NATIONAL POWER CORPORATION

Small Power Utilities Group


Daily Plant Status Report - 02 Oct (12nn) - 03 Oct (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
19 TINGLOY DPP, Gamao, 23.08 545.00 6 3883.00 1605.00 Normal Line Fault
Tingloy, Batangas Operation a. 1229H to 1324H (TPI) - Feeder 2
restored at 1400H
b. 1751H to 1920H (Feeder 2)
c. 0714H to 0953H (Feeder 2)

1 PERKINS 163.00 .00 22487.21 Deactivated -- Beyond economic Included in the SPUG -- -- NO -- Deactivated
repair Recommendations
on Decommissioning
Program for CY
2021- 2025 dated 30
July 2020

2 PERKINS 260.00 110.00 30188.66 Operational Operational

3 PERKINS 260.00 .00 41580.40 Deactivated 01/27/2018 Beyond economic Included in the SPUG -- -- NO -- Deactivated
repair Recommendations
on Decommissioning
Program for CY
2021- 2025 dated 30
July 2020

4 MAN 500.00 275.00 38324.83 Operational Operational

5 CUMMINS 600.00 .00 4023.00 Deactivated -- Transferred to -- -- -- NO -- Transferred to Lubang DPP


LUBANG DPP last
March 21, 2019

6 CUMMINS 600.00 .00 10017.00 Non-Operatio 08/29/2023 Damaged cylinder waiting for the 10:01 -- NO 10/10/2023 Under maintenance
nal head, piston, completion of repair
camshaft and roller of camshaft and
cam follower fabricationof roller
(cylinder number 4, cam follower
right bank)

7 CUMMINS 600.00 420.00 17497.00 Operational Operational

8 CUMMINS 600.00 500.00 9520.00 Operational Operational

9 CUMMINS 300.00 300.00 533.00 Operational On stand-by

21 MAMBURAO DPP, 0.00 0.00 0 Non-Operatio -- End Contract of -- -- -- NO --


Tayamaan, Mamburao, nal Aggreko Rental
Occidental Mindoro Gensets

22 LUBANG DPP, Maliig, 23.67 1120.00 6 5504.00 2850.00 Normal Line Fault
Lubang, Occidental Operation Oct. 2, 2023-TPI due to line fault at line
Mindoro A/C from 2030H to 2050H.

1 MAN 500.00 300.00 47293.29 Operational OPERATIONAL

2 MAN 500.00 300.00 54076.24 Operational OPERATIONAL


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 02 Oct (12nn) - 03 Oct (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
3 CUMMINS 704.00 .00 45494.90 Deactivated 11/15/2022 Damaged radiator With Approved 18:00 -- NO 06/30/2024 DEACTIVATED
radiator fan blade Deactivation dated
20 July 2023 under
Memo No.
SPU-23-3218.PR No.
S1-LDP23-016 • As
per a telephone
conversation with Mr.
Carlo Osano last 11
August 2023 the PR
was scheduled for
pre- procurement.

4 PERKINS 600.00 .00 3040.00 Deactivated -- With litigation -- -- -- NO -- DEACTIVATED

5 CUMMINS 800.00 450.00 21725.77 Operational OPERATIONAL

6 CUMMINS 600.00 .00 21638.00 Deactivated 01/20/2023 Presence of water With Approved -- -- NO 06/30/2024 DEACTIVATED
at breather pipe Deactivation dated
20 July 2023 under
Memo No.
SPU-23-3218.PR No.
S1-LDP23-017
status: • PR No.
S1-LDP23-017 (LOD
Process), as per
telephone
conversation with
Ma’am Cecilia D.
Pelejo last 11 August
2023 PR is for
approval of Notice of
Award (NOA).
7 CUMMINS 600.00 600.00 8487.00 Operational OPERATIONAL

8 CUMMINS 600.00 600.00 12090.00 Operational OPERATIONAL

9 CUMMINS 600.00 600.00 10373.00 Operational OPERATIONAL

23 CABRA DPP, Cabra 24.00 41.00 4 250.00 230.00 Normal


Island, Lubang, Operation
Occidental Mindoro

1 CUMMINS 55.00 55.00 18945.18 Operational Operational

2 CUMMINS 55.00 55.00 14238.03 Operational Operational

3 PERKINS 60.00 40.00 7477.02 Operational Operational

4 CUMMINS 80.00 80.00 10846.50 Operational Operational

ORIENTAL MINDORO 24.00 66450.00 0 Normal


TLSS, Oriental Mindoro Operation
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 02 Oct (12nn) - 03 Oct (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
OCCIDENTAL 0 69kV TL status:
MINDORO 69KV TLSS, October 2, 2023
Bgy. Magbay, San Jose, a. 1639H to 1645H: A/T 29 sj4 triggered
Occidental Mindoro to tripped 26SJ4 and 52 SJ4
Distribution Line Fault:
October 02, 2023
-29 sj4,28 sj4,26 sj4
October 03, 2023
-Sta Cruz ,F1
Distribution Line Maintenance:
October 03, 2023
a.1129H to 1136H: 29 sj4 manually
open ( to change vcb breaker)
NPP Plant Trouble:
October 2, 2023
a. 1639H to 1700H : PRECO Tripped
(Over current)
B ROMBLON GRID, 24.00 2493.00 0 12900.0010100.00 Normal
Centro, Capaclan, Operation
Romblon, Romblon

24.B ROMBLON DPP, 20.47 1805.00 8 4875.00 3600.00 Normal


Centro, Capaclan, Operation
Romblon, Romblon

1 TIDE-POWER 600.00 350.00 29905.39 Operational

2 FG-WILSON 600.00 350.00 47347.82 Operational

3 FG-WILSON 675.00 350.00 31989.40 Operational

4 FG WILSON 600.00 350.00 20635.00 Operational Stand by (Awaiting the release of


regulatory permit)

5 CUMMINS 600.00 550.00 19957.00 Operational

6 CUMMINS 600.00 550.00 9391.00 Operational

7 CUMMINS 600.00 550.00 8797.00 Operational

8 CUMMINS 600.00 550.00 9356.00 Operational

27.B PB 106, Romblon 16.03 1950.00 3 14400.00 6400.00 Normal


Operation

1 DAIHATSU 3600.00 2000.00 8714.18 Operational

2 DAIHATSU 3600.00 2200.00 94697.41 Operational

3 DAIHATSU 3600.00 2200.00 65564.95 Operational

4 DAIHATSU 3600.00 84647.30 Deactivated 06/15/2015 Seizure at main Included in the SPUG -- -- NO --
bearing journal no. Recommendations
4 on Decommissioning
Program for CY
2021- 2025 dated 30
July 2020
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 02 Oct (12nn) - 03 Oct (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
28 BANTON DPP, 24.00 192.00 5 1376.00 1000.00 Normal
Catarman, Hambian, Operation
Banton, Romblon

1 PERKINS 163.00 100.00 43956.90 Operational Standby

2 PERKINS 163.00 100.00 38860.33 Operational Standby

3 FG WILSON 250.00 .00 7159.00 Deactivated 06/21/2019 Damaged intake & • PR No. -- -- NO 12/31/2023 GENSET REMARKS:
exhaust valves, S1-BAP23-011, <br/>Deactivated<br/><br/>TROUBLE
piston, liner, piston along with approved REMARKS: <br/>
ring and connecting PO No. 021879
rod bearing (HLYC) and PO No.
021880
(Gentromech), took
effect on the 02 of
August 2023, with a
delivery period of
sixty (60) calendar
days. • Awaiting
delivery of spare
parts as specified in
the (PR).
4 CUMMINS 300.00 300.00 22115.50 Operational

5 CUMMINS 200.00 200.00 4680.98 Operational

6 CUMMINS 300.00 300.00 7263.17 Operational

C SIBUYAN GRID, 24.00 1369.00 0 5816.00 2800.00 Normal


Poblacion, San Operation
Fernando, Romblon

30 SAN JOSE DPP, 24.00 414.00 6 1864.00 850.00 Normal


Romblon Operation

1 PERKINS 163.00 20435.51 Non-Operatio 04/18/2022 Water and oil Action Plan: Covert -- -- NO October 2023 for overhauling
nal dillution and the power analyzer to
diffective power depp sea
analyzer

2 PERKINS 163.00 60408.37 Non-Operatio 07/04/2023 Knocking sound 1. Wheelcase has 12:50 -- NO 10/25/2023 on maintenance overhauling
nal was observed already been TDR is 10 days after the arrival of
transported to San crankshaft
Jose DPP on 06
August 2023 2. The
San Jose DPP
crankshaft arrived at
the MROD
Warehouse on 07
August 2023. Both
the San Jose DPP
crankshaft and the
Tingloy DPP
crankshaft will be
taken to the MRMD
office for assessment
on 14 August 2023
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 02 Oct (12nn) - 03 Oct (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
3 CAT 228.00 Deactivated 08/26/2016 No identical genset, Recommended for -- -- NO --
operation manual, Decommissioning
parts book and list dated February 26,
of spare parts are 2020
not available

4 FG-WILSON 410.00 250.00 19726.27 Operational

5 CUMMINS 300.00 300.00 14703.00 Operational

6 CUMMINS 300.00 300.00 8990.00 Operational

7 CUMMINS 300.00 15009.00 Non-Operatio 09/27/2023 nusual sound & Action plan: source 20:10 -- NO -- burned out stator
nal smoke come out on out materials and
generator side and transport the stator to
upon checking it Calapan for
found out that stator rewinding
winding burn out.

29.C SIBUYAN DPP, 24.00 979.00 4 4466.00 1450.00 Normal


Poblacion, San Operation
Fernando, Romblon

1 PERKINS 260.00 Deactivated -- High fuel rate and Included in the 2nd -- -- NO --
high net heat rate batch of
with small capacity Decommissioning
synchronized to dated February 26,
Cantingas Mini 2020
Hydro. Operation of
the said unit is
already
non-economical

2 PERKINS 260.00 Deactivated -- High fuel rate and Included in the 2nd -- -- NO --
high net heat rate batch of
with small capacity Decommissioning
synchronized to dated February 26,
Cantingas Mini 2020
Hydro. Operation of
the said unit is
already
non-economical

3 CKD 163.00 Deactivated -- The unit is obsolete Included in the 2nd -- -- NO --


and were batch of
manufacture/model Decommissioning
last 1992 and spare dated February 26,
parts were no 2020
longer in circulation

4 PERKINS 163.00 .00 60290.30 Non-Operatio ----- Due for PMS --------- ---- ---- NO -----
nal
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 02 Oct (12nn) - 03 Oct (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
5 CKD 220.00 Deactivated -- The unit is obsolete Included in the 2nd -- -- NO --
and were batch of
manufacture/model Decommissioning
last 1992 and spare dated February 26,
parts were no 2020
longer in circulation

6 CAT 600.00 Deactivated -- Owned by -- -- -- NO --


ROMELCO

7 MAN 500.00 350.00 32611.00 Operational

8 MAN 500.00 .00 0.00 Deactivated 08/23/2023 due to excessive Ongoing 08:10 -- NO 09/22/2023
presence of water maintenance & to
at charged conduct TOH.
intercooler.

9 CUMMINS 600.00 550.00 20102.00 Operational

10 CUMMINS 600.00 .00 13856.00 Deactivated 09/19/2023 mechanical 0n going 03:00 -- NO 09/30/2023
knocking at cylinder maintenance and
no.4 evaluation

11 CUMMINS 600.00 550.00 23191.00 Operational

31 CONCEPCION DPP, 23.78 165.00 6 1226.00 890.00 Normal Line Fault


Poblacion, Conception, Operation TPI October 03, 2023 @0125H due to a
Romblon fault in line 3. Power restored @0138H.
The load involves 110kW.

1 PERKINS 163.00 145.00 42918.70 Operational

2 PERKINS 163.00 145.00 41268.80 Operational

3 CUMMINS 300.00 .00 10853.82 Non-Operatio 09/18/2023 Transfer to -- -- -- NO -- Transfer to Corcuera DPP.
nal Corcuera DPP

4 CUMMINS 200.00 200.00 7497.26 Operational

5 CUMMINS 200.00 200.00 7804.94 Operational

6 CUMMINS 200.00 200.00 8201.65 Operational

32 CORCUERA DPP, San 24.00 319.00 4 2026.00 545.00 Normal


Agustin, Corcuera, Operation
Romblon

1 PERKINS 163.00 .00 22000.00 Deactivated January 2015 Beyond economic Beyond economic -- -- NO -- For decommissioning as recommend by
repair repair MRMD technical personnel

2 PERKINS 163.00 90.00 26846.76 Operational


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 02 Oct (12nn) - 03 Oct (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
3 MAN 500.00 .00 40674.29 Deactivated 07/22/2022 Damaged 1. Completed the 14:55 -- NO 10/20/2023 Damaged connecting rod No. 4
connecting rod No. installation of piston
4 and piston ring 2.
Ongoing lapping of
valves 3. Ongoing
replace of valve
inserts

4 FG WILSON 300.00 .00 7300.13 Deactivated 12/06/18 Damaged MRMD submitted -- -- NO -- For decommissioning
crankshaft Certification in the
assessment of the
unit last 03 August
2020. The unit was
recommended for
decommissioning.

5 CUMMINS 300.00 240.00 18416.61 Operational

6 CUMMINS 300.00 .00 9001.87 Non-Operatio 08/28/23 Unusual vibration 1. Completed the 07:15 -- NO 09/27/2023 Unusual vibration from the muffler and
nal from the muffler installation of copper fumes leak coming out of the manifold
and fumes leak washer and stopper
coming out of the for injector, rocker
manifold arms assemblies,
and turbo charger. 2.
Stopped the injector
travel setup and
forwarded a SRF to
LOD on 28
September 2023
requesting for their
expertise on injectors
travel setup.

7 CUMMINS 300.00 215.00 12825.12 Operational

BANSUD-RENTAL, 0.00 0.00 0 Non-Operatio 11/09/2022 End Contract of PSI -- -- -- NO -- Plant Trouble:
Brgy. Conrazon, nal Rental Gensets
Bansud,, Oriental
Mindoro

33 PULANG LUPA 0.00 0.00 0 Non-Operatio 12/31/2022 End Contract of PSI -- -- -- NO -- Plant Trouble:
RENTAL, Sitio Pulang nal Rental Gensets
Lupa, San Jose,
Occidental Mindoro,
Occidental Mindoro