NATIONAL POWER CORPORATION

Small Power Utilities Group


Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
19 TINGLOY DPP, Gamao, 24.00 632.00 6 3883.00 1985.00 Normal
Tingloy, Batangas Operation

1 PERKINS 163.00 .00 22487.21 Deactivated -- Beyond economic Included in the SPUG -- -- NO -- Deactivated
repair Recommendations
on Decommissioning
Program for CY
2021- 2025 dated 30
July 2020

2 PERKINS 260.00 110.00 29989.28 Operational Operational

3 PERKINS 260.00 .00 41580.40 Deactivated 01/27/2018 Beyond economic Included in the SPUG -- -- NO -- Deactivated
repair Recommendations
on Decommissioning
Program for CY
2021- 2025 dated 30
July 2020

4 MAN 500.00 275.00 38012.97 Operational Operational

5 CUMMINS 600.00 .00 4023.00 Deactivated -- Transferred to -- -- -- NO -- Transferred to Lubang DPP


LUBANG DPP last
March 21, 2019

6 CUMMINS 600.00 450.00 9887.00 Operational Operational

7 CUMMINS 600.00 350.00 17174.00 Operational Operational

8 CUMMINS 600.00 500.00 8738.00 Operational Operational

9 CUMMINS 300.00 300.00 533.00 Operational On stand-by

21 MAMBURAO DPP, 0.00 0.00 0 Non-Operatio -- End Contract of -- -- -- NO --


Tayamaan, Mamburao, nal Aggreko Rental
Occidental Mindoro Gensets

22 LUBANG DPP, Maliig, 24.00 1158.00 6 5504.00 2850.00 Normal Line Fault & Line Maintenance
Lubang, Occidental Operation Aug 16,2023 0450H-0535H Feeder 1
Mindoro AT line fault at line BC load involve
450kw

With Line Maintenance:


request emergency shutdown for
replacement of broken cut-out assembly
Sapa cut-out (F1)
0902H-0935H

1 MAN 500.00 300.00 47293.29 Operational OPERATIONAL

2 MAN 500.00 300.00 53914.71 Operational OPERATIONAL


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
3 CUMMINS 704.00 .00 45494.90 Deactivated 11/15/2022 Damaged radiator With Approved 18:00 -- NO 06/30/2024 DEACTIVATED
radiator fan blade Deactivation dated
20 July 2023 under
Memo No.
SPU-23-3218.PR No.
S1-LDP23-016 • As
per a telephone
conversation with Mr.
Carlo Osano last 11
August 2023 the PR
was scheduled for
pre- procurement.

4 PERKINS 600.00 .00 3040.00 Deactivated -- With litigation -- -- -- NO -- DEACTIVATED

5 CUMMINS 800.00 450.00 21147.62 Operational OPERATIONAL

6 CUMMINS 600.00 .00 21638.00 Deactivated 01/20/2023 Presence of water With Approved -- -- NO 06/30/2024 DEACTIVATED
at breather pipe Deactivation dated
20 July 2023 under
Memo No.
SPU-23-3218.PR No.
S1-LDP23-017
status: • PR No.
S1-LDP23-017 (LOD
Process), as per
telephone
conversation with
Ma’am Cecilia D.
Pelejo last 11 August
2023 PR is for
approval of Notice of
Award (NOA).
7 CUMMINS 600.00 600.00 7536.00 Operational OPERATIONAL

8 CUMMINS 600.00 600.00 11141.00 Operational OPERATIONAL

9 CUMMINS 600.00 600.00 10018.00 Operational OPERATIONAL

23 CABRA DPP, Cabra 24.00 40.00 4 250.00 230.00 Normal


Island, Lubang, Operation
Occidental Mindoro

1 CUMMINS 55.00 55.00 18452.09 Operational OPERATIONAL

2 CUMMINS 55.00 55.00 14145.24 Operational OPERATIONAL

3 PERKINS 60.00 40.00 7477.02 Operational OPERATIONAL

4 CUMMINS 80.00 80.00 10226.20 Operational OPERATIONAL


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
ORIENTAL MINDORO 24.00 63860.00 0 Normal
TLSS, Oriental Mindoro Operation Incident Report: Oriental Mdo. TL & SS
DATE: Aug. 15, 2023
TIME of Tripping: 2147H
OUTAGE Description: Partial Power
Interruption (PPI), PHESI SWS - Minolo
Feeder (Bay 1.1) Tripped due to
Transient Fault
AFFECTED Area: Puerto Galera
TIME Restored: 2202H

Max Unserved: 4.70MW (August 16,


2023 @1100H)
Reason:
*Due to shortfall of EPP contracted
capacity (Fuel Shortage)
*Derated Capacity of Hydro Power
Plants and Wind Power
*Maintenance of Ormin Power Inc. units
1&2
OCCIDENTAL 24.00 26896.00 0 Normal
MINDORO 69KV TLSS, Operation OMECO Distribution Line Fault:
Bgy. Magbay, San Jose, Eco Park Feeder 2, PSS Recloser 1 &
Occidental Mindoro 2, FIL Oil rec.

NPP Plant Trouble:


a. 1450H to 1509H: PRECO TRIPPED (
over current)

B ROMBLON GRID, 24.00 2755.00 0 12900.0010085.00 Normal


Centro, Capaclan, Operation
Romblon, Romblon

24.B ROMBLON DPP, 19.83 1810.00 8 4875.00 3600.00 Normal


Centro, Capaclan, Operation
Romblon, Romblon

1 TIDE-POWER 600.00 350.00 29902.56 Operational

2 FG-WILSON 600.00 350.00 47321.08 Operational

3 FG-WILSON 675.00 350.00 31989.40 Operational

4 FG WILSON 600.00 350.00 20635.00 Operational Stand by (Awaiting the release of


regulatory permit)

5 CUMMINS 600.00 550.00 19658.00 Operational

6 CUMMINS 600.00 550.00 8774.00 Operational

7 CUMMINS 600.00 550.00 8356.00 Operational

8 CUMMINS 600.00 550.00 8736.00 Operational


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
27.B PB 106, Romblon 17.80 2000.00 3 14400.00 6400.00 Normal
Operation

1 DAIHATSU 3600.00 2000.00 86870.58 Operational

2 DAIHATSU 3600.00 2200.00 94149.48 Operational

3 DAIHATSU 3600.00 2200.00 65549.30 Operational

4 DAIHATSU 3600.00 Deactivated 06/15/2015 Seizure at main Included in the SPUG -- -- NO --


bearing journal no. Recommendations
4 on Decommissioning
Program for CY
2021- 2025 dated 30
July 2020

28 BANTON DPP, 24.00 200.00 5 1376.00 1000.00 Normal


Catarman, Hambian, Operation
Banton, Romblon

1 PERKINS 163.00 100.00 43956.90 Operational Standby

2 PERKINS 163.00 100.00 38860.33 Operational Standby

3 FG WILSON 250.00 .00 7159.00 Deactivated 06/21/2019 Damaged intake & • PR No. -- -- NO 12/31/2023 Deactivated
exhaust valves, S1-BAP23-011,
piston, liner, piston along with approved
ring and connecting PO No. 021879
rod bearing (HLYC) and PO No.
021880
(Gentromech), took
effect on the 02 of
August 2023, with a
delivery period of
sixty (60) calendar
days. • Awaiting
delivery of spare
parts as specified in
the (PR).
4 CUMMINS 300.00 300.00 21675.10 Operational

5 CUMMINS 200.00 200.00 4402.38 Operational

6 CUMMINS 300.00 300.00 6816.45 Operational

C SIBUYAN GRID, 24.00 2163.00 0 5816.00 3755.00 Normal


Poblacion, San Operation
Fernando, Romblon

30 SAN JOSE DPP, 24.00 411.00 6 1864.00 1260.00 Normal


Romblon Operation

1 PERKINS 163.00 110.00 20435.51 Operational


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
2 PERKINS 163.00 60408.37 Non-Operatio 07/04/2023 Knocking sound 1. Wheelcase has 12:50 -- NO -- GENSET REMARKS: <br/>on
nal was observed already been maintenance overhauling
transported to San TDR is 10 days after the arrival of
Jose DPP on 06 crankshaft<br/><br/>TROUBLE
August 2023 2. The REMARKS: <br/>TDR is 10 days after
San Jose DPP the arrival of crankshaft
crankshaft arrived at
the MROD
Warehouse on 07
August 2023. Both
the San Jose DPP
crankshaft and the
Tingloy DPP
crankshaft will be
taken to the MRMD
office for assessment
on 14 August 2023
3 CAT 228.00 Deactivated 08/26/2016 No identical genset, Recommended for -- -- NO --
operation manual, Decommissioning
parts book and list dated February 26,
of spare parts are 2020
not available

4 FG-WILSON 410.00 250.00 19726.27 Operational

5 CUMMINS 300.00 300.00 14028.00 Operational

6 CUMMINS 300.00 300.00 8292.00 Operational

7 CUMMINS 300.00 300.00 14460.00 Operational

29.C SIBUYAN DPP, 24.00 828.00 6 4466.00 2440.00 Normal


Poblacion, San Operation
Fernando, Romblon

1 PERKINS 260.00 Deactivated -- High fuel rate and Included in the 2nd -- -- NO --
high net heat rate batch of
with small capacity Decommissioning
synchronized to dated February 26,
Cantingas Mini 2020
Hydro. Operation of
the said unit is
already
non-economical

2 PERKINS 260.00 Deactivated -- High fuel rate and Included in the 2nd -- -- NO --
high net heat rate batch of
with small capacity Decommissioning
synchronized to dated February 26,
Cantingas Mini 2020
Hydro. Operation of
the said unit is
already
non-economical
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
3 CKD 163.00 Deactivated -- The unit is obsolete Included in the 2nd -- -- NO --
and were batch of
manufacture/model Decommissioning
last 1992 and spare dated February 26,
parts were no 2020
longer in circulation

4 PERKINS 163.00 90.00 60262.10 Operational

5 CKD 220.00 Deactivated -- The unit is obsolete Included in the 2nd -- -- NO --


and were batch of
manufacture/model Decommissioning
last 1992 and spare dated February 26,
parts were no 2020
longer in circulation

6 CAT 600.00 Deactivated -- Owned by -- -- -- NO --


ROMELCO

7 MAN 500.00 350.00 32441.71 Operational

8 MAN 500.00 350.00 42575.26 Operational

9 CUMMINS 600.00 550.00 19640.00 Operational

10 CUMMINS 600.00 550.00 13567.00 Operational

11 CUMMINS 600.00 550.00 22365.00 Operational

31 CONCEPCION DPP, 24.00 180.00 6 1226.00 1190.00 Normal


Poblacion, Conception, Operation
Romblon

1 PERKINS 163.00 145.00 42894.70 Operational

2 PERKINS 163.00 145.00 41249.00 Operational

3 CUMMINS 300.00 300.00 10848.48 Operational

4 CUMMINS 200.00 200.00 6983.50 Operational

5 CUMMINS 200.00 200.00 7720.97 Operational

6 CUMMINS 200.00 200.00 7684.11 Operational

32 CORCUERA DPP, San 24.00 380.00 4 2026.00 600.00 Normal


Agustin, Corcuera, Operation
Romblon

1 PERKINS 163.00 .00 22000.00 Deactivated January 2015 Beyond economic Beyond economic -- -- NO -- GENSET REMARKS: <br/>For
repair repair decommissioning as recommend by
MRMD technical
personnel<br/><br/>TROUBLE
REMARKS: <br/>
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
2 PERKINS 163.00 .00 26769.48 Non-Operatio 06/30/2023 Scheduled for 1. Dismantled the -- -- NO 08/23/2023 GENSET REMARKS: <br/>Scheduled
nal major overhauling turbo charger, for Major
cylinder head cover, Overhauling<br/><br/>TROUBLE
sump tank, rocker REMARKS: <br/>Subject for Major
arms, and cylinder Overhauling
head assemblies

3 MAN 500.00 .00 40674.29 Deactivated 07/22/2022 Damaged 1. Waiting for the 14:55 -- NO 09/30/2023 GENSET REMARKS: <br/>Damaged
connecting rod No. schedule of MRMD connecting rod No.
4 to conduct 4<br/><br/>TROUBLE REMARKS:
positioning and <br/>
reassembly of engine
block

4 FG WILSON 300.00 .00 7300.13 Deactivated 12/06/18 Damaged MRMD submitted -- -- NO -- GENSET REMARKS: <br/>For
crankshaft Certification in the decommissioning<br/><br/>TROUBLE
assessment of the REMARKS: <br/>
unit last 03 August
2020. The unit was
recommended for
decommissioning.

5 CUMMINS 300.00 300.00 17647.47 Operational Normal Operation

6 CUMMINS 300.00 300.00 8775.89 Operational Normal Operation

7 CUMMINS 300.00 .00 12296.99 Non-Operatio 08/11/2023 Under PMS 1. Replaced 12 pcs. 13:00 -- NO 08/29/2023 GENSET REMARKS: <br/>Damaged
nal valves due to wear Valve<br/><br/>TROUBLE REMARKS:
and tear 2. Upon <br/>
inspection, injectors
are needed to be
calibrated 3. Cylinder
head assemblies are
needed to be brought
to WMTSD for
pressing to remove
and replace the valve
guide. Note: The
valve needed are
included in PR
S1-COR23-018
(APP) that is
scheduled for
delivery next week.
BANSUD-RENTAL, 0.00 0.00 0 Non-Operatio 11/09/2022 End Contract of PSI -- -- -- NO -- Plant Trouble:
Brgy. Conrazon, nal Rental Gensets
Bansud,, Oriental
Mindoro

33 PULANG LUPA 0.00 0.00 0 Non-Operatio 12/31/2022 End Contract of PSI -- -- -- NO -- Plant Trouble:
RENTAL, Sitio Pulang nal Rental Gensets