (Median),14+755 RHS,28+720 RHS
(Right) ,17+500 RHS (Right) , 15+350 LHS(Exit),27+210 RHS(beside Concrete barrier),27+240 LHS (Left),15+470 LHS
(Left)
Hazard marker-16+940 LHS(MCW),10+140LHS(MCW),16+210 RHS (MCW),28+130 RHS (SR),28+170 LHS
(SR),27+960 RHS (SR),26+675 LHS (SR),26+910 RHS (SR),26+920 LHS (SR),25+340 LHS (SR),25+370 RHS
(SR),23+550 RHS (SR),22+650 LHS (SR),15+890 RHS(MCW),17+230 LHS (Service road),22+040 RHS,21+410 LHS
(Service road),21+380 RHS(Service road),20+560 RHS (service road),12+540 LHS (Elevated highway),25+800
e) Road sign damages Each 70 70 66 69 -
RHS(Service Road),12+010 LHS (Btwn MCW and SR), 11+500 LHS (MCW),11+485 LHS(Btwn MCW and
SR),15+510 LHS ,20+025 RHS (btwn MCW and SR), 27+260 LHS(SR),17+600 RHS MCW (Exit),15+810 LHS
(SR) ,10+650 LHS(btwn MCW and SR),17+960 LHS (MCW),28+330 LHS (Service road),15+280 LHS (Exit Location),
24+200 RHS(Exit from MCW) ,17+960 RHS (Service road),23+850 LHS (Service road),17+550 LHS (MCW),25+750
LHS(service road),25+810 LHS(service road),15+820 LHS(Service road),17+950 LHS (Service road),,23+600 LHS
(Service road),24+910 LHS (Service road),26+050 LHS(service road),27+130 LHS , 13+350 RHS , 13+150 RHS ,
24+650 LHS(service road) , 10+530 LHS , 25+840 LHS (service road) , 10+330 RHS (service road) , 26+620 LHS ,
17+600 RHS , 13+200 LHS , 13+220 LHS
Kerb painting-13+400 to 14+400 RHS ,26+000 to 26+400 LHS,17+650 to 18+500LHS,18+350 to 19+000 RHS,10+580 to
10+990 LHS,11+960 to 12+140 LHS, 28+300 to 28+750 LHS,27+100 to 27+650 LHS, 14+500 to 15+150 RHS ,17+000 to
17+400 LHS,29+250 to 29+500 RHS , 13+360 to 14+200 LHS,12+660 to 13+150 LHS, 13+090 to 12+660 RHS,12+420 to
12+000 RHS.

RHS: Km 10+000 to 11+000-12No's, 11+000 to 12+000-28No's, 12+000 to 13+000-36 No's, 13+000 to 14+000-36
f) Pedestal (Pedestrian guard No's, 14+000 to 14+500-10 No's
Cum 0.315 0.315 0 3.39 -
rail):1 LHS:Km 10+000 to 11+000-6No's, 11+000 to 12+000-33No's, 12+000 to 13+000-20 No's, 13+000 to 14+000-32 No's,
14+000 to 14+500-13 No's

g) MBCB(Metal beam crash 23+295 RHS (SR),27+120 RHS (SR),16+550 LHS (SR),19+390 LHS (SR),19+440 LHS (SR),17+350 LHS (SR),19+510
Rmtr 34 48 40 40 -
Barrier) LHS (Service Road),19+300 RHS (Service road),19+440LHS(Service road)

12+856 LHS,11+067 LHS,11+068 RHS,10+755 RHS,12+590 RHS,12+340 RHS,11+480 RHS,11+440 RHS,10+610


RHS,12+790 RHS,12+220LHS,13+241 LHS,12+132 LHS,12+035 LHS,11+858 LHS,10+278LHS,10+535 LHS,11+562
h) Median metal railing LHS,10+305 LHS,10+282LHS,12+355 to 12+347 LHS,11+355 LHS and RHS ,12+860 LHS,13+770 RHS,10+290 Rmtr 249 249 249 249 No progress
RHS,12+140 RHS ,11+745 RHS,13+180 LHS ,10+365 RHS,10+550 RHS ,12+040 LHS,12+870 LHS,11+675 LHS,13+620
RHS,14+030 RHS ,11+460 LHS,10+360 LHS(below elevated highway),13+620 LHS

i) Concrete crash barrier


Cum 1.584 1.584 1.584 1.584 No progress
Damage/ missing 23+350 LHS (MCW)

Poor Maintenance by the Concessionaire-


j) Pedestrain guard railing 13+328 RHS,13+230 LHS Rmtr 21 21 21 14 Compliance Vide letter no.NBTPL/O&M/K&J/130
dated.16.10.2020 (IE recived date 17.10.2020)

k) Tilting of concrete barrier 13+450 LHS Rmtr 5 5 5 5 No progress


Quantity as per Quantity as per IE Quantity as per IE Quantity as per IE
If defect found,Chainage
Sl. No. Nature of defect/deficiency Unit IE Inspections as Inspections dated Inspections dated Inspections dated Remarks
& side
per 15.09.2020. 28.09.2020. 15.10.2020 31.10.2020

4 Trees and plantation

Obstruction in a minimum
Obstruction in visibility of road sign boards-15+000 LHS (Service road),19+780 LHS (Service road), Poor Maintenance by the Concessionaire-
head room of 5m above
i 23+750LHS(service road) Each 3 3 3 0 Compliance Vide letter no.NBTPL/O&M/K&J/130
carriageway or obstruction
dated.16.10.2020 (IE recived date 17.10.2020)
in visibility of road signs

Replacement of new plants as per IRC-SP-21-2009 at median at the Elevated Highway is yet to be completed and the
Replacement of trees and missing central median plants to be taken up simultaneously on the Project Highway. Balance Avenue & Median
iii Km 24 24 24 24 No progress
bushes Plants on the Project Stretch is still pending.Fixing of appropiate tree guards as per IRC SP-21 2009 are yet to taken
up and completed.

Over grown Median Plantation; 17+500 to 29+500


Over grown median grass:15+000 to 16+900,17+500 to 17+750,20+100 to 21+000
Removal of vegetation Vegetation:24+550 to 25+000 LHS (service road),25+800 to 26+350 LHS (service road),28+900 to 29+500 LHS (Service
iv affecting sight line and road Road),17+550 to 17+650LHS(Service Road),28+500 to 29+150 LHS (MCW),28+830 LHS (Service road),11+610 LHS Hectare 1.97 6.179 6.179 6.179 Work under progress
structures (service road), 15+400 (median)

Other Project Facilities and Approach roads

Damage or deterioration In Bus shelter Damaged -13+100 LHS (Service road) Nos - - - 1 No progress
Approach Roads, [Pedestrian
5 facilities, truck lay-bys, Bus
bays, bus shelters cattle
crossings Traffic Aid posts
Medical aid posts and other Poor Maintenance by the Concessionaire-
works Kg 34.935 34.935 34.935 0 Compliance Vide letter no.NBTPL/O&M/K&J/130
Bus shelter SS railing missing -13+250 RHS
dated.16.10.2020 (IE recived date 17.10.2020)

(a) Carriageway and Paved Shoulders


iii Cracking

Flexible pavement-25+160 to 25+170 LHS (MCW),26+345 to 26+375,26+400 to 420,26+450 to 26+470,26+750 to 26+755,26+850 to


26+870,26+900 to 26+910,26+940 to 26+935, 26+950 to 26+960,14+890 to 14+970 RHS (MCW),16+940 to 17+430 RHS
(MCW) ,22+200 to 22+220 RHS(MCW),20+000 RHS (MCW),15+530 to 15+550 RHS (MCW),20+160 to 20+280 RHS (MCW),15+484
to 15+500 RHS (MCW),20+070 to 20+160 RHS (MCW),23+650 to 23+670RHS (MCW)(1st and 2nd lane),26+300 to 26+350 RHS
MCW,26+780 RHS MCW,26+510 RHS,26+550 RHS,27+000 RHS,10+865 LHS(MCW) ,13+320 LHS(MCW),23+540
RHS(MCW),25+170RHS 2nd lane(MCW),25+600 to 25+610 RHS(MCW),26+600 RHS (MCW) ,26+810 RHS (MCW) ,25+170 Sqm 484.75 995.75 5250.75 5915.75 No progress
LHS(MCW),25+220 RHS(MCW),25+170 to 25+200 RHS 1st lane(MCW),11+350RHS (Service Road)26+330 RHS(MCW),11+930
RHS(Service road).
Rigid Pavement-14+825 LHS(TP1),17+375LHS(TP3), 23+500 RHS(TP-5),26+050 RHS(TP-6),(The view of the defect/ deficiencies
photograph are enclosed for the ready reference)

Rigid Pavement-14+825 LHS(TP1),17+375LHS(TP3), 23+500 RHS(TP-5),26+050 RHS(TP-6) Kg 3882.56 3882.56 3929 3929 No progress

Rigid Pavement-14+825 LHS(TP1), Dismantling and providng new Rigid Pavement. Cum 4891.875 4891.875 4891.875 4891.875 No progress

iv Rutting 26+780 to 26+790 RHS (MCW) Cum 1.4 1.4 1.4 1.4 No progress
Ravelling /Stripping of
bitumen surface

vi 25+170 RHS(MCW),19+340 RHS Cum 0.248 0.248 0.098 0.098 No progress

Damage to Pavement edges


12+040 RHS(Service Road),13+370RHS(service road),10+550 LHS (Service road),10+750 LHS (Service road), 11+000
vii Cum 1 1 1 1 No progress
RHS (service road), 10+690 RHS

(b) Hard/earth Shoulders, side slopes, drains and culverts


Variation by more than 2%
in the prescribed slope of
camber/cross fail
Earthen shoulder damaged-19+200 to 19+800 RHS (SR), 24+650 to 25+000 LHS (Service Road),28+550 to 29+150
RHS Service road),16+410 to 16+430 LHS(Service road),29+030 to 29+060 RHS(Service road),21+950 to 22+070
LHS(Service Road),28+400 to 28+550 RHS(Service road),28+600 to 28+700 LHS(Service Road),29+150 to 29+350
i RHS(Service Road),23+800 LHS(Service road),12+000 to 12+030 RHS (Service road),17+910RHS(SR),15+650 to Sqm 6962.5 6962.5 6962.5 6962.5 No progress
15+870 LHS(SR),22+650 LHS(SR),17+940 RHS (SR),19+150 RHS (SR),20+400 RHS (SR),22+200 RHS (SR),22+840
RHS (SR),25+200 RHS (SR),10+500 RHS,10+780,11+820 to 11+900 RHS,13+820 LHS,10+440 to 10+470 RHS,13+460
LHS
Quantity as per Quantity as per IE Quantity as per IE Quantity as per IE
If defect found,Chainage
Sl. No. Nature of defect/deficiency Unit IE Inspections as Inspections dated Inspections dated Inspections dated Remarks
& side
per 15.09.2020. 28.09.2020. 15.10.2020 31.10.2020

Edge drop at Shoulders


27+560 to 27+590 LHS SR,19+700 to 19+710 RHS(Service Road),29+500 to 29+450 LHS (Service Road), 25+760
ii LHS(Service Road),13+290LHS(Service Road),13+400 to 13+510 RHS(Service road),13+930 RHS(Service road),10+510 Sqm 532.5 562.5 562.5 562.5 No progress
RHS (Service road),13+050 LHS (Service road),10+650 to 10+720 LHS(Service road), 14+800LHS(Service road),

Damage to or silting of culverts and side drains during and immediately preceding the rainy seasons

Silting of median drain(Below Elevated Highway)-10+230 to 14+300 (Median)


Silting of side drain on service road:22+800 to 23+000 LHS (Service Road),25+130 to 25+200 LHS (Service
Road),21+900 to 22+300 LHS (Service Road), 25+600 to 26+400 LHS (Service road),24+650 RHS(Service
a) Silting of side drains and
road),25+400LHS (Service road),15+000 to 15+500 LHS ,19+400 to 19+600 LHS Cum 3320.21 3320.219 3320.219 3320.219 Work under progress
Culverts
Choking of
Culvert:10+340,13+830,14+177,15+815,17+120,17+950,21+400,22+650,22+850,23+620,24+630,24+642,24+910,25+350,
v 25+800,26+630,26+680,26+900,26+980,27+260,28+825,29+500

b) Side drain damage/Side


drain slab Damage/ Missing
and Median drain damage Side drain damage/Side drain slab Damage/ Missing-20+550 to 20+565 RHS (SR),10+525 LHS(Between MCW and
SR),17+710 LHS (Service Road),26+860 LHS (Service Road),25+340LHS (Service Road),23+700 RHS (Service Cum 7.088 7.088 7.088 7.088 Work under progress
road),10+700 (median),12+730 (Median),13+000(Median),10+300RHS

BRIDGES

Sub structure & Super


(a)
Structure of Bridges

Providing and inserting nipples with approved fixing compound after drilling holes for grouting -Crack filling for
i Cracks on Pier substructure Number 120 120 120 120
pier sub structure of Elevated structure from Km 10+270 to 14+356

Sealing of crack / porous concrete with Epoxy Grout by injection through nipples for Pier sub structure of Elevated
ii Cracks on Pier substructure Cum 480 480 480 480
structure from Km 10+270 to 14+356

Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement
iii Spalling/scaling Sqm 10 10 10 10
complete as per Technical Specification for Minor Bridge at 19+350

other items relating to


(f)
bridges

Carrying out proper cleaning of carriageways, footpaths, verges, expansion joints (for free movement), drainage
Gathering of dirt in bearings spouts of bridge including removal and disposal of trash, plastic, vegetation etc. from site outside ROW complete as
and joints; or clogging of per direction of Engineer --- VUP Portion at Km 15+855(BHS) (MCW), Km 18+010(BHS)(MCW), Km 20+350 (BHS)
i Rmt 9828 9828 9828 9828 Work under progress
spouts, weep holes and vent- (MCW), Km 22+070(BHS)(MCW), Km 23+815 (BHS) (MCW) (,Km.26+675 (BHS),Flyover Portion at chainage
holes Km.27+833 (BHS), Minor Bridge at Km 19+350(BHS) (MCW&SR) and
Elevated Highway portion from Km 10+270 to 14+356
Quantity as per Quantity as per IE Quantity as per IE Quantity as per IE
If defect found,Chainage
Sl. No. Nature of defect/deficiency Unit IE Inspections as Inspections dated Inspections dated Inspections dated Remarks
& side
per 15.09.2020. 28.09.2020. 15.10.2020 31.10.2020

Down-take pipe for drainage spouts --- VUP Portion at Km 15+855(BHS) (MCW), Km 18+010(BHS)(MCW), Km
Down-take pipe for Drainage 20+350 (BHS)(MCW), Km 22+070(BHS)(MCW), Km 23+815 (BHS) (MCW) (,Km.26+675 (BHS),Flyover Portion at
ii
spouts chainage Km.27+833 (BHS) and
Elevated Highway portion from Km 10+270 to 14+356

Rain-cuts or erosion of banks


iii of the side slopes of Culvert(erosion of embankment)-17+950 LHS(service road) Cum 0.5 0.5 0.5 0.5
approaches

Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of
iv Damages in qudrant pitching Cum 10 10 10 10
toe of embankment complete as per drawing and Technical specifications for Minor Bridge -at Km 19+350

Clearing slab/ box type culverts and pipe culverts including clearing, cleaning and reshapping of upstream and down
stream faces of these culverts with in ROW. The job includes disposal of excess material recovered from site
Growth of vegetation including vegetation outside ROW with all leads and lifts complete in all respect as per direction of Engineer in
v affetcing the structure or charge (Frequency of cleaning will be one time in a year i.e. before start of monsoon).Growth of vegetation on RE Number 23 23 23 23
obstructing the waterway Wall:15+700 RHS
Culverts at Km 10+340, 12+600,13+830, 15+815, 17+120, 17+400, 21+400, 22+650, 22+850, 23+620, 23+860, 24+630,
24+642, 24+910, 25+350, 25+800, 26+630, 26+680, 26+980, 26+900, 26+980, 27+260, 29+500

Details are furnished by IT Expert through email on 6th june 2019 to K&J bangalore office

TP-1(14+825)-1No's
1 RFID ETC Transreceiver Nos 2 2 2 2
TP-6(26+050)-1No's

2 VMS display 12+500LHS,23+300(LHS,28+050(RHS) No.s 3 3 3 3

TP-1(14+825)-8No's
3 Weigh in motion No.s 15 15 15 15
TP-6(26+050)-7No's

Emergency Road side 10+856(BS),12+600(Elevated


4 No.s 20 20 20 20
Telephone(ECB) BHS),12+962(BHS),16+875(BHS),18+900(BHS),22+800(BHS),24+800(BHS),27+150(BHS),29+000(BHS)