Failure Analysis Report: Challan
Failure Analysis Report: Challan
Failure Analysis Report: Challan
ULR - TC532923000016628F
To, Date : 12-11-2023
Test Report No.
M/s. KONKAN RAILWAY CORPORATION LIMITED (Belapur) : E2308702
Sample Received Date : 23-08-2023
Test Completion Date
Belapur Bhavan, Sector-11, C.B.D. Belapur, Navi Mumbai: 400614 : 11-11-2023
Sample of rail fracture detected at Km 266/900-267/700 in between VID-RAJP yard which was in the service *E220
was received for failure analysis. It was in service for twenty-six years & was removed after detection on
02/08/2023. The fracture location was mid rail. USFD detected piping defect in the head.
TESTS CONDUCTED:
1. Visual
2. Macro
3. Chemical
4. Tensile
5. Hardness
6. Impact
7. Microstructure
8. Inclusion
1-8*
Page 2 of 8
ULR - TC532923000016628F
To, Date : 12-11-2023
Test Report No.
M/s. KONKAN RAILWAY CORPORATION LIMITED (Belapur) : E2308702
Sample Received Date : 23-08-2023
Test Completion Date
Belapur Bhavan, Sector-11, C.B.D. Belapur, Navi Mumbai: 400614 : 11-11-2023
As Received Condition
Photographs:
A small piece of the rail was analyzed with optical emission spectrometer.
The Chemical composition complies with the specification IRST-12:2009 Grade 880.
*E220
Element C Si Mn P S Al Ni Cr Mo Cu Fe
3-8*
Result 0.78 0.27 1.15 0.028 0.028 0.001 0.007 0.005 0.001 0.006
97.69
Page 4 of 8
ULR - TC532923000016628F
To, Date : 12-11-2023
Test Report No.
M/s. KONKAN RAILWAY CORPORATION LIMITED (Belapur) : E2308702
Sample Received Date : 23-08-2023
Test Completion Date
Belapur Bhavan, Sector-11, C.B.D. Belapur, Navi Mumbai: 400614 : 11-11-2023
TENSILE TEST
HARDNESS TEST
It was conducted as per IS 1500 (part 1):2013 & it conforms to the specification IRST-12:2009 Grade 880
Scale Hardness (Top) Hardness (Core)
Result 298,298,298 272,278,278
HBW (2.5mm/187.5kg) Specified 260 Min. 260 Min.
Page 5 of 8
ULR - TC532923000016628F
To, Date : 12-11-2023
Test Report No.
M/s. KONKAN RAILWAY CORPORATION LIMITED (Belapur) : E2308702
Sample Received Date : 23-08-2023
Test Completion Date
Belapur Bhavan, Sector-11, C.B.D. Belapur, Navi Mumbai: 400614 : 11-11-2023
5-8*
Page 6 of 8
ULR - TC532923000016628F
To, Date : 12-11-2023
Test Report No.
M/s. KONKAN RAILWAY CORPORATION LIMITED (Belapur) : E2308702
Sample Received Date : 23-08-2023
Test Completion Date
Belapur Bhavan, Sector-11, C.B.D. Belapur, Navi Mumbai: 400614 : 11-11-2023
6-8*
Page 7 of 8
ULR - TC532923000016628F
To, Date : 12-11-2023
Test Report No.
M/s. KONKAN RAILWAY CORPORATION LIMITED (Belapur) : E2308702
Sample Received Date : 23-08-2023
Test Completion Date
Belapur Bhavan, Sector-11, C.B.D. Belapur, Navi Mumbai: 400614 : 11-11-2023
No crack was detected by USFD in June.2023 but horizontal crack of approximately 1250 mm length
observed at the head & web joint of rail on 02/08/2023. This was due to vertical split crack in the *E220
head of the rail. Vertical split head defects are common fatigue defects & are considered dangerous
given that they can develop rapidly & their presence is difficult to detect, even with ultrasonic testing.
Vertical split head is a critical rail defect affecting safety of train operation. It is a longitudinal defect.
The origin is an internal longitudinal seam, segregation or inclusion from the manufacturing process.
The separation progresses longitudinally & horizontally, parallel to the side of head, then gradually
turns to gauge or field side of the head. Growth is usually rapid after the seam or separation opens
up. It continues to grow rapidly until the split turns outward. It is usually not visible on the surface
until it has grown up to a length of several feet
Long sulfide inclusions observed & this may be the cause of vertical split head.
Recommendation: Looking at the entrapment at the crack area & long sulfide inclusions, it is advisable to
use rail made from relatively clean steel. Improved rail steel having enhanced fracture toughness and
8-8*
ductility should be used.
S.N Parikh
(Metallurgist)
--------------End of Report------------------