Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

CHECK LIST FOR: HYDRANT SYSTEM NAME OF PROJECT: DATED:

Landing
Valve's
Hydrant Pillars Landing Valve's Water Hand Wheel Rubber Blank Cap Hydrant Cabinet
Flow & Pressure Test Open & Shut Gasket With Chain
Left Right Pressure Left Right Left Right Left Right Canvas Cam
No: Location Nozzle Mirror Key
Valve Valve (Psi) Wheel Wheel Valve Valve Cap Cap Hose Lock
OK OK OK OK OK OK OK OK OK OK OK OK OK
A OPP. LOADING STORE 180 PSI

CAR PARK OK OK OK OK OK OK OK OK OK OK OK OK OK
B 180 PSI

ENTRANCE OK OK OK OK OK OK OK OK OK OK OK OK OK
C 180 PSI

STORE OK OK OK OK OK OK OK OK OK OK OK OK
D 180 PSI OK

W/W/T/P OK OK OK OK OK OK OK OK OK OK OK
E 180 PSI OK OK

BEHIND STORE OK OK OK OK OK OK OK OK OK OK OK OK OK
F 180 PSI

OK OK OK OK OK OK OK OK OK OK OK OK
G
BESIDE CHLORINATION
180 PSI x
OK OK OK OK OK OK OK OK OK OK OK OK OK
H BESIDE SCRUBBER 180 PSI
OK OK 180 PSI OK OK OK OK OK OK OK OK OK OK OK
I CENTRE OF PLT.

Your Safety Is Our Priority


REMARKS

ACKNOWLEGED BY:

………………………………………………. ………………………………………………………
Client’s Signature & Stamp
NAME: NAME:
DATE: DATE:

Your Safety Is Our Priority

You might also like