NATIONAL POWER CORPORATION

Small Power Utilities Group


Daily Plant Status Report - 10 Aug (12nn) - 11 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
MASBATE TL 69 KV, 24.00 13610.00 0 16000.0016000.00 Normal
Pinamarbuhan, Mobo, Operation Peak Demand: 22.40 MW
Masbate Supply Capacity: 35.65 MW

48 BATAN DPP, Iraya, 24.00 431.00 6 2430.00 1898.00 Normal


Batan, Rapu-Rapu, Operation
Albay

1 PERKINS 320.00 218.00 10952.80 Operational

2 Dale Perkins 560.00 350.00 37563.30 Operational

3 PERKINS 250.00 160.00 6481.50 Operational

4 MING POWER 300.00 250.00 9667.00 Operational

5 MING POWER 500.00 470.00 6547.00 Operational

6 MING POWER 500.00 450.00 7508.00 Operational

50 RAPU-RAPU DPP, 24.00 413.00 7 2690.00 2050.00 Normal


Poblacion, Rapu-Rapu, Operation
Albay

1 FG WILSON 250.00 200.00 3020.70 Operational

2 PERKINS 320.00 .00 4020.93 Non-Operatio 07/18/2023 Damaged rocker Dismantle/inspection 19:32 NO 12/31/2023
nal arm, cylinder head; of cylinder head
intake and exhaust assembly and
valves and valve moving integral parts
seat inserts. for damages.

3 PERKINS 320.00 250.00 4956.60 Operational

4 MAN 500.00 450.00 39350.81 Operational

5 CUMMINS 300.00 250.00 7103.76 Operational

6 CUMMINS 500.00 450.00 3501.85 Operational

7 CUMMINS 500.00 450.00 6441.56 Operational

52 ATULAYAN DPP, 16.00 9.10 4 94.00 76.00 Normal


Atulayan, Sagnay, Operation
Camarines Sur

1 CUMMINS 22.00 18.00 20525.30 Operational

2 CUMMINS 22.00 18.00 11796.60 Operational

3 Cummins 25.00 20.00 147.26 Operational

4 Cummins 25.00 20.00 111.53 Operational


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 10 Aug (12nn) - 11 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
54 CALAGUAS DPP, Sitio 8.00 107.00 4 483.00 410.00 Normal
Sugod, Banocboc, Operation
Vinzons, Camarines
Norte

1 CUMMINS 90.00 80.00 7370.00 Operational

2 CUMMINS 80.00 70.00 4352.30 Operational

3 PERKINS 163.00 140.00 45399.00 Operational

4 CUMMINS 150.00 120.00 24672.00 Operational

C TICAO GRID, San 24.00 2574.00 0 8235.20 5060.00 Normal Line Fault & Line Maintenance
Jacinto, Masbate Operation Line Fault: 1916H-1945H @ F2 &
0400H-0536H @ F1; Line Maintenance:
1945H-0825H @ F2 (Brgy. Gumunab to
Talisay)

55.C TICAO DPP, Poblacion, 24.00 2076.00 7 5898.00 4150.00 Normal


Dist. 4, San Jacinto, Operation
Masbate

(RNTL) Aggreko 2000.00 2000.00 6841.29 Operational

1 CUMMINS 600.00 500.00 32798.00 Operational

2 CUMMINS 600.00 .00 33445.00 Non-Operatio 04/17/2023 Heavy smoke For further -- -- NO 09/30/2023
nal comes out at troubleshooting of
Breather side and unit
exhaust muffler.
Bearing Seizure

3 CUMMINS 600.00 .00 33082.00 Non-Operatio 07/17/2023 Unit Under PMS On-going Major -- -- NO 08/15/2023
nal Overhauling

4 CUMMINS 600.00 500.00 19588.00 Operational

5 MAN 528.00 400.00 35788.23 Operational

6 FG-WILSON 410.00 300.00 12441.26 Operational

7 DALE 560.00 450.00 350.77 Operational


PERKINS

56.C PB 114, Brgy. Rawis, 15.65 500.00 4 2475.00 850.00 Normal


District II, San Jacinto, Operation
Masbate

1 WEICHAI 600.00 500.00 832.43 Operational

2 FG-WILSON 675.00 350.00 12.65 Operational


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 10 Aug (12nn) - 11 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
3 WEICHAI 600.00 .00 151.07 Non-Operatio 05/15/2023 Knocking sound on UNIT UNDER -- -- NO 08/31/2023
nal cylinder head WARRANTY, FOR
CHECKING AND
REPAIR BY
SUPPLIER

4 WEICHAI 600.00 .00 737.57 Non-Operatio 08/10/2023 Broken alternator UNIT UNDER 10:26 -- NO 08/13/2023
nal belt WARRANTY, FOR
CHECKING AND
REPAIR BY
SUPPLIER

56 SAN PASCUAL DPP, 23.91 441.00 6 2830.00 2000.00 Normal Line Fault
Terraplin, San Pascual, Operation Line Fault: 0402H-0411H
Masbate

1 PERKINS 560.00 .00 0.00 Deactivated 05/19/2021 Irreparable engine Deactivated as per -- -- NO --
crankshaft damage approved Memo No.
and obsolescence SPU-21-5245 dated
of spare parts. 04 November 2021.
Deactivation date:
25 September 2021

2 PERKINS 260.00 200.00 3486.17 Operational

3 VOLVO 500.00 400.00 2350.24 Operational

4 FG-WILSON 410.00 300.00 14672.18 Operational

5 CUMMINS 300.00 300.00 12622.19 Operational

6 MING POWER 500.00 500.00 5214.48 Operational

7 MING POWER 300.00 300.00 7686.02 Operational

57 CHICO DPP, Chico, 16.00 30.00 3 225.00 183.00 Normal


Cawayan, Masbate Operation

1 FG-WILSON 40.00 28.00 29316.40 Operational

2 FG-WILSON 135.00 105.00 12344.10 Operational

3 Cummins 50.00 50.00 2164.80 Operational

58 GILOTONGAN DPP, 16.00 116.00 3 620.00 200.00 Plant 05/25/2023 Plant shutdown at -Prepared 12:00 04:00 YES
Gilotongan, Cawayan, Shutdown 1200H-1600H & Emergency PR No.
Masbate 0000H-0400H due GTD23-015 & 016.
to non-operational -Fuel Injection
units (Damaged Pumps were sent to
cylinder head of WMTSD for repair
Unit 1, Defective and recalibration.
Fuel Injection
Pumps of Unit 2&3.
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 10 Aug (12nn) - 11 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
1 FG-WILSON 90.00 .00 22771.00 Non-Operatio 03/10/2023 Damaged cylinder Manually stop the -- -- NO 09/30/2023
nal head block and unit. Pull-out of
integrated cylinder head
mechanical assembly for
components repair/reconditioning
and outsourcing of
needed spare parts
from other
Plant/Area.

2 FG-WILSON 135.00 .00 14658.46 Deactivated 01/05/2023 Insufficient fuel Deactivated as per -- -- NO 08/31/2023
pressure at high approved Memo No.
pressure lines. SPU-23-0788 dated
Possible cause: 14 February 2023
defective fuel &
barrel assembly

3 FG-WILSON 135.00 .00 13370.34 Non-Operatio 05/05/2023 Insufficient fuel Pull-out of Fuel -- -- NO 08/31/2023
nal pressure at high Injection Pump for
pressure lines. repair/replacement.
Possible cause:
defective fuel &
barrel assembly

4 PERKINS 260.00 200.00 63276.13 Operational

59 PENA DPP, Pena, 16.00 38.00 3 278.00 252.00 Normal


Cawayan, Masbate Operation

1 FG-WILSON 90.00 72.00 34341.22 Operational

2 CUMMINS 88.00 80.00 6606.90 Operational

3 Cummins 100.00 100.00 1830.55 Operational

60 NARO DPP, Naro, 24.00 167.00 3 695.00 530.00 Normal


Cawayan, Masbate Operation

2 FG-WILSON 135.00 .00 9910.00 Deactivated 10/15/2022 Defective Fuel Approved for -- -- NO 11/30/2023
Injection Pump temporary
deactivation per
Memo No.
SPU-23-2546

3 Weichai 180.00 165.00 5287.45 Operational

4 Weichai 180.00 165.00 6133.17 Operational

5 CUMMINS 200.00 200.00 516.80 Operational

61 GINAWAYAN DPP, 8.00 37.00 3 225.00 183.00 Normal


Guinawayan, Placer, Operation
Masbate
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 10 Aug (12nn) - 11 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
1 FG-WILSON 40.00 28.00 23801.30 Operational

2 FG-WILSON 135.00 105.00 15612.60 Operational

3 Cummins 50.00 50.00 1149.00 Operational

62 NABUCTOT DPP, 8.00 26.00 3 125.00 120.00 Normal


Nabuctot, Placer, Operation
Masbate

1 FG-WILSON 25.00 20.00 28713.49 Operational

2 CUMMINS 50.00 50.00 8129.60 Operational

3 Cummins 50.00 50.00 1453.20 Operational

63 DANCALAN DPP, 8.00 34.00 3 265.00 210.00 Normal


Dancalan, San Pascual, Operation
Masbate

1 FG-WILSON 80.00 65.00 17411.46 Operational

2 FG-WILSON 135.00 105.00 10446.55 Operational

3 Stamford 50.00 40.00 33.90 Operational

64 MALAKING ILOG DPP, 16.00 41.00 3 323.00 230.00 Normal


Malaking-Ilog, San Operation
Pascual, Masbate

1 FG-WILSON 60.00 50.00 28877.90 Operational

2 CUMMINS 100.00 80.00 7086.90 Operational

3 PERKINS 163.00 100.00 289.14 Operational

65 MABABANGBAYBAY 8.00 36.00 2 140.00 130.00 Normal


DPP, Mababangbaybay, Operation
Claveria, Masbate

1 FG-WILSON 60.00 50.00 22468.60 Operational

2 CUMMINS 80.00 80.00 5513.00 Operational

66 OSMENIA DPP, 16.00 47.00 3 378.00 205.00 Normal


Osmenia, Claveria, Operation
Masbate

1 FG-WILSON 80.00 .00 19701.50 Non-Operatio 05/28/2023 Cylinder head water Immediately stopped -- -- NO 08/31/2023
nal leakage operation and
implemented inspecti
on/troubleshooting

2 FG-WILSON 135.00 105.00 15000.80 Operational

3 PERKINS 163.00 100.00 26946.63 Operational


NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 10 Aug (12nn) - 11 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
67 PENAFRANCIA DPP, 8.00 41.00 2 215.00 170.00 Normal
Penafrancia, Claveria, Operation
Masbate

1 FG-WILSON 80.00 65.00 21661.40 Operational

2 FG-WILSON 135.00 105.00 7060.30 Operational

68 QUEZON DPP, 8.00 27.00 2 140.00 130.00 Normal


Quezon, Claveria, Operation
Masbate

1 FG-WILSON 60.00 50.00 25033.40 Operational

2 CUMMINS 80.00 80.00 3431.30 Operational

69 PALUMBANES DPP, 24.00 35.40 4 282.00 207.00 Normal


Palumbanes, Operation
Caramoran,
Catanduanes

1 CUMMINS 50.00 42.00 533.10 Operational

2 STAMFORD 52.00 Deactivated 03/07/2022 A joint certification Deactivated as per -- -- NO --


from MRMD and approved Memo No.
LOD was issued on SPU-22-2226 dated
11 April 2022 13 May 2022
justifying
nomination for
decommissioning
for the unit due to
its irreparability and
obsolescence of
spare parts.
Deactivation date:
25 May 2022

3 CUMMINS 80.00 65.00 7.41 Operational

4 Cummins 50.00 50.00 0.10 Operational

5 Cummins 50.00 50.00 470.60 Operational

70 CLAVERIA DPP, 14.50 307.00 3 1620.00 700.00 Normal Line Maintenance


Poblacion 1, Claveria, Operation Line Maintenance: 1956H-2026H both
Masbate feeders

1 PERKINS 560.00 350.00 661.02 Operational

2 PERKINS 560.00 350.00 47663.78 Operational

4 CUMMINS 500.00 .00 824.83 Non-Operatio 08/10/2023 Abnormal sound at On going checking / 20:26 ---- NO 08/13/2023
nal engine during troubleshooting
staring
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 10 Aug (12nn) - 11 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
D CATANDUANES GRID, 24.00 14391.00 0 29715.0014950.00 Normal
Marinawa, Bato, Operation
Catanduanes

71.D BALONGBONG HEPP, 8.52 1000.00 2 1800.00 1800.00 Normal


Sibacungan, Bato, Operation
Catanduanes

1 SFW 900.00 900.00 32526.06 Operational


900-10/1430

2 SFW 900.00 900.00 156134.52 Operational


900-10/1430

72.D MARINAWA DPP, 0.00 0.00 3 9320.00 4200.00 Normal


Marinawa, Bato, Operation
Catanduanes

2 PERKINS 560.00 Deactivated -- Irreparable engine Deactivated as per -- -- NO --


crankshaft damage approved Memo No.
and obsolescence SPU-21-5245 dated
of spare parts. 04 November 2021.
Deactivation date:
25 September 2021

3 PERKINS 560.00 Deactivated -- Unit was approved Deactivated as per -- -- NO --


for transfer to Ticao approved Memo No.
DPP as per Memo SPU-22-2792 dated
dated 26 Apr 2022. 20 June 2022.
Unit was
dismantled and
hauled to Ticao
DPP last 14-19 Jun
2022.

5 CUMMINS 1000.00 Deactivated -- Irreparable engine Deactivated as per -- -- NO --


crankshaft damage approved Memo No.
and obsolescence SPU-21-5245 dated
of spare parts. 04 November 2021.
Deactivation date:
25 September 2021

6 CUMMINS 1200.00 1000.00 9150.00 Operational

6 CUMMINS 1200.00 1000.00 9150.00 Operational

7 CUMMINS 1200.00 Deactivated -- Genset transferred -- -- -- NO --


to Claveria DPP

8 DAIHATSU 3600.00 2200.00 11431.91 Operational

73.D VIGA DPP, San Isidro, 0.00 0.00 0 1620.00 Normal


Viga, Catanduanes Operation
NATIONAL POWER CORPORATION
Small Power Utilities Group
Daily Plant Status Report - 10 Aug (12nn) - 11 Aug (12nn)

Plant Peak Rated Dep Plant / Genset Trouble Time Target


Opr Load Unit No Make/Brand Accu. Plant/Genset Is Remarks
Rnng Hrs. Status Restoration
No Name, Province Hrs (KW) Capacity (KW) Date Started Reason Action Taken Intruptd Restored Restored Date
1 PERKINS 560.00 Deactivated 10/17/2021 A joint certification Deactivated as per -- -- NO --
from MRMD and approved Memo No.
LOD was issued on SPU-21-5769 dated
01 December 2021 24 December 2021.
justifying the
proposed
decommissioning of
the genset due to
damaged engine
block, crankshaft
and other engine
parts. Deactivation
date: 25 December
2021

2 CUMMINS 500.00 Deactivated 02/09/2023 Preparation for the Transferred as per -- -- NO --


re-entry of NPC in approved Memo No.
Claveria, Masbate CAG-PPAD-23-023
and ensure power dated 26 January
supply efficiency 2023

4 PERKINS 560.00 Deactivated -- Unit was approved Deactivated as per -- -- NO --


for transfer to Batan approved Memo No.
DPP as per Memo SPU-22-2792 dated
dated 26 Apr 2022. 20 June 2022.
Unit was
dismantled and
hauled to Batan
DPP last 06-14 Jun
2022.