Dors 08.16.2023
Dors 08.16.2023
Dors 08.16.2023
1 PERKINS 163.00 .00 22487.21 Deactivated -- Beyond economic Included in the SPUG -- -- NO -- Deactivated
repair Recommendations
on Decommissioning
Program for CY
2021- 2025 dated 30
July 2020
3 PERKINS 260.00 .00 41580.40 Deactivated 01/27/2018 Beyond economic Included in the SPUG -- -- NO -- Deactivated
repair Recommendations
on Decommissioning
Program for CY
2021- 2025 dated 30
July 2020
22 LUBANG DPP, Maliig, 24.00 1158.00 6 5504.00 2850.00 Normal Line Fault & Line Maintenance
Lubang, Occidental Operation Aug 16,2023 0450H-0535H Feeder 1
Mindoro AT line fault at line BC load involve
450kw
6 CUMMINS 600.00 .00 21638.00 Deactivated 01/20/2023 Presence of water With Approved -- -- NO 06/30/2024 DEACTIVATED
at breather pipe Deactivation dated
20 July 2023 under
Memo No.
SPU-23-3218.PR No.
S1-LDP23-017
status: • PR No.
S1-LDP23-017 (LOD
Process), as per
telephone
conversation with
Ma’am Cecilia D.
Pelejo last 11 August
2023 PR is for
approval of Notice of
Award (NOA).
7 CUMMINS 600.00 600.00 7536.00 Operational OPERATIONAL
3 FG WILSON 250.00 .00 7159.00 Deactivated 06/21/2019 Damaged intake & • PR No. -- -- NO 12/31/2023 Deactivated
exhaust valves, S1-BAP23-011,
piston, liner, piston along with approved
ring and connecting PO No. 021879
rod bearing (HLYC) and PO No.
021880
(Gentromech), took
effect on the 02 of
August 2023, with a
delivery period of
sixty (60) calendar
days. • Awaiting
delivery of spare
parts as specified in
the (PR).
4 CUMMINS 300.00 300.00 21675.10 Operational
1 PERKINS 260.00 Deactivated -- High fuel rate and Included in the 2nd -- -- NO --
high net heat rate batch of
with small capacity Decommissioning
synchronized to dated February 26,
Cantingas Mini 2020
Hydro. Operation of
the said unit is
already
non-economical
2 PERKINS 260.00 Deactivated -- High fuel rate and Included in the 2nd -- -- NO --
high net heat rate batch of
with small capacity Decommissioning
synchronized to dated February 26,
Cantingas Mini 2020
Hydro. Operation of
the said unit is
already
non-economical
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)
1 PERKINS 163.00 .00 22000.00 Deactivated January 2015 Beyond economic Beyond economic -- -- NO -- GENSET REMARKS: <br/>For
repair repair decommissioning as recommend by
MRMD technical
personnel<br/><br/>TROUBLE
REMARKS: <br/>
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 15 Aug (12nn) - 16 Aug (12nn)
3 MAN 500.00 .00 40674.29 Deactivated 07/22/2022 Damaged 1. Waiting for the 14:55 -- NO 09/30/2023 GENSET REMARKS: <br/>Damaged
connecting rod No. schedule of MRMD connecting rod No.
4 to conduct 4<br/><br/>TROUBLE REMARKS:
positioning and <br/>
reassembly of engine
block
4 FG WILSON 300.00 .00 7300.13 Deactivated 12/06/18 Damaged MRMD submitted -- -- NO -- GENSET REMARKS: <br/>For
crankshaft Certification in the decommissioning<br/><br/>TROUBLE
assessment of the REMARKS: <br/>
unit last 03 August
2020. The unit was
recommended for
decommissioning.
7 CUMMINS 300.00 .00 12296.99 Non-Operatio 08/11/2023 Under PMS 1. Replaced 12 pcs. 13:00 -- NO 08/29/2023 GENSET REMARKS: <br/>Damaged
nal valves due to wear Valve<br/><br/>TROUBLE REMARKS:
and tear 2. Upon <br/>
inspection, injectors
are needed to be
calibrated 3. Cylinder
head assemblies are
needed to be brought
to WMTSD for
pressing to remove
and replace the valve
guide. Note: The
valve needed are
included in PR
S1-COR23-018
(APP) that is
scheduled for
delivery next week.
BANSUD-RENTAL, 0.00 0.00 0 Non-Operatio 11/09/2022 End Contract of PSI -- -- -- NO -- Plant Trouble:
Brgy. Conrazon, nal Rental Gensets
Bansud,, Oriental
Mindoro
33 PULANG LUPA 0.00 0.00 0 Non-Operatio 12/31/2022 End Contract of PSI -- -- -- NO -- Plant Trouble:
RENTAL, Sitio Pulang nal Rental Gensets
Lupa, San Jose,
Occidental Mindoro,
Occidental Mindoro