Professional Documents
Culture Documents
Manager's Quarter 2
Manager's Quarter 2
ARCHITECTURAL DRAWINGS
A PROJECT OF
202 FIRST FLOOR SLAB LAYOUT · This drawing is the property of SILVER BRICKS.
101(A) BLOW-UP DETAIL(for ground floor) This drawing should not be used without
the company's concern.
101(B) BLOW-UP DETAIL(for ground floor) 203 SECOND FLOOR SLAB LAYOUT
· All dimensions are in feet and inches,
102 FIRST FLOOR PLAN 204 THIRD FLOOR SLAB LAYOUT unless specified.
102(B) BLOW-UP DETAIL(for 1st to 9th floor) 206 FIFTH FLOOR SLAB LAYOUT · Any discrepancy during execution should be
informed
102(C) BLOW-UP DETAIL(for 1st to 5th floor) 207 SIXTH FLOOR SLAB LAYOUT
102(D) BLOW-UP DETAIL(for 1st to 5th floor) 208 SEVENTH FLOOR SLAB LAYOUT
client name:
102(E) BLOW-UP DETAIL(for 6th to 8th floor) 209 EIGHTH FLOOR SLAB LAYOUT
INFINIA GROUP
103 SECOND FLOOR PLAN 210 NINTH FLOOR SLAB LAYOUT
104 THIRD FLOOR PLAN 211 ROOF SLAB LAYOUT ARC ITECT NAME
Asaduzzaman Chowdhury
105 FOURTH FLOOR PLAN 212 ROOF TOP SLAB LAYOUT C - 040
Sinthia Shobnom
106 FIFTH FLOOR PLAN 213 OHWT & MACHINE ROOM SLAB LAYOUT S - 136
107 SIXTH FLOOR PLAN 301 WEST ELEVATION(FRONT) Aniket Chowdhury
C - 066
108 SEVENTH FLOOR PLAN 302 SOUTH ELEVATION Kaushik Das
AD - 064
109 EIGHTH FLOOR PLAN 303 EAST ELEVATION
PROJECT LOCATION:
KESHABPUR, SHITALPUR,
SITAKUNDA.
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
118'-10"
1'
1'
IEB BHABAN (3rd floor),
B
S.S. KHALED ROAD,
24
14 GREEN LAWN
'
LALKHAN BAZAR, CHATTOGRAM.
12'-6"
12'-6"
146'-6" PH: +880-02-41360233,
10" www.silverbricksbd.com.
1'-3" 1'-3"
5'-5"
5" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3"
1'-6"
22'-0" 6'-0" 22'-0" 6'-0" 22'-0" 6'-0" 22'-0" 6'-0" 22'-0"
1'-6"
1'-6"
2'-6"
2'-6"
10"
10"
10"
10"
Note:
A A
1'-6"
· This drawing is the property of SILVER BRICKS.
10"
2"
2"
2"
5'-2"
This drawing should not be used without
10" 22'-10" 6' 22'-10" 6' 22'-10" 22'-10" the company's concern.
10" 10" 10" 10" 10" 10"
· All dimensions are in feet and inches,
19'-3"
19'-3"
19'-3"
19'-8"
19'-8"
9'-3"
01 02 03 02 03 02 01 unless specified.
14(a) +1'-6'' LEVEL +1'-6'' LEVEL +2'-0'' LEVEL
+2'-0'' LEVEL · Measurement should not be taken by
W-3
fitting the scale on drawing.
5" 1'-10"
6'-7"
1'-11"
· Any discrepancy during execution should be
2'-1"
2'-6"
10"
10"
2'-1"
2'-6"
1'-4"
B B
1'-3" 22' 6' 18'-9" 5" 3'-3" 6' 22' 6' 22' 6'1'-3" 5' 3'-1" 13'-6"
3'-4"
10" 5" 10"
5'
5'
2'-6"5'
5'
1'-3" 1'-3" 04 04
2 Tread @1'-3"
1'-3" 1'-3" 1'-3" 1'-3"
2'-6"
10"
5"
5"
+2'-0'' LEVEL +2'-0'' LEVEL 14
client name:
1'-3"5"
C C
2'-6"
5'
09 INFINIA GROUP
12'-2"
3 Tread @10"
STAIR-1 2'-6"
Blow-Up Detail-1 07 Blow-Up Detail-2
14'-8" 48'-4" 5'-7"
89'-10"
29'-8"
17'-2"
14'-8"
14'-8"
UP D
10
E +1'-0'' LEVEL E ARC ITECT S NAME
19'-8"
10'-6"
STAIR-2
14 +6'' LEVEL
08 Asaduzzaman Chowdhury
12'-6"
2 Tread @1'-3"
A LOBBY 04(a) A C - 040
2'-6"
1'-3"
2'-6"
UP
10"
09 Sinthia Shobnom
F 10" 10" F S - 136
17'-10" 5'-10" 6' 19'-2" 14'-8" 50'-10" 5'-7" 20'-7" 3'-6"
3'-9" 2'-11"5'
2'-1"
11'-8"
5'
3'-9" 2'-11"5'
5'
10"
05 05 Aniket Chowdhury
104'-11"
05
2'-6"
05 10"
2'-6"
10"
11'-8"
C - 066
G G
Kaushik Das
10"
+2'-0'' LEVEL
3" 2"
4'-2"
+2'-0'' LEVEL
+2'-0'' LEVEL +2'-0'' LEVEL 3"
3'-9"
10"
AD - 064
10"
10" 10"
23'
+6'' LEVEL
22'-9"
10"
10"
12 13 11 10" 11 revi i n n de cripti n
10" 10" 11 10" 06 10" 06(a) 11 06 10"
19'-8"
14'-8"
14'-8"
14'-8"
10" 10" 1'
14'-8"
+2'-0'' LEVEL +2'-0'' LEVEL 14
10'-3" 10"
2'-6"
+1'-6'' LEVEL
2'-6"
3 Tread @10"
3 Tread @10"
10" 8'-7"
1'-1"
1'-6"
10"
2' 3'-4" 4' 3'-4" 10"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
10"
2'-3"8'-4" 10"
H H
11"
10"
16'-7" 3'-4" 6' 22' 6' 22' 22' 6' 22'
5'-5"
14'-3"
16 6'
5" 10" 2'-6" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3"
12'-4"
12'-4"
10"
10"
PROJECT NAME:
2'-3"
10"
15 15 15
2'
2'
3'-4" 2'-7"
10" 7'-1 1'-9"10" 10"
4'-1"
4'-1"
6'-1"
6'-1"
17 17 QUARTER
"
0"
10
7'-
1'
10"
142'-8" DRAWING TITLE:
FLOOR PLANS
ap - 1 0 1
rev- 0 0
A PROJECT OF
11 Riser
5'-6"
Note:
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
the company's concern.
12'
2 Riser
1'
· All dimensions are in feet and inches,
unless specified.
11 Riser
5'-6"
fitting the scale on drawing.
10"
STAIR-1 SECTION (for Blow-up ARC ITECT S NAME
C C Detail -1)
1'-8" 2'-1"
Asaduzzaman Chowdhury
C - 040
5' 8'-4" 5' Sinthia Shobnom
4'-7"
10" S - 136
10 Tread @10" 10" Aniket Chowdhury
10" C - 066
8'-5"
12'-2"
1 Kaushik Das
2" thick tiles tread
4'
1 Tread @10"
AD - 064
1
9'-11"
D 5" UP
10 Tread @10" 07
D revision no description
19'-8"
3'
19'-8"
2'-6"
E E
10"
10"
2'-1"
1'
6'-11"
09 5" thick R.C.C. waist slab
1'
3'
8'-11"
1
2" thick screed
10" 3'-6" 4'-5" 8'-7"
10" PROJECT NAME:
10" 1
2" thick cs plaster
1'-11"
INFINIA MANAGER'S
QUARTER
1'
F F
1'
PROJECT LOCATION:
8'-9" 10'-5"
KESHABPUR, SHITALPUR,
SITAKUNDA.
20'
DRAWING TITLE:
blow-up details
03 04 05 DRAWING STATUS:
FOR APPROVAL
ap-101(A)
rev- 00
A PROJECT OF
11 Riser
5'-6"
Note:
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
the company's concern.
12'
2 Riser
1'
· All dimensions are in feet and inches,
unless specified.
11 Riser
5'-6"
fitting the scale on drawing.
11 12 13 · Any discrepancy during execution should be
informed
20'-7"
1'
10"
ARC ITECT S NAME
Detail -2)
C C Asaduzzaman Chowdhury
1'
C - 040
Sinthia Shobnom
2'
09 S - 136
6'-11"
5'
1'-3" 1'
7'-9"
7'-9"
Aniket Chowdhury
10"
3'
5" 3'-6" 5' 8'-7" 4'-4"
C - 066
1 Kaushik Das
2" thick tiles tread
3 Tread @10"
AD - 064
2'-2"
2'-6"
1
2" thick tiles riser
1'
10"
revi i n n de cripti n
D D
2'-6"
19'-8"
19'-8"
7"
5'-4" 8'-4" 5'
3'
E 3" E
4'-7"
10"
1 Tread @10"
5" thick R.C.C. waist slab
10"
12'
7'
4'
1
2" thick screed
STAIR-2 PROJECT NAME:
08 10 Tread @10"
4'-7"
1'-8"
UP 2" thick cs plaster INFINIA MANAGER'S
1'-3"
QUARTER
2'-6"
F F PROJECT LOCATION:
18'-1"
10"
10"
KESHABPUR, SHITALPUR,
1'-3" 1'-3" SITAKUNDA.
20'-7"
DRAWING TITLE:
BLOW-UP DETAILS
11 12 13 DRAWING STATUS:
FOR APPROVAL
ap-101(B)
rev- 00
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
Blow-Up Detail-7
146'-6"
LALKHAN BAZAR, CHATTOGRAM.
B
PH: +880-02-41360233,
10" 10" 10" 10" 10" 10" 10" 10" www.silverbricksbd.com.
22'-10" 6' 22'-10" 6' 22'-10" 6' 22'-10" 6' 24'-6"
5"
5"
5"
5"
Note:
5'-5"
4'-7"
4'-7"
4'-7"
5'-5"
31 31 31 31
5'
5'
31 · This drawing is the property of SILVER BRICKS.
5"
5"
5"
5"
This drawing should not be used without
2'-1"
2'-6"
5"
unless specified.
21
18 19 20
24'-3"
· Measurement should not be taken by
30'-1"
24'-3"
24'-3"
19'-3"
5" fitting the scale on drawing.
24'-3"
5"
24'-8"
19'-8"
1' 22'-6" 29'-3" 36'-6" 30'-1" 5'-8" 18'-1" · Any discrepancy during execution should be
10" 2" 5" 5"
10" informed
1'-11"
client name:
5"
5"
2'-6"
5"
B B
5"
1'
1'-3" 22'
2"
6'
1'-3"
8'-6" 5' 8'-6" 6' 8'-6" 5' 8'-6" 6' 8'-6" 5' 8'-6"
1'-3"
6'
1'-3" 5"
5'
5"
12' 4'-2"
10" 5" INFINIA GROUP
5'-5"
3" 22 1'-3" 22
5'
5'
5'
5'
10" 1'-3" 1'-3" 22 1'-3"
6'-2" 20'
10"
5"
5"
C C
5"
3'-4" 11'-6" 10'-5" 3'-11" ARC ITECT S NAME
89'-10"
DN
5"
7'-3"
Stair-1 5" 25 Asaduzzaman Chowdhury
1'-6"
89'-10"
11'-9"
18'-10"
Blow-Up Detail-4
24'-3"
24'-3"
D UP
D Sinthia Shobnom
18'-10"
18'-10"
18'-5"
S - 136
E DN E
5"
24 25 UP Kaushik Das
10" 5"
3'-11" AD - 064
10"
10"
5"
5"
10"
F F
6'-10" 15' 15'-9" 10'-5" 64'-6" 6'-2" 7'-1" 17'
4'-7"
4'-7"
4'-7"
5'-5"
5'
5'
5'
31 10" 23 5" 23
23 revi i n n de cripti n
10"
5"
5"
5"
5"
5"
5"
2'-6"
G G
2'-6"
2'-6"
2'-6"
2'-6"
7'
7'
7'
7'-3" 3'-6" 6'-6" 3'-6" 6' 3'-6" 6'-5" 6'-6" 3'-6" 6' 3'-6" 6'-5" 6'-6" 3'-6" 6' 3'-6" 6'-5" 10' 6' 24'-6"
5" 10" 10"
4'
5" 5" 10" 10" 5" 10" 5" 5" 10" 10" 5"
4'
4'
4'
4'
10'-1"
10'-6"
10'-6"
27 27 27 27 27 27 27 27
4'-1"
4'-1"
4'-1"
4'-1"
4'
4'
4'
5"
5"
5"
5"
5"
5"
5"
5"
5"
24'-8"
35'-6"
11'-8"
10'-10"
5'-10"
5'-10"
5'-10"
5"
5'
5'
5'
5'
7'-10" 3'-4" 3'-4" 8'-4" 6' 8'-3" 3'-4" 3'-4" 8'-4" 6' 8'-3" 3'-4" 3'-4" 8'-4" 6' 8'-3" 3'-4" 3'-4" 8'-4"
28 28 5" 28 5" 28 5" 5" 28 5" 28 5" 5" 28 5" 28 5"
10'-10"
10'-10"
10'-10"
10"
21 PROJECT NAME:
5'-10"
5'-10"
5'-10"
5'-10"
5" 10" 5" 10" 5" 5"
10"
5'
5'
5'
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 10" 4'-6" 6'-3" 6'-4" 4'-6"
INFINIA MANAGER'S
5"
5"
5"
5"
5"
5"
5"
5"
2'-6"
H H QUARTER
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
3'-7"
3'-7"
3'-7"
30 30 30 30 30 30 30 30
5"
29 29 29 29 29 29 29 29
5"
5"
5"
5'-5"
5'-5"
5" 5"
3'-11"
3'-11"
3'-11"
3'-6"
3'-6"
3'-6"
3'-6"
3'-6"
31 31 31 31
31 31
31 PROJECT LOCATION:
5"
5"
5"
5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6" KESHABPUR, SHITALPUR,
10" 5" 5" 5" 5" 5" 5" 5"
SITAKUNDA.
Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5
B
Blow-Up Detail-5
146'-6"
Blow-Up Detail-6 DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
DRAWING STATUS:
No. FUNCTIONS DIMENSION No. FUNCTIONS DIMENSION
Stair-1 (18'-4'' X 10'-0'') (6'-2'' X 19'-8'')
FOR APPROVAL
Corridor-3
1ST FLOOR PLAN
07. 24.
08. Stair-2 (18'-8'' X 10'-0'') 25. Lift Lobby (9'-7'' X 8'-0'')
09. Passenger lift (8'-7'' X 6'-11'')
26. Corridor-4 (6'-2"x18'-10")
18. Dining-1 (30'-3"x29'-3" 27. Living+Dininng (11'-8"x10'-6")
19. Lounge (36'-6"x29'-3" (11'-8"x10'-10") drawing number
28. Bed Room
20. Dining-2 (30'-1"x29'-3" 29. Toilet (5'-10'' X 5'-2'')
(23'-8'' X 29'-3'')
21.
22.
Toilet Block
Corridor-1 (122'-2'' X 5'-0'')
30.
31.
Verandah
Green Box
(5'-4'' X 3'-2'')
(120'-2'' X 5'-0'')
ap - 1 0 2
23. Corridor-2 (120'-2'' X 5'-0'')
rev- 0 0
A PROJECT OF
11 Riser
5'
Note:
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
10'
the company's concern.
11 Riser
unless specified.
5'
· Measurement should not be taken by
fitting the scale on drawing.
10"
Detail -3)
ARC ITECT S NAME
C C
1'-8" 2'-1"
Asaduzzaman Chowdhury
C - 040
10" 5' 8'-4" 5' Sinthia Shobnom
4'-7"
S - 136
10 Tread @10" 10" Aniket Chowdhury
1
9'-11"
10" 2" thick tiles tread C - 066
8'-5"
12'-2"
Kaushik Das
4'
1
2" thick tiles riser AD - 064
4'-7"
STAIR-1
D UP
10 Tread @10" 07
D revision no description
2'-1"
19'-8"
3'
19'-8"
E E
5" thick R.C.C. waist slab
10"
10"
2'-1"
1'
5"
6'-11"
1
09
1' 2" thick screed
3'
8'-11"
1'-3" 3'-6" 4'-5" 8'-7" 1
5" 10" 2" thick cs plaster PROJECT NAME:
1'-11"
INFINIA MANAGER'S
QUARTER
1'
F F
1'
PROJECT LOCATION:
9'-7" 10'-5"
KESHABPUR, SHITALPUR,
SITAKUNDA.
20'
DRAWING TITLE:
blow-up details
03 04 05 DRAWING STATUS:
FOR APPROVAL
ap-102(A)
rev- 00
A PROJECT OF
13'
6'-3" 6'-4" IEB BHABAN (3rd floor),
5"2'-6" 5" 5" S.S. KHALED ROAD,
3'-4" 3'-5" 2'-6"
5"
5"
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
11 Riser
www.silverbricksbd.com.
5'
3'-11"
3'-11"
29 1'-8" 29
Note:
5'-3" 5'-4"
6'
6'
· This drawing is the property of SILVER BRICKS.
1'-3"
10'
5" This drawing should not be used without
the company's concern.
5" 10"
1'-3"
11 Riser
· All dimensions are in feet and inches,
5"
12'-2"
5'
unless specified.
5"
5" 5" · Measurement should not be taken by
fitting the scale on drawing.
13'
· Any discrepancy during execution should be
informed
1'
2" thick tiles tread Aniket Chowdhury
C C C - 066
1'
1
2" thick tiles riser Kaushik Das
AD - 064
2'
09
6'-11"
1'-3" 1'
7'-9"
7'-9"
10"
3'
8'-11"
revi i n n de cripti n
5" 3'-6" 5' 8'-7"
2'-2"
1'
10"
D D 1
2'-6"
19'-8"
5'-4" 8'-4" 5'
3'
1
E 3" E 2" thick cs plaster
4'-7"
10"
INFINIA MANAGER'S
10"
12'
7'
QUARTER
4'
STAIR-2
08 10 Tread @10" PROJECT LOCATION:
4'-7"
2'-1" 1'-8"
UP KESHABPUR, SHITALPUR,
10"
SITAKUNDA.
2'-6"
F F DRAWING TITLE:
18'-1" BLOW-UP DETAILS
1'-3"
20'-7"
DRAWING STATUS:
FOR APPROVAL
11 12 13 drawing number
5"
the company's concern.
2'-6"
2'-6"
G
2'-11"
unless specified.
2'
· Measurement should not be taken by
fitting the scale on drawing.
5'-1"
5'
3"
5"
5" 3" 3" 3" 3"
4'-8" 2'-6" 2' 2' 2'-6" 2'-6" 2' 2' 2'-6" client name:
9'-8"
3"
INFINIA GROUP
4'-5"
3" 3" 3" Asaduzzaman Chowdhury
4'-6" 4'-6" 4'-6" 4'-6" C - 040
Sinthia Shobnom
9'-8"
19'-3"
S - 136
5"
5"
21 19'
Aniket Chowdhury
C - 066
Kaushik Das
4'-4"
30'-1"
30'-1"
AD - 064
9'-7"
5"
5TH floor)
4'-8" 2'-6" 2' 2' 2'-6" 2'-6" 2' 2' 2'-6"
3" 3" 3" 3" 5"
5'
6'-6"
2'-6"
2'-6"
H H INFINIA MANAGER'S
9"
3"
3"
QUARTER
22'
5'-9"
4'-6"
3"
3'-9"
3" 3" 3" PROJECT LOCATION:
5'-5"
4'-7" 4'-6" 4'-6" 4'-6" 4'-7"
5'
KESHABPUR, SHITALPUR,
5"
SITAKUNDA.
10"
1'-3"
DRAWING TITLE:
5"
BLOW-UP DETAILS
5"
5"
18'-10" 4'-5"
5" 5" 5"
24'-6" DRAWING STATUS:
FOR APPROVAL
11 12 13 14
drawing number
ap-102(C)
rev- 00
A PROJECT OF
5"
· This drawing is the property of SILVER BRICKS.
5"
5"
This drawing should not be used without
5"
10"
the company's concern.
10"
A A · All dimensions are in feet and inches,
5"
unless specified.
5"
5'-5"
4'-7" 4'-6" 4'-6" 4'-6" 4'-7" · Measurement should not be taken by
5'
fitting the scale on drawing.
3'-9"
3'-9"
3" 3"
4'-6"
3" 3"
5'-9"
· Any discrepancy during execution should be
informed
3"
9"
3"
2'-6"
2'-6"
2'-6"
1'-9" 2' 2' 2'-6" 2'-6" 2' 2' 2'-6" 2' 1'-9"
client name:
3" 3" 3" 3"
INFINIA GROUP
6'-6"
ARC ITECT S NAME
5'
3" 3" 3" 3" 5" Asaduzzaman Chowdhury
5"
4'-8" 2'-6" 2' 2' 2'-6" 2'-6" 2' 2' 2'-6" BLOW-UP DETAIL-7 C - 040
Sinthia Shobnom
9'-7"
3"
(for 1ST to 5TH floor) S - 136
Aniket Chowdhury
C - 066
30'-1"
30'-1"
Kaushik Das
4'-4"
AD - 064
21 19'
19'-3"
revi i n n de cripti n
9'-8"
5"
5"
4'-6" 4'-6" 4'-6" 4'-6"
3" 3"
4'-5"
3"
3"
9'-8"
B 5"
4'-8"
3"
2'-6" 2'
3"
2' 2'-6"
3"
2'-6" 2'
3"
2' 2'-6" B PROJECT NAME:
5"
INFINIA MANAGER'S
5'-1"
5'
QUARTER
PROJECT LOCATION:
KESHABPUR, SHITALPUR,
2'-11"
2'-6"
2'-6"
2'
SITAKUNDA.
DRAWING TITLE:
5"
24'-6"
DRAWING STATUS:
FOR APPROVAL
11 12 13 14 drawing number
ap-102(D)
rev- 00
A PROJECT OF
5"
5"
5"
Note:
5"
· This drawing is the property of SILVER BRICKS.
5"
This drawing should not be used without
2'-6"
H H the company's concern.
3'-2"
30
5'-10"
30 · All dimensions are in feet and inches,
5'-1"
5'-1"
1'-1"
29' 29' unless specified.
5'-10"
5"
7'-11"
7'-11"
5" · Measurement should not be taken by
5"
fitting the scale on drawing.
5'-4" 5'-11" 5'-10" 5'-4"
2'-3"
2'-3"
5"
5"
· Any discrepancy during execution should be
5" 5"
5" informed
31 31
1'-7"
2'
1'-3"
1'-3"
1'-8"
1'-8"
5"
client name:
5"
13' 4'-11" 5" 5'-3" 10" 5'-3" 5" 4'-11" 10"
5" 5" INFINIA GROUP
10"
Asaduzzaman Chowdhury
1'-3" 5"
11 12 13 14 C - 040
1'-3"
1'-7"
Sinthia Shobnom
S - 136
5" Blow-Up Detail-5b(for 6TH to 8TH Aniket Chowdhury
6'
6'
3'-11"
3'-11"
29 29 FLOOR) C - 066
Kaushik Das
11 12 13 14 AD - 064
5"
24'-6" revi i n n de cripti n
5"
5"
5"
5" 2'-6" 3'-4" 3'-5" 2'-6" 5" 5" 10"
5" 5" 5"
10" 4'-11" 5'-3" 10" 5'-3" 4'-11"
6'-3" 5" 6'-4"
5"
5"
1'-8"
1'-8"
1'-3"
1'-3"
5" 1'-7"
31
2'
5"
Blow-Up Detail-5a(for 1ST to 8TH 31 5" 5"
2'-3"
2'-3"
5"
5'-4" 5'-10" 5'-11" 5'-4" PROJECT NAME:
FLOOR)
7'-11"
7'-11"
5"
5"
5'-10"
INFINIA MANAGER'S
1'-1"
5"
30 30 QUARTER
5'-10"
29' 29'
30
3'-2"
2'-6"
A A PROJECT LOCATION:
5"
5"
KESHABPUR, SHITALPUR,
SITAKUNDA.
5"
1'-3" 4'-6" 5" 2'-6" 3'-4" 3'-5" 2'-6" 5" 4'-6" 1'-3"
5"
12' 12'-1" DRAWING TITLE:
BLOW-UP DETAILS
11 12 13 14 DRAWING STATUS:
FOR APPROVAL
ap-102(E)
rev- 00
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
146'-6" Blow-Up Detail-7
Blow-Up Detail-5(a) Blow-Up Detail-5(a) Blow-Up Detail-5(a)
LALKHAN BAZAR, CHATTOGRAM.
Blow-Up Detail-5(a)
B
PH: +880-02-41360233,
10" www.silverbricksbd.com.
5" 5" 5" 5" 5" 5" 5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
5"
5"
5"
5"
3'-11"
3'-11"
3'-11"
3'-11"
31 31 31 31 31 Note:
3'-6"
3'-6"
3'-6"
1'-6"
5'-5"
5'-5"
5"
5"
5"
5"
1'-1"
1'-1"
1'-1"
· This drawing is the property of SILVER BRICKS.
30 29 29 29 29 29 29 29 This drawing should not be used without
6'
6'
6'
6'
1'-1"
30 30 30 30 30 30
2'-1"
2'-6"
2'-6"
2'-6"
2'-6"
A A the company's concern.
10" 5" 4'-6" 6'-3" 6'-4" 4'-6" 6' 4'-6" 6'-3" 6'-4" 4'-6" 6' 4'-6" 6'-3" 6'-4" 4'-6" 6' 4'-6" 6'-3" 6'-4" 4'-6" 6' 23'-8"
5" 5" 5" 5" 5" 5" 5" · All dimensions are in feet and inches,
5" 10" 5" 10" 10" 5" 5" 10" 10" 5" 5" 10" 10" 5"
4'
21 unless specified.
5'
5'
5'
· Measurement should not be taken by
fitting the scale on drawing.
6'-3"
6'-3"
6'-3"
21'-9"
21'-9"
21'-9"
5"
24'-8"
35'-6"
11'-8"
21'-9"
32 32 32 32 32 32 32 32 · Any discrepancy during execution should be
5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5"
10" informed
11'-2" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6'
4'
4'
4'
4'-1"
4'-1"
4'-1"
4'
client name:
2'-11"
2'-11"
2'-11"
5"
2'-6"
5"
5"
B B
5"
5"
5"
5"
5" 5" 5" 5" INFINIA GROUP
5" 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 7'-4" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 6'-8" 17'-3"
5" 1'-3" 1'-3" 1'-3"
5'-5"
5" 5" 1'-3" 1'-3" 5" 1'-3" 5" 1'-3" 5"
5'
5'
5'
5'
5'
5'
23 23 23
5'
31
6'-7" 20'
10"
5"
5"
5"
C C
5"
5"
7'-8" 15'-10"
DN
5"
7'-3"
5" Asaduzzaman Chowdhury
1'-6"
89'-10"
Stair-1
12'-2"
07 Blow-Up Detail-3 09
18'-10"
Blow-Up Detail-4 C - 040
D UP D Sinthia Shobnom
18'-10"
18'-10"
18'-10"
18'-10"
24
19'-8"
18'-5"
26 S - 136
E DN E
5"
5" Aniket Chowdhury
15'-10" 20' 64'-6" 6'-5" 20'-4"
C - 066
A 6'-7"
25 09 Stair-2 A
7'-6"
08 UP Kaushik Das
AD - 064
5"
5"
5"
5"
F F
7'-8" 15'-5" 16'-2" 10'-5" 64'-6" 6'-2" 7'-1" 12'-8" 5"
5'-5"
23 5" 23 23 5"
5'-5"
5'
5'
5'
5'
5'
5'
5'
5" 5"
revi i n n de cripti n
10"
5"
5"
5"
5"
5"
5"
5"
2'-6"
G G
2'-6"
2'-6"
2'-6"
2'-6"
7'
7'
7'
7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 24'-6"
5"
4'
4'
4'
4'
5" 5" 5" 10" 5" 5"
10" 5" 5" 5" 10"
10" 10" 10" 10"
4'-6"
4'-6"
4'-6"
4'-6"
4'
4'
4'
32 32 32 32 32 32 32 32
21'-9"
21'-9"
21'-9"
21'-9"
21'-4"
35'-6"
24'-8"
11'-8"
6'-3"
6'-3"
6'-3"
5"
5'
5'
5'
5'
11'-2" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8"
5" 5" 5" 5" 5" 5" 5" 5" 5"
10"
21 PROJECT NAME:
5'-10"
5'-10"
5'-10"
5'-10"
5" 10" 5" 10" 5" 5"
10"
5'
5'
5'
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 10" 4'-6" 6'-3" 6'-4" 4'-6"
5"
5"
5"
5"
5"
5"
5"
5"
INFINIA MANAGER'S
2'-6"
H H
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
QUARTER
3'-7"
3'-7"
3'-7"
30 30 30 30 30 30 30 30
5"
29 29 29 29 29 29 29 29
5"
5"
5"
6'
6'
6'
6'
6'
5'-5"
5'-5"
1'-6"
5"
3'-11"
3'-11"
3'-11"
3'-6"
3'-6"
3'-6"
3'-6"
31 31 31 31 31
31 31 31
5"
5"
5"
5"
PROJECT LOCATION:
5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
10" 5" 5" 5" 5" 5" 5" 5"
KESHABPUR, SHITALPUR,
SITAKUNDA.
Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5
B
146'-6"
Blow-Up Detail-6 DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
01 02 03 04 05 06 07 08 09 10 11 12 13 14
IEB BHABAN (3rd floor),
Blow-Up Detail-7 S.S. KHALED ROAD,
146'-6"
Blow-Up Detail-5(a) Blow-Up Detail-5(a) Blow-Up Detail-5(a) Blow-Up Detail-5(a) LALKHAN BAZAR, CHATTOGRAM.
B
PH: +880-02-41360233,
10" www.silverbricksbd.com.
5" 5" 5" 5" 5" 5" 5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
6'-1" 6'-2" 6'-1" 6'-2"
Note:
5'-5"
5'-5"
1'
1'
1'
1'
· This drawing is the property of SILVER BRICKS.
5" 5"
6'
6'
6'
6'
This drawing should not be used without
3'-2"
30 29 29 30 30 29 29 30 30 29 29 30 30 29 29 30
4'
4'
4'
2'-6"
5'-10"
5'-10"
5'-10"
5'-10"
unless specified.
5'
5'
5'
21
· Measurement should not be taken by
21'-9"
21'-9"
6'-3"
6'-3"
6'-3"
21'-9"
5" fitting the scale on drawing.
5'
5'
5'
5'
24'-8"
35'-6"
11'-8"
21'-9"
32 32 32 32 32 32 32 32
5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5"
· Any discrepancy during execution should be
10" informed
11'-2" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6'
4'-6"
4'-6"
4'-6"
4'-6"
4'
4'
4'
4'-1"
4'-1"
4'-1"
4'
4'
4'
4'
4'
client name:
2'-11"
2'-11"
2'-11"
2'-6"
2'-6"
2'-6"
2'-6"
5"
2'-6"
5"
5"
B B
5"
5"
5"
5"
5"
5"
5"
5"
5" 5" 5" 5"
7'-8"
5"
3'-6" 6'-11" 3'-6"
1'-3"
6' 7'-3" 3'-6" 7'-4" 3'-6"
1'-3"
6' 7'-3" 3'-6" 6'-11" 3'-6"
1'-3"
6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 6'-8" 17'-3" INFINIA GROUP
5'-5"
5" 5" 1'-3" 1'-3" 5" 1'-3" 5" 1'-3" 5"
5'
5'
5'
5'
5'
5'
5'
23 23 23
6'-7" 20'
10"
5"
5"
5"
C C
5"
5"
DN
5"
7'-3"
5"
1'-6" Asaduzzaman Chowdhury
89'-10"
Stair-1
12'-2"
07 Blow-Up Detail-3 09
18'-10"
Blow-Up Detail-4 C - 040
D UP D Sinthia Shobnom
18'-10"
18'-10"
18'-10"
18'-10"
19'-8"
18'-5"
24 S - 136
E 26 DN E
5"
5" Aniket Chowdhury
23'-6" 6'-7" 20' 64'-6" 6'-5" 20'-4"
A Stair-2 A C - 066
25
7'-6"
09 08 UP Kaushik Das
AD - 064
5"
5"
5"
F
5"
F
7'-3" 15'-5" 16'-2" 10'-5" 64'-6" 6'-2" 7'-1" 12'-8" 5"
5'-5"
5'-5"
23 23 23
5'
5'
5'
5'
5'
5'
5'
31 5" 5"
revi i n n de cripti n
10"
5"
5"
5"
5"
5"
5"
5"
2'-6"
G G
2'-6"
2'-6"
2'-6"
2'-6"
7'
7'
7'
7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 24'-6"
5"
4'
4'
4'
4'
5" 5" 5" 10" 5" 5"
10" 5" 5" 5" 10"
10" 10" 10" 10"
4'-6"
4'-6"
4'-6"
4'-6"
4'
4'
4'
32 32 32 32 32 32 32 32
21'-9"
21'-9"
21'-9"
21'-9"
21'-4"
35'-6"
24'-8"
11'-8"
6'-3"
6'-3"
6'-3"
5"
5'
5'
5'
5'
11'-2" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8"
5" 5" 5" 5" 5" 5" 5" 5" 5"
10"
21
5'-10"
5'-10"
5'-10"
5'-10"
5" 10" 5" 10" 5" 5"
10"
PROJECT NAME:
5'
5'
5'
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 10" 4'-6" 6'-3" 6'-4" 4'-6"
5"
5"
5"
5"
5"
5"
5"
5"
INFINIA MANAGER'S
2'-6"
H H
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
1' 3'-7"
1' 3'-7"
1' 3'-7"
30 30 30 30 30 30 30 30 QUARTER
29 29 29 29 29 29 29 29
5"
5"
5"
6'
6'
6'
6'
6'
5"
5"
5'-5"
5'-5"
1'
1'
1'
1'
1'
PROJECT LOCATION:
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
10" 5" 5" 5" 5" 5" 5" 5" KESHABPUR, SHITALPUR,
SITAKUNDA.
Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5
B
146'-6"
Blow-Up Detail-6 DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
01 02 03 04 05 06 07 08 09 10 11 12 13 14
B
PH: +880-02-41360233,
10" www.silverbricksbd.com.
5" 5" 5" 5" 5" 5" 5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
Note:
5'-5"
5'-5"
1'
1'
1'
1'
· This drawing is the property of SILVER BRICKS.
5" 5"
6'
6'
6'
6'
3'-2" 30 29 29 29 29 30 30 29 29 30 29 29 This drawing should not be used without
30 30 30 30
4'
4'
4'
2'-6"
5'-10"
5'-10"
5'-10"
5'-10"
4'
unless specified.
5'
5'
5'
21
· Measurement should not be taken by
6'-3"
6'-3"
6'-3"
21'-9"
21'-9"
21'-9"
5" fitting the scale on drawing.
5'
5'
5'
5'
24'-8"
35'-6"
11'-8"
21'-9"
33 33 33 33 33 33 33 33
5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" · Any discrepancy during execution should be
10"
11'-2" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' informed
4'-6"
4'-6"
4'-6"
4'-6"
4'
4'
4'
4'-1"
4'-1"
4'-1"
4'
4'
4'
4'
4'
client name:
2'-11"
2'-11"
2'-11"
2'-6"
2'-6"
2'-6"
2'-6"
5"
2'-6"
5"
5"
B 5" B
5"
5"
5"
5"
5"
5"
5"
5" 5" 5" 5"
5" 7'-3"
5"
3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 7'-4" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 6'-8" 17'-3" INFINIA GROUP
5"5'
5'-5"
5" 5" 1'-3" 1'-3" 5" 1'-3" 5" 1'-3" 5"
5'
5'
5'
5'
5'
5'
31 23 23 23
6'-7" 20'
10"
5"
5"
C C
5"
5"
7'-3"
5"
89'-10"
Stair-1 25 Asaduzzaman Chowdhury
12'-2"
07 Blow-Up Detail-3
18'-10"
18'-10"
18'-10"
18'-10"
18'-10"
19'-8"
19'-8"
18'-10"
E 26 DN E S - 136
5"
15'-10"
5" 09 Aniket Chowdhury
6'-7" 20' 64'-6" 6'-5" 20'-4"
A 25
Stair-2 A C - 066
7'-6"
08 UP Kaushik Das
5"
AD - 064
5"
5"
F
5"
F
7'-8" 15'-5" 16'-2" 10'-5" 64'-6" 6'-2" 7'-1" 13'-1"
5'-5"
23 5" 23 23 5"
5'
5'
5'
5'
5'
5'
5'
5" 5"
5'
10"
5"
5"
5"
revi i n n de cripti n
5"
5"
5"
5"
2'-6"
G G
2'-6"
2'-6"
2'-6"
2'-6"
7'
7'
7'
7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 24'-6"
5"
4'
4'
4'
4'
5" 5" 5" 10" 5" 5"
10" 5" 5" 5" 10"
10" 10" 10" 10"
4'-6"
4'-6"
4'-6"
4'-6"
4'
4'
4'
33 33 33 33 33 33 33 33
21'-9"
21'-9"
21'-9"
21'-9"
21'-4"
35'-6"
24'-8"
11'-8"
6'-3"
6'-3"
6'-3"
5"
5'
5'
5'
5'
11'-2" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8"
5" 5" 5" 5" 5" 5" 5" 5" 5"
10"
21
5'-10"
5'-10"
5'-10"
5'-10"
5" 10" 5" 10" 5" 5" PROJECT NAME:
10"
5'
5'
5'
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 10" 4'-6" 6'-3" 6'-4" 4'-6"
5"
5"
5"
5"
5"
5"
5"
5"
INFINIA MANAGER'S
2'-6"
H H
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
1' 3'-7"
1' 3'-7"
1' 3'-7"
30 30 30 30 30 30 30 30
29 29 29 29 29 29 29 29 QUARTER
5"
5"
5"
6'
6'
6'
6'
6'
5"
5"
1'
1'
1'
1'
1'
5'-5"
5'-5"
PROJECT LOCATION:
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
10" 5" 5" 5" 5" 5" 5" 5" KESHABPUR, SHITALPUR,
SITAKUNDA.
Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5
B
146'-6"
Blow-Up Detail-6 DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
01 02 03 04 05 06 07 08 09 10 11 12 13 14
B
PH: +880-02-41360233,
10" www.silverbricksbd.com.
5" 5" 5" 5" 5" 5" 5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
Note:
5'-5"
5'-5"
1'
1'
1'
1'
· This drawing is the property of SILVER BRICKS.
5" 5"
6'
6'
6'
6'
3'-2"
30 29 29 30 30 29 29 30 30 29 29 30 30 29 29 30 This drawing should not be used without
4'
4'
4'
2'-6"
5'-10"
5'-10"
5'-10"
5'-10"
4'
unless specified.
5'
5'
5'
21
· Measurement should not be taken by
6'-3"
6'-3"
6'-3"
21'-9"
21'-9"
21'-9"
5" fitting the scale on drawing.
5'
5'
5'
5'
24'-8"
35'-6"
11'-8"
21'-9"
33 33 33 33 33 33 33 33
5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" · Any discrepancy during execution should be
10"
11'-2" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' informed
4'-6"
4'-6"
4'-6"
4'-6"
4'
4'
4'
4'-1"
4'-1"
4'-1"
4'
4'
4'
4'
4'
client name:
2'-11"
2'-11"
2'-11"
2'-6"
2'-6"
2'-6"
2'-6"
5"
2'-6"
5"
5"
B B
5"
5"
5"
5"
5"
5"
5"
5"
5" 5" 5" 5"
7'-8"
5"
3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 7'-4" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 6'-8" 17'-3" INFINIA GROUP
5"5'
5'-5"
5" 5" 1'-3" 1'-3" 5" 1'-3" 5" 1'-3" 5"
5'
5'
5'
5'
5'
5'
23 23 23
6'-7" 20'
10"
5"
5"
C C
5"
5"
7'-3"
5"
89'-10"
Stair-1 25 Asaduzzaman Chowdhury
12'-2"
07 Blow-Up Detail-3
18'-10"
18'-10"
18'-10"
18'-10"
18'-10"
19'-8"
19'-8"
18'-10"
E 26 DN E S - 136
5"
15'-10"
5" Aniket Chowdhury
6'-7" 20' 64'-6" 6'-5" 20'-4"
A 25
Stair-2 A C - 066
7'-6"
09 08 UP Kaushik Das
5"
AD - 064
5"
5"
F
5"
F
7'-3" 15'-5" 16'-2" 10'-5" 64'-6" 6'-2" 7'-1" 13'-1"
5"
5'-5"
23 5" 23 22
23 5"
5'
5'
5'
5'
5'
5'
5'
31 5" 5"
5'
10"
5"
5"
5"
revi i n n de cripti n
5"
5"
5"
5"
2'-6"
G G
2'-6"
2'-6"
2'-6"
2'-6"
7'
7'
7'
7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 7'-3" 3'-6" 6'-11" 3'-6" 6' 24'-6"
5"
4'
4'
4'
4'
5" 5" 5" 10" 5" 5"
10" 5" 5" 5" 10"
10" 10" 10" 10"
4'-6"
4'-6"
4'-6"
4'-6"
4'
4'
4'
33 33 33 33 33 33 33 33
21'-9"
21'-9"
21'-9"
21'-9"
21'-4"
35'-6"
24'-8"
11'-8"
6'-3"
6'-3"
6'-3"
5"
5'
5'
5'
5'
11'-2" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8" 6' 11'-7" 11'-8"
5" 5" 5" 5" 5" 5" 5" 5" 5"
10"
21
5'-10"
5'-10"
5'-10"
5'-10"
5" 10" 5" 10" 5" 5" PROJECT NAME:
10"
5'
5'
5'
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 10" 4'-6" 6'-3" 6'-4" 4'-6"
5"
5"
5"
5"
5"
5"
5"
5"
INFINIA MANAGER'S
2'-6"
H H
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
1' 3'-7"
1' 3'-7"
1' 3'-7"
30 30 30 30 30 30 30 30
29 29 29 29 29 29 29 29 QUARTER
5"
5"
5"
6'
6'
6'
6'
6'
5"
5"
1'
1'
1'
1'
1'
5'-5"
5'-5"
PROJECT LOCATION:
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
10" 5" 5" 5" 5" 5" 5" 5" KESHABPUR, SHITALPUR,
SITAKUNDA.
Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5
B
146'-6"
Blow-Up Detail-6 DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
01 02 03 04 05 06 07 08 09 10 11 12 13 14
B
PH: +880-02-41360233,
5" 5" 5" www.silverbricksbd.com.
10" 5" 5" 5" 5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
5' 7'-11"
7'-11"
31 31 Note:
5'-5"
7'-11"
5"
5"
29(a)
1'
1'
1'
3'-2" 1'
1'
3'-2" 1'
1'
3'-2" 1'
29 29 29 29(a) · This drawing is the property of SILVER BRICKS.
6'
29 29 29 29 29
5"
5"
5"
6'
6'
6'
3'-2"
3'-2"
30 30 30 30 30 30 30 30 30 30 This drawing should not be used without
4'
4'
4'
2'-6"
A A
5"
the company's concern.
5"
5"
5"
5"
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 11'-8" 11'-2"
5" · All dimensions are in feet and inches,
5'-10"
5'-10"
5'-10"
5'-10"
4'
5'
5'
5'
10" 10" 10" 10"
5'
5" 5" 5" 5"
10'-10"
10'-10"
10'-10"
unless specified.
10'-10"
28 28 28 28 28 28 28 28 28 28
6'-11"4' 5'-10"
10"
5" 5"
30'-1"
30'-1"
5'-10"
5'-10"
5'-10"
10"
10'-10"
5'
5'
5'
5'
5"
9'-8"
· Any discrepancy during execution should be
15'-8"
5"
5"
5"
5"
5"
5"
5"
informed
5"
4'-1"
4'-1"
4'-1"
4'-1"
4'
4'
4'
10'-6"
10'-6"
10'-6"
27 27 27 27 27 27 27 27 27 27
10" 10" 10"
10'-1"
10'-1"
10" 10" 10" 10"
5" 10" 5" 5" 10" 5" 5" 10" 5"
10" 10" 10"10" 5" 5"
4'
4'
4'
4'
5" 10"
7'-6"
5" 10" 5" 10" 5" 10" 5"
7'-3" 3'-6" 6'-6" 3'-6" 6' 3'-6" 6'-5" 6'-6" 3'-6" 6' 3'-6" 6'-5" 6'-6" 3'-6" 6' 3'-6" 6'-5" 6'-6" 3'-6" 3'-6" 6'-6" 3'-6" 7'-3"
5"
7'
7'
7'
2'-6"
2'-6"
2'-6"
2'-6"
client name:
5"
2'-6"
5"
B B
5"
10"
10"
5'
5'
5'
5'
5'
10" 5" 23 23 23
6'-7" 20'
5"
5"
C C
5"
14'-10" 10'-5"
89'-10"
Blow-Up Detail-3
89'-10"
07 Blow-Up Detail-4 09
24'-3"
24 C - 040
D UP
D
18'-10"
18'-10"
18'-10"
Sinthia Shobnom
29'-8"
19'-8"
19'-8"
E 26 DN E S - 136
5"
5" Aniket Chowdhury
23'-6" 6'-7" 20' 64'-6" 6'-5" 20'-4"
A 25
Stair-2 A C - 066
7'-1"
08
09 UP
Kaushik Das
5"
AD - 064
5"
5"
5"
F
5"
F
7'-8" 15'-5" 16'-2" 10'-5" 64'-6" 6'-2" 20'-2" 5"
23
4'-7"
23 5" 23
5'
5'
5'
5'
5'
31 5" 5" 23
5'
10"
10"
5"
revi i n n de cripti n
5"
5"
5"
5"
5"
5"
2'-6"
2'-6"
G G
2'-6"
2'-6"
2'-6"
2'-6"
5"
7'
7'
7'
7'-3" 3'-6" 6'-6" 3'-6" 6' 3'-6" 6'-5" 6'-6" 3'-6" 6' 3'-6" 6'-5" 6'-6" 3'-6" 6' 3'-6" 6'-5" 10' 6' 3'-6" 6'-6" 3'-6" 7'-3"
6'-11"
5" 10" 10" 10"
4'
5" 5" 10" 10" 5" 10" 5" 5" 10" 10" 5" 10"10" 5" 5"
4'
4'
4'
4'
10'-1"
10'-1"
5'
5" 5" 5" 5"
10" 10" 10" 5" 10"
10" 10" 10" 10"
10'-6"
10'-6"
10'-6"
27 27 27 27 27 27 27 27
4'-1"
4'-1"
4'-1"
4'-1"
4'
4'
4'
4'
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
35'-6"
11'-8"
9'-8"
10'-10"
5'-10"
5'-10"
5'-10"
5'-10"
5"
5'
5'
5'
5'
30'-1"
7'-10" 3'-4" 3'-4" 8'-4" 6' 8'-3" 3'-4" 3'-4" 8'-4" 6' 8'-3" 3'-4" 3'-4" 8'-4" 6' 8'-3" 3'-4" 3'-4" 8'-4" 8'-4" 3'-4" 3'-4" 7'-10"
10'-10"
5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 10"
28 28 28 28 28 28 28 28
10'-10"
10'-10"
10'-10"
10"
5'-10"
5'-10"
5'-10"
5'-10"
5" 5" 5" 5"
10" 10" 10" 10" PROJECT NAME:
5'
5'
5'
5'
5'
5"
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 11'-8" 11'-2"
5"
5"
5"
5"
5"
INFINIA MANAGER'S
2'-6"
H H
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
4'
4'
4'
30 29 29 30 30 29 29 30 30 29 29 30 30 29 29 30 30 30 QUARTER
5"
5"
5"
5"
6'
6'
6'
6'
7'-11"
7'-11"
29(a) 29(a)
7'-11"
1'
1'
1'
1'
1'
1'
1'
1'
5'-5"
5"
PROJECT LOCATION:
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
10" 5" 5" 5" 5" 5" 5" 5" KESHABPUR, SHITALPUR,
SITAKUNDA.
Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5
B
146'-6"
Blow-Up Detail-5(b)
DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
(18'-8'' X 10'-0'')
No.
28.
FUNCTIONS DIMENSION
Bed Room(bachelor room (11'-2"x10'-10")
manager to DGM)
DRAWING STATUS:
FOR APPROVAL
09. Passenger lift (8'-7'' X 6'-11'') 29. Toilet (5'-10'' X 5'-2'')
22. Corridor-1 (122'-2'' X 5'-0'') 29(a) Toilet (5'-10'' X 7'-1'')
23. Corridor-2 (120'-2'' X 5'-0'') 30. Verandah (5'-4'' X 3'-2'')
24. Corridor-3 (6'-2'' X 19'-8'') 31. Green Box
25. Lift Lobby (9'-7'' X 8'-0'') drawing number
26. Corridor-4 (6'-2"x18'-10")
27. Living+Dininng(bachelor
room manager to DGM)
(11'-8"x10'-6")
ap - 107
rev- 0 0
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
B
146'-6" PH: +880-02-41360233,
5" 5" www.silverbricksbd.com.
10" 5" 5" 5" 5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
1' 2'-11"
3'-11"
31 31 Note:
7'-11"
7'-11"
7'-6"
3'-2" 1'
1'
3'-2" 1'
1'
3'-2" 1'
1'
3'-2" 1'
· This drawing is the property of SILVER BRICKS.
5'-7"
5'-7"
5'-7"
5'-7"
5"
29 29 29 29 29 29 29 29 29' 29'
5"
5"
5"
5"
6'
6'
6'
5" 3'-2"
30 30 30 30 30 30 30 30 30 This drawing should not be used without
4'
4'
4'
4'
A 30 A
5"
the company's concern.
5"
5"
5"
5"
5"
5"
5"
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6"
10" 5" 5" 5" 10" 5" 5" 10" · All dimensions are in feet and inches,
4'
5'-10"
5" 10" 5" 10"
5'
5'
5'
10" 10" 10"
5'-10"
5'-10"
5'-10"
5'
5'
5" 5" unless specified.
10'-10"
10'-10"
10'-10"
10'-10"
10'-10"
35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b)
30'-1"
30'-1"
· Measurement should not be taken by
5'-10"
5'-10"
5'-10"
5'-10"
5" 5" 5" 5" 5" 5" fitting the scale on drawing.
5'
5'
5'
5'
10" 5" 5" 5" 5" 5"
11'-8"
7'-10" 3'-4" 3'-4" 8'-4" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11"
5"
5"
5"
5"
5"
1'-3" 5"
5"
5"
1'-3" 5"
· Any discrepancy during execution should be
5"
5"
5"
5"
5" 1'-6"
5" 1'-6"
1'-3"
5" 1'-6"
3'-5"
informed
5" 1'-6"
5" 1'-6"
4'-1"
4'-1"
4'-1"
4'-1"
29" 29" 29" 29" 29"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6" 3'-7" 2'-9"
3'-2"
2'-9"
5"
5"
5"
35(a)
2'-6" 3'-11"
35(a) 35(a) 35(a) 35(a)
2'-6" 3'-7"
2'-6" 3'-7"
2'-6" 3'-7"
3'
3'
3'
3'
3'
5'
4'
4'
4'
4'
34 34 34 34
34
2'-8"
3'-1"
3'-1"
3'-1"
10"
3'-6"
client name:
2'-6"
2'-6"
2'-6"
1'-8"
2'-6"
B B
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
10"
10"
5"
5"
1'-3" 5" 5" 1'-3" 1'-3" 5"
6'-5" 3' 9" 3'-6" 7'-1" 6'
1'-3"
7'-1" 10'-7" 3'-6" 6'
1'-3"
5"
3'-6" 10'-7"
5"
7'-1"
1'-3"
6' 7'-1" 10'-7" 3'-6"
5"
6' 7'-1" 3'-6" 7'-6" 3'-1" INFINIA GROUP
5'
5'
5'
5'
5'
5'
5" 5" 5" 23 1'-3" 1'-3"
1'-3" 23 1'-3" 23 5"
5"
5"
5"
5"
C C
7'-8" 10' 12' DN 20' 64'-6" 16'-4" 10'-5" ARC ITECT S NAME
5" 5" 5"
Stair-1 25 Asaduzzaman Chowdhury
12'-2"
07 Blow-Up Detail-3
Blow-Up Detail-4 09 C - 040
D UP
D
89'-10"
89'-10"
18'-10"
18'-10"
18'-10"
18'-10"
29'-8"
29'-8"
19'-8"
E 26 DN E S - 136
Aniket Chowdhury
25
A 7'-8"
5"
10'
5"
10'-5"
Stair-2 A C - 066
12' 9'-7" 08
7'-6"
UP Kaushik Das
09
AD - 064
3"
5"
5"
F
5"
F
23
5'
23
5'
5'
23
5'
5'-2"
1'-3" 5" 5" 1'-3" 1'-3" 1'-3"
5" 5" 1'-3" 1'-3" 5"
5'
5'
6'-5" 3' 9" 3'-6" 7'-1" 6' 8'-4" 10'-7" 3'-6" 6' 3'-6" 10'-7" 7'-1" 6' 7'-1" 10'-7" 3'-5" 6' 7'-1" 3'-6" 7'-6" 3'-1"
5" 5" 6" 1'-3" 1'-3" 5"
10"
10"
3'-6" 5"
3'-6" 5"
3'-6" 5"
5"
5"
5"
5"
5"
5"
5"
5"
2'-6"
G G
2'-6"
2'-6"
2'-6"
3'-7" 2'-6"
2'-6"
3'-7" 2'-6"
2'-6"
3'-7" 2'-6"
3'-6"
2'-1"
2'-8"
34 34 34
34 34
3'-7"
4'
35(a)
4'
4'
4'
4'
4'
3'
3'
3'
3'
3'
35(a) 35(a)
5"
5"
5"
5"
5"
35(a) 35(a)
5" 1'-3"2'-9" 5"
2'-6"
2'-6"
2'-6"
2'-6"
4'-1"
4'-1"
4'-1"
4'-1"
4'-1"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
29" 29" 29" 29" 29"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
11'-8"
5"
7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3"
5'-10"
5'-10"
5'-10"
5'-10"
5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5"
5'
5'
5'
5'
5'
30'-1"
30'-1"
35(b)
10'-10"
10'-10"
10'-10"
10'-10"
10'-10"
35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b)
35(b)
5'-10"
5'-10"
5'-10"
5'-10"
5'-10"
5" 10" 5" 10" 5" 10" 5" 10" PROJECT NAME:
5'
5'
5'
5'
5" 5" 5" 10" 5" 5" 10" 5" 5" 10" 5" 5" 10" 5" 5" 10"
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6"
10"
5"
5"
5"
5"
5"
5"
INFINIA MANAGER'S
5"
5"
5"
5"
H H
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
4'
4'
4'
4'
30 29 30 30 29 30 30 29 30 30 30 30 29' 30 QUARTER
5'-7"
5'-7"
5'-7"
5'-7"
29 29 29 29 29 29'
5"
6'
6'
6'
6'
7'-11"
7'-11"
5"
5"
5"
5"
7'-6"
2'-11" 1'
1'
1'
1'
1'
1'
1'
1'
3'-11"
31 31
PROJECT LOCATION:
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
10" 5" 5" 5" 5" 5" 5" 5" KESHABPUR, SHITALPUR,
24'-6" 24'-6" 24'-6" 24'-6" 24'-6"
SITAKUNDA.
Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5
B
146'-6"
Blow-Up Detail-5(b)
DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
(18'-8'' X 10'-0'')
No.
29"
30.
FUNCTIONS
Toilet
Verandah
DIMENSION
(7'-11'' X 4'-0')
(5'-4'' X 3'-2'')
DRAWING STATUS:
FOR APPROVAL
(8'-7'' X 6'-11'') 31. Green Box
09. Passenger lift
(122'-2'' X 5'-0'') 34. Kitchen (7'-11'' X 6'-1'')
22. Corridor-1
35(a). Living+Dininng(Family (15'-4"x10'-6")
23. Corridor-2 (120'-2'' X 5'-0'')
room manager to DGM)
24(a). Corridor-3 (12'-'' X 18'-10'') Bed Room(bachelor room
35(b). (11'-7"x10'-10") drawing number
25. Lift Lobby (9'-7'' X 8'-0'') manager to DGM)
26. Corridor-4 (6'-2"x18'-10")
29.
29'
Toilet
Toilet
(5'-10'' X 5'-2'')
(5'-10'' X 7'-1'')
ap - 108
rev- 0 0
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
B
146'-6" PH: +880-02-41360233,
5" 5" www.silverbricksbd.com.
10" 5" 5" 5" 5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
1' 2'-11"
3'-11"
31 31 Note:
7'-11"
7'-11"
7'-6"
3'-2" 1'
1'
3'-2" 1'
1'
3'-2" 1'
1'
3'-2" 1'
· This drawing is the property of SILVER BRICKS.
5'-7"
5'-7"
5'-7"
5'-7"
5"
29 29 29 29 29 29 29 29 29' 29'
5"
5"
5"
5"
6'
6'
6'
5" 3'-2"
30 30 30 30 30 30 30 30 This drawing should not be used without
4'
4'
4'
4'
A 30 A
5"
5"
the company's concern.
5"
5"
5"
5"
5"
5"
5"
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6"
10" 5" 5" 5" 10" 5" 5" 10" · All dimensions are in feet and inches,
5'-10"
4'
5'
5'
5'
10" 10" 10"
5'-10"
5'-10"
5'-10"
5'
5'
5" 5" unless specified.
10'-10"
10'-10"
10'-10"
10'-10"
10'-10"
35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b)
30'-1"
30'-1"
· Measurement should not be taken by
5'-10"
5'-10"
5'-10"
5'-10"
5" 5" 5" 5" 5" 5" fitting the scale on drawing.
5'
5'
5'
5'
10" 5" 5" 5" 5" 5"
11'-8"
7'-10" 3'-4" 3'-4" 8'-4" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11"
5"
5"
5"
5"
5"
5"
1'-3" 5"
5"
1'-3" 5"
· Any discrepancy during execution should be
5"
5"
5"
5"
5" 1'-6"
5" 1'-6"
1'-3"
5" 1'-6"
3'-5"
informed
5" 1'-6"
5" 1'-6"
4'-1"
4'-1"
4'-1"
4'-1"
29" 29" 29" 29" 29"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6" 3'-7" 2'-9"
5"
5"
5"
35(a)
2'-6" 3'-11"
35(a) 35(a) 35(a) 35(a)
2'-6" 3'-7"
2'-6" 3'-7"
3'
3'
3'
3'
3'
5'
4'
4'
4'
4'
34 34 34 34 34
2'-8"
3'-1"
3'-1"
3'-1"
10"
3'-6"
client name:
2'-6"
2'-6"
2'-6"
1'-8"
2'-6"
B B
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
10"
5"
5"
10"
5" 1'-3"
9'-10" 9"
5" 3'-6"
1'-3"
6'
1'-3"
7'-1"
5"
10'-7" 3'-6" 6'
1'-3"
3'-6" 10'-7" 7'-1"
1'-3"
6' 7'-1" 10'-7" 3'-6"
5"
6'
24 1'-3" 7'-1" 3'-6" 7'-6"
5"
3'-1" INFINIA GROUP
5" 5"
5'
5'
5'
5'
5'
1'-3" 5"23 23 1'-3" 23
5" 1'-3" 1'-3"
5"
5"
5"
C C
19' DN 20' 64'-6" 16'-4" 10'-5" ARC ITECT S NAME
5"
5"
Stair-1 2525 Asaduzzaman Chowdhury
12'-2"
07 Blow-Up Detail-3
Blow-Up Detail-4 09 C - 040
D UP
D
89'-10"
89'-10"
18'-10"
18'-10"
18'-10"
29'-8"
29'-8"
29'-8"
19'-8"
E 26 DN E S - 136
Aniket Chowdhury
A 5"
19' 9'-7"
25 10'-5"
Stair-2 A C - 066
08
7'-6"
UP Kaushik Das
09
AD - 064
3"
5"
5"
F F
5'
5'
5'
5'
5'-2"
5" 5" 1'-3" 1'-3" 1'-3"
5" 23 5" 1'-3" 1'-3" 5"
5'
11'-1" 8" 3'-6" 23 7'-1" 6' 8'-4" 10'-7" 3'-6" 6' 3'-6" 10'-7" 7'-1" 6' 7'-1" 23 10'-7" 3'-5" 6' 7'-1" 3'-6" 7'-6" 3'-1"
5" 6" 1'-3" 1'-3" 5"
10"
10"
3'-6" 5"
3'-6" 5"
3'-6" 5"
5"
5"
5"
5"
5"
5"
5"
5"
2'-6"
G G
2'-6"
2'-6"
2'-6"
3'-7" 2'-6"
2'-6"
3'-7" 2'-6"
2'-6"
3'-7" 2'-6"
3'-6"
2'-1"
2'-8"
34 34 34
34 34
3'-7"
4'
35(a)
4'
4'
4'
4'
4'
3'
3'
3'
3'
3'
35(a) 35(a)
5"
5"
5"
5"
5"
35(a) 35(a)
5" 1'-3"2'-9" 5"
2'-6"
2'-6"
2'-6"
2'-6"
4'-1"
4'-1"
4'-1"
4'-1"
4'-1"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
29" 29" 29" 29" 29"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
11'-8"
5"
7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3"
5'-10"
5'-10"
5'-10"
5'-10"
5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5"
5'
5'
5'
5'
5'
30'-1"
30'-1"
35(b)
10'-10"
10'-10"
10'-10"
10'-10"
10'-10"
35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b)
5'-10"
5'-10"
5'-10"
5'-10"
5'-10"
5" 10" 5" 10" 5" 10" 5" 10" PROJECT NAME:
5'
5'
5'
5'
5" 5" 5" 10" 5" 5" 10" 5" 5" 10" 5" 5" 10" 5" 5" 10"
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6"
10"
5"
5"
5"
5"
5"
5"
INFINIA MANAGER'S
5"
5"
5"
5"
H H
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
4'
4'
4'
4'
30 29 30 30 29 30 30 29 30 30 30 30 29' 30 QUARTER
5'-7"
29 29 29 29 29 29'
5'-7"
5'-7"
5'-7"
5"
6'
6'
6'
6'
6'
7'-11"
7'-11"
5"
5"
5"
5"
7'-6"
2'-11" 1'
1'
1'
1'
1'
1'
1'
1'
3'-11"
31 31
PROJECT LOCATION:
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
10" 5" 5" 5" 5" 5" 5" 5" KESHABPUR, SHITALPUR,
24'-6" 24'-6" 24'-6" 24'-6" 24'-6"
SITAKUNDA.
Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5 Blow-Up Detail-5
B
146'-6"
Blow-Up Detail-5(b)
DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
(18'-8'' X 10'-0'')
No.
29"
30.
FUNCTIONS
Toilet
Verandah
DIMENSION
(7'-11'' X 4'-0')
(5'-4'' X 3'-2'')
DRAWING STATUS:
FOR APPROVAL
(8'-7'' X 6'-11'') 31. Green Box
09. Passenger lift
(122'-2'' X 5'-0'') 34. Kitchen (7'-11'' X 6'-1'')
22. Corridor-1
35(a). Living+Dininng(Family (15'-4"x10'-6")
23. Corridor-2 (120'-2'' X 5'-0'')
room manager to DGM)
24(b). Corridor-3 (19-0'' X 29'-8'') Bed Room(bachelor room
35(b). (11'-7"x10'-10") drawing number
25. Lift Lobby (9'-7'' X 8'-0'') manager to DGM)
26. Corridor-4 (6'-2"x18'-10")
29.
29'
Toilet
Toilet
(5'-10'' X 5'-2'')
(5'-10'' X 7'-1'')
ap - 1 09
rev- 0 0
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
Blow-Up Detail-5(d) Blow-Up Detail-5(d) Blow-Up Detail-5(d) Blow-Up Detail-5(d) Blow-Up Detail-5(c') LALKHAN BAZAR, CHATTOGRAM.
B
146'-6" PH: +880-02-41360233,
5" 5" www.silverbricksbd.com.
10" 5" 5" 5" 5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
5"
5"
5"
5"
5"
5"
5"
3'-11"
3'-11"
3'-11"
3'-11"
31 Note:
3'-6"
3'-6"
3'-6"
3'-6"
3'-6"
3'-6"
3'-6"
31 31
7'-11"
7'-11"
7'-6"
7'-6"
7'-6"
7'-6"
7'-6"
5"
5"
31 31 31 31 · This drawing is the property of SILVER BRICKS.
29' 29' 29' 29'
5"
29' 29' 29' 29' 29' 29'
5"
5"
5"
5"
This drawing should not be used without
5" 3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
30 30 30 30 30 30 30 30
4'
4'
4'
4'
A 30 30 A the company's concern.
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" · All dimensions are in feet and inches,
10" 5" 5" 5" 5" 5" 5" 10" 5" 5" 10"
5'-10"
4'
5'
5'
5'
10" 10" 10"
5'-10"
5'-10"
5'-10"
5'
5'
5" 5" unless specified.
10'-10"
10'-10"
10'-10"
10'-10"
10'-10"
35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b)
· Measurement should not be taken by
30'-1"
30'-1"
5'-10"
5'-10"
5'-10"
5'-10"
5" 5" 5"
fitting the scale on drawing.
5" 5" 5"
5'
5'
5'
5'
10" 5" 5" 5" 5" 5"
11'-8"
7'-10" 3'-4" 3'-4" 8'-4" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11"
5"
5"
5"
5"
5"
1'-3" 5"
2'-9"1'-3" 5"
· Any discrepancy during execution should be
5"
1'-3" 5"
5"
5"
5"
5"
informed
5" 1'-6"
5" 1'-6"
5" 1'-6"
5" 1'-6"
3'-5"
5" 1'-6"
4'-1"
4'-1"
4'-1"
4'-1"
29" 29" 29" 29" 29"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
3'-2"
5"
5"
35(a)
2'-6" 3'-11"
35(a) 35(a) 35(a) 35(a)
2'-6" 3'-7"
2'-6" 3'-7"
2'-6" 3'-7"
3'
3'
3'
3'
3'
5'
4'
4'
4'
4'
34 34 34 34 34
client name:
2'-8"
3'-1"
3'-1"
3'-1"
10"
3'-6"
2'-6"
2'-6"
2'-6"
1'-8"
2'-6"
B B
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
10"
5" INFINIA GROUP
5"
5"
10"
5'
5'
5'
5'
5'
1'-3" 5" 1'-3" 5" 1'-3" 1'-3"
5"
5"
5"
C C
19' DN 20' 64'-6" 16'-4" 10'-5" ARC ITECT S NAME
5"
5"
Stair-1 Asaduzzaman Chowdhury
12'-2"
07 Blow-Up Detail-3
Blow-Up Detail-4 09 C - 040
D UP
D Sinthia Shobnom
89'-10"
89'-10"
18'-10"
18'-10"
18'-10"
29'-8"
29'-8"
19'-8"
S - 136
E DN E
Aniket Chowdhury
A 5" Stair-2 A C - 066
19' 9'-7" 10'-5"
08 Kaushik Das
7'-6"
UP
09
AD - 064
3"
5"
5"
F F
5'
5'
5'
5'
5'-2"
5" 5" 1'-3" 1'-3" 5" 5" 1'-3" 1'-3" 5"
5'
11'-1" 8" 3'-6" 7'-1" 6' 8'-4" 10'-7" 3'-6" 3'-6" 10'-7" 7'-1" 7'-1" 10'-7" 3'-5" 6' 7'-1" 3'-6" 7'-6" 3'-1"
5" 6" 1'-3" 1'-3" 5" revi i n n de cripti n
10"
10"
3'-6" 5"
3'-6" 5"
3'-6" 5"
5"
5"
5"
5"
5"
5"
5"
5"
2'-6"
G G
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
3'-7" 2'-6"
2'-6"
2'-6"
3'-6"
2'-1"
2'-8"
34 34 34
34 34
3'-7"
3'-7"
3'-7"
4'
35(a)
4'
4'
4'
4'
4'
3'
3'
3'
3'
3'
35(a) 35(a)
5"
5"
5"
5"
5"
35(a) 35(a)
2'-6"
2'-6"
2'-6"
4'-1"
4'-1"
4'-1"
4'-1"
4'-1"
1'-6"
1'-6"
1'-6"
1'-6"
1'-6"
29" 29" 29" 29" 29"
5"
5"
5"
5"
5"
5"
5"
5"
5"
5"
11'-8"
5"
7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3" 7'-11" 3'-4" 3'-4" 8'-3"
5'-10"
5'-10"
5'-10"
5'-10"
5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5" 5"
5'
5'
5'
5'
5'
30'-1"
30'-1"
10'-10"
10'-10"
10'-10"
10'-10"
10'-10"
35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b) 35(b)
5'-10"
5'-10"
5'-10"
5'-10"
5'-10"
5" 10" 5" 10" 5" 10" 5" 10" PROJECT NAME:
5'
5'
5'
5'
5" 5" 5" 10" 5" 5" 10" 5" 5" 10" 5" 5" 10" 5" 5" 10"
4'
4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6" 4'-6" 6'-3" 6'-4" 4'-6"
10"
5"
5"
5"
5"
5"
5"
5"
INFINIA MANAGER'S
5"
5"
5"
H H
3'-7"
3'-2"
3'-2"
3'-2"
3'-2"
3'-2"
30 QUARTER
4'
4'
4'
30 29' 29' 30 30 29' 29' 30 30 29' 29' 30 30 29' 29' 30 30 29' 29'
5"
7'-11"
7'-11"
5"
5"
5"
5"
5"
7'-6"
7'-6"
7'-6"
7'-6"
7'-6"
31
3'-11"
3'-11"
3'-11"
3'-11"
3'-6"
3'-6"
3'-6"
3'-6"
3'-6"
31 31 31 31 31 31
5"
5"
5"
PROJECT LOCATION:
5"
5"
4'-11" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 5'-4" 13' 5'-4" 6' 24'-6"
10" 5" 5" 5" 5" 5" 5" 5"
KESHABPUR, SHITALPUR,
24'-6" 24'-6" 24'-6" 24'-6" 24'-6" SITAKUNDA.
B
Blow-Up Detail-5(d) Blow-Up Detail-5(d) Blow-Up Detail-5(d) Blow-Up Detail-5(d) Blow-Up Detail-5(b')
146'-6"
DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends Legends
(18'-8'' X 10'-0'')
No.
29"
30.
FUNCTIONS
Toilet
Verandah
DIMENSION
(7'-11'' X 4'-0')
(5'-4'' X 3'-2'')
DRAWING STATUS:
FOR APPROVAL
(8'-7'' X 6'-11'') 31. Green Box
09. Passenger lift
(122'-2'' X 5'-0'') 34. Kitchen (7'-11'' X 6'-1'')
22. Corridor-1
35(a). Living+Dininng(Family (15'-4"x10'-6")
23. Corridor-2 (120'-2'' X 5'-0'')
room manager to DGM)
24(b). Corridor-3 (19-0'' X 29'-8'')
35(b). Bed Room(bachelor room (11'-7"x10'-10") drawing number
25. Lift Lobby (9'-7'' X 8'-0'') manager to DGM)
26. Corridor-4 (6'-2"x18'-10")
29. Toilet (5'-10'' X 5'-2'') ap - 1 1 0
29' Toilet (5'-10'' X 7'-1'')
rev- 0 0
A PROJECT OF
11 12 13 14
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
12'-1" 12' www.silverbricksbd.com.
5"
1'-3" 4'-6" 5" 2'-6" 3'-5" 3'-4" 2'-6" 5" 4'-6" 1'-3"
5"
5"
Note:
5"
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
5"
the company's concern.
2'-6"
2'-6"
H H
3'-7"
3'-7"
· All dimensions are in feet and inches,
unless specified.
30
5'-10"
30
5'-1"
5'-1"
· Measurement should not be taken by
29' 29'
5'-10"
5"
fitting the scale on drawing.
5"
7'-11"
7'-11"
5" · Any discrepancy during execution should be
informed
4'-11" 5'-11" 5'-10" 4'-11"
5'-5"
5'-5"
10"
5"
5"
3'-11"
3'-11"
5" 31
31 client name:
1'-7"
2'
1'-3"
1'-3"
INFINIA GROUP
5"
5"
ARC ITECT S NAME
4'-11" 5" 5'-3" 10" 5'-3" 5" 4'-11"
10" Asaduzzaman Chowdhury
10" 5" 5" C - 040
Sinthia Shobnom
S - 136
24'-6" Aniket Chowdhury
C - 066
11 12 13 14
Kaushik Das
AD - 064
13'
Blow-Up Detail-5b'(for 9TH FLOOR) revi i n n de cripti n
5"
5" 2'-6" 3'-4" 3'-5" 2'-6" 5"
5"
5"
5"
PROJECT NAME:
INFINIA MANAGER'S
3'-11"
3'-11"
QUARTER
5'-1"
5"
7'-11"
29' 29'
7'-11"
PROJECT LOCATION:
5'-10" 5'-11"
KESHABPUR, SHITALPUR,
1'-3"
1'-3"
Blow-Up Detail-5d (for 9TH FLOOR) SITAKUNDA.
1'-7" 5"
1'-11"
1'-11"
DRAWING TITLE:
BLOW-UP DETAILS
5"
5"
DRAWING STATUS:
5'-2" 10" 5'-4" FOR APPROVAL
5" 5" 5" 5"
ap-110(A)
rev- 00
A PROJECT OF
13'
5"
5"
www.silverbricksbd.com.
5" 1'-7"
1'-11"
1'-11"
Note:
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
the company's concern.
Blow-Up Detail-5e (for 9TH FLOOR)
1'-3"
1'-3"
5" · All dimensions are in feet and inches,
5'-10" 5'-11"
7'-11"
7'-11"
unless specified.
5'-1"
fitting the scale on drawing.
3'-11"
3'-11"
· Any discrepancy during execution should be
informed
5"
client name:
5"
5"
5" 2'-6" 3'-4" 3'-5" 2'-6" 5" INFINIA GROUP
11 12 13 14 Sinthia Shobnom
S - 136
Aniket Chowdhury
24'-6" C - 066
Kaushik Das
AD - 064
5" 5"
10" 4'-11" 5" 5'-3" 10" 5'-3" 5" 4'-11" 10" revi i n n de cripti n
5"
5"
1'-3"
1'-3"
5" 1'-7"
31
2'
31 5"
5" 10"
5'-5"
5'-5"
10"
4'-11" 5'-10" 5'-11" 4'-11"
7'-11"
7'-11"
5" PROJECT NAME:
5'-10"
30 30 INFINIA MANAGER'S
5'-10"
29' 29'
30 QUARTER
2'-6"
2'-6"
A A PROJECT LOCATION:
5"
KESHABPUR, SHITALPUR,
SITAKUNDA.
5"
1'-3" 4'-6" 5" 2'-6" 3'-4" 3'-5" 2'-6" 5" 4'-6" 1'-3"
5" DRAWING TITLE:
12' 12'-1" BLOW-UP DETAILS
DRAWING STATUS:
11 12 13 14 FOR APPROVAL
ap-110(B)
rev- 00
A PROJECT OF
B
www.silverbricksbd.com.
146'-6"
10"
10"
10"
10" Note:
10"
· This drawing is the property of SILVER BRICKS.
3'-9"
3'-9"
3'-9"
PLANTER BOX
This drawing should not be used without
the company's concern.
10"
10"
A A
10"
10" · All dimensions are in feet and inches,
10'-3" 129'-5" 3'-6" unless specified.
10" 10" 10"
· Measurement should not be taken by
fitting the scale on drawing.
28'-5"
28'-5"
30'-1"
21'-9"
21'-9"
PLANTER BOX 36 PLANTER
BOX · Any discrepancy during execution should be
informed
29'-8"
10" 10" 10"
1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3"
10" 10'-3" 11'-4" 6'-0" 22'-0" 6'-0" 22'-0" 6'-0" 22'-0" 6'-0" 18'-1" 3'-6"
client name:
2'-11"
2'-11"
B B INFINIA GROUP
10"
10"
4'-4"
5'-0"
11'-1"
5'-0"
5'-0"
37.
20'-0" 64'-11" 6'-5" 20'-4"
5"
ARC ITECT S NAME
C C
DN Asaduzzaman Chowdhury
7'-9"
C - 040
89'-10"
Stair-1
Blow-Up Detail-4(a)
12'-2"
07 Blow-Up Detail-3(a)
09 Sinthia Shobnom
76'-6"
D D S - 136
18'-10"
29'-8"
29'-8"
19'-8"
E DN E Aniket Chowdhury
36 C - 066
12'-0"
Kaushik Das
6'-11"
A 8'-7" Stair-2 A
7'-6"
08 AD - 064
37. 09
5"
F 10" F
11'-1" 18'-7" 9'-7" 10'-5" 64'-11" 6'-2" 18'-1" revi i n n de cripti n
5'-0"
5'-0"
1'-3"
2'-11" 5'-0"
1'-3"
4'-4"
10"
2'-11"
G G
10"
27'-2"
36
19'-3"
19'-3"
28'-5"
28'-5"
30'-1"
PLANTER BOX 10"
10" 10" 10"
10'-3" 129'-5" 3'-6" PROJECT NAME:
INFINIA MANAGER'S
10"
10"
10"
QUARTER
H H
6'-3"
6'-3"
6'-3"
PLANTER BOX
PROJECT LOCATION:
10"
KESHABPUR, SHITALPUR,
10"
10"
SITAKUNDA.
144'-10"
10" 10"
B
01 02 03 04 05 06 07 08 09 10 11 12 13 14
Legends DRAWING STATUS:
ROOF PLAN No.
07.
08.
FUNCTIONS
Stair-1
Stair-2
DIMENSION
(18'-4'' X 10'-0'')
(18'-8'' X 10'-0'')
FOR APPROVAL
ap - 111
rev- 0 0
A PROJECT OF
Note:
11 Riser
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
5'
the company's concern.
10'
· Measurement should not be taken by
fitting the scale on drawing.
11 Riser
· Any discrepancy during execution should be
5'
informed
03 04 05 client name:
INFINIA GROUP
20'
10"
1'-3" Asaduzzaman Chowdhury
0"
C - 040
C C
1'-9" 2'-1"
Sinthia Shobnom
S - 136
10 Tread @10" Aniket Chowdhury
4'-7" DN C - 066
5' 8'-4" 5' Kaushik Das
9'-8"
10'-9"
AD - 064
10" 10"
9'-11"
12'-2"
1
Stair-1
4'
2" thick tiles tread
10"
revision no description
07 1
10 Tread @10" 2" thick tiles riser
4'-7"
D D
19'-8"
19'-8"
3'
10"
10"
E E
2'-6"
1'
2'-2"
6'-11"
8'-11"
1
3'-6" 4'-5" 8'-7" 2" thick screed
7'-6"
1 QUARTER
09 2" thick cs plaster
2'
37.
11'-1"
1'
PROJECT LOCATION:
F F
1'
KESHABPUR, SHITALPUR,
SITAKUNDA.
UP
3'
3'
10 Tread @10"
DRAWING TITLE:
6'-7" 3' 8'-4" 2'-1" blow-up details
20'
DRAWING STATUS:
FOR APPROVAL
03 04 05
Blow-Up Detail-3a(for Roof ) drawing number
ap-111(A)
rev- 00
A PROJECT OF
Note:
11 Riser
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
5'
the company's concern.
10'
· Measurement should not be taken by
fitting the scale on drawing.
11 Riser
· Any discrepancy during execution should be
5'
informed
11 12 13 client name:
3'
11'-1"
4'
Sinthia Shobnom
S - 136
2 Tread @10"
C C
1'
Aniket Chowdhury
1'-8"
C - 066
3'
Kaushik Das
1'-3" 5" 1' AD - 064
7'-9"
6'-11"
8'-11"
10" 2" thick tiles tread
3'
5'-5"
revision no description
1
09 2" thick tiles riser
2'-2"
10"
10"
D D
1'
2'-6"
19'-8"
19'-8"
Stair-2
3'
E E
4'-7"
9'-11"
10"
10'-9"
7'
INFINIA MANAGER'S
4'
10"
3" 1 QUARTER
5'-4"
08 8'-4" 5' 2" thick cs plaster
4'-7"
2'-1" 1'-8"
PROJECT LOCATION:
10 Tread @10"
KESHABPUR, SHITALPUR,
2'-6"
SITAKUNDA.
F F
10"
DRAWING TITLE:
18'-1"
blow-up details
1'-3" 1'-3"
11 12 13
drawing number
Blow-Up Detail-4a(for Roof )
ap-111(B)
rev- 00
A PROJECT OF
B
www.silverbricksbd.com.
Note:
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
the company's concern.
A A · All dimensions are in feet and inches,
unless specified.
10"
1' 18' 1' 3'-6" 1' 6' 1' 22'-6" 1' 6' 1' 22'-6" 1' 5'-7" 1'-8" 8'-6" 8'-7" 1'
client name:
B B INFINIA GROUP
3' 5'-10" 4'-7"
7 tread @ 10"
3'
UP.
4'
2 tread @ 10"
ARC ITECT S NAME
C C
1'
1'
Asaduzzaman Chowdhury
6'-11"
6'-11"
40. C - 040
9'-9"
38. 37.
10" 6'-4" 3'
10"
8'-7" 1'
Sinthia Shobnom
D D S - 136
1'
19'-8"
19'-8"
E E Aniket Chowdhury
1'
1' C - 066
9'-9"
1' 5'-7" 3' 8'-7" 39.
Kaushik Das
6'-11"
A 10" A AD - 064
40.
37.
F F
1'
1'
10 tread @ 10"
UP. 18'-9" 1' revi i n n de cripti n
3'
10"
20'-7"
3' 8'-4"
G 20' G
1' 3'-6" 1' 6' 1' 22'-6" 1' 6' 1' 22'-6" 1' 5'-7" 1'-8"
73'-9"
PROJECT NAME:
INFINIA MANAGER'S
QUARTER
H H
PROJECT LOCATION:
KESHABPUR, SHITALPUR,
SITAKUNDA.
B
DRAWING TITLE:
FLOOR PLAN
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
ROOF TOP PLAN Legends
No. FUNCTIONS DIMENSION
FOR APPROVAL
ap - 1 12
rev- 0 0
A PROJECT OF
B
www.silverbricksbd.com.
Note:
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
the company's concern.
client name:
INFINIA GROUP
20'-7" 20'-7"
10" 10" 10" 10"
18'-11" 18'-11"
10"
10"
ARC ITECT S NAME
C C
Asaduzzaman Chowdhury
C - 040
Sinthia Shobnom
D D S - 136
19'-8"
18'-0"
18'-0"
19'-8"
E E Aniket Chowdhury
C - 066
Kaushik Das
A A AD - 064
10"
10"
F F
revi i n n de cripti n
03 04 05 06 07 08 09 10 11 12 13 PROJECT NAME:
INFINIA MANAGER'S
OHWT & MACHINE ROOM QUARTER
DRAWING TITLE:
FLOOR PLAN
DRAWING STATUS:
FOR APPROVAL
drawing number
ap - 113
rev- 0 0
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
www.silverbricksbd.com.
146'-6"
1'-6"
1'-6"
1'-6"
1'-6"
A A
2'-6"
2'-6"
2'-6"
· All dimensions are in feet and inches,
1'-0"
1'-0"
unless specified.
±0'-0"
LEVEL
· Measurement should not be taken by
(Green ) ±0'-0" fitting the scale on drawing.
LEVEL
±0'-0" (Green ) · Any discrepancy during execution should be
20'-3"
20'-3"
19'-3"
19'-3"
19'-3"
LEVEL
19'-8"
19'-8"
±0"
(Green ) informed
+ 2'-0" LEVEL + 2'-0" LEVEL + 2'-0" LEVEL + 2'-0" LEVEL
38'-0"
6'-0" client name:
2'-11"
2'-11"
2'-11"
2'-11"
2'-11"
B
2'-6"
2'-6"
B INFINIA GROUP
59'-9"
54'-4"
1'-3"
5'-0"
5'-0"
5'-0"
5'-0"
10'-10"
65'-6"
1'-3"
Asaduzzaman Chowdhury
1'-3"
1'-3"
6'-11"
8'-11"
C - 040
10'-9"
8'-5"
89'-10"
Sinthia Shobnom
2'-6"
2'-6"
+ 1'-0" 9'-9"
±0'-0"
D LEVEL
D S - 136
17'-2"
LEVEL
29'-8"
79'-0"
10"
14'-8"
19'-8"
±0" 3'-6"
(Green
Aniket Chowdhury
2'-6"
E 14'-8" Lawn) E
±0" C - 066
10'-6"
10'-6"
9'-11"
LEVEL
Kaushik Das
6'-11"
8'-11"
1'-3"
1'-3"
AD - 064
10'-5" 8'-7"
12'-6"
4'-4"
F F
1'-3"
1'-3"
30'-6" 9'-7" 10'-5" 65'-6"
5'-10"
revi i n n de cripti n
5'-0"
1'-3"
1'-3" 22'-0" 6'-0"
G
2'-11"
2'-11"
2'-6"
2'-6"
+ 2'-0" LEVEL + 2'-0" LEVEL + 2'-0" LEVEL + 2'-0" LEVEL G
1'-0"
16'-7"
4'-7"
4'-7"
4'-7"
30'-6"
22'-6" 22'-6" 22'-6"
19'-8"
19'-8"
19'-3"
23'-8"
±0'-0"
±0'-0" + 2'-0" ±0'-0" ±0'-0" + 2'-0" ±0'-0"
LEVEL +0'-6"LEVEL
13'-9"
13'-9"
LEVEL
14'-8"
14'-8"
14'-8"
14'-8"
14'-8"
LEVEL LEVEL LEVEL LEVEL LEVEL
30'-1"
11"
11"
2'-5"
QUARTER
H
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
H
5"
16'-7" 5'-5" 6'-0" 22'-0" 6'-0" 22'-0" 6'-0" 22'-0" 6'-0" 22'-0"
12'-3"
12'-3"
5'-5"
10" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3" 1'-3"
PROJECT LOCATION:
14'-3"
146'-6"
KESHABPUR, SHITALPUR,
1'-9"
10" SITAKUNDA.
1'-7"
1'-7"
10"
1'-9"
DRAWING TITLE:
SLAB LAYOUT
7'-
"
10
10
7'-
"
3"
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
ap - 201
rev- 0 0
A PROJECT OF
5'-3" Note:
5"
· This drawing is the property of SILVER BRICKS.
10"
5'-3"
5'-5"
5'-5"
This drawing should not be used without
10"
6'-8"
the company's concern.
A A
2'-6"
2'-6"
22'-0" · All dimensions are in feet and inches,
unless specified.
19'-3"
35'-11"
19'-8"
19'-8"
informed
client name:
1'-0"
B INFINIA GROUP
2'-6"
2'-6"
B
22'-3"
5'-0"
5'-5"
5'-5"
5'-5"
5'-10"
1'-3"
1'-3"
3'-4" 12'-11" 64'-6"
10"
ARC ITECT S NAME
C C
5"
16'-9" 4'-4" Asaduzzaman Chowdhury
10'-9"
10"
C - 040
6'-11"
8'-1"
9'-9"
Sinthia Shobnom
24'-3"
24'-3"
89'-10"
18'-10"
18'-10"
89'-9"
4'-7" 13'-4"
E Aniket Chowdhury
E
C - 066
23'-10"
13'-4"
10"
9'-11"
9'-11"
Kaushik Das
6'-11"
8'-11"
Half Landing Beam AD - 064
1'-3"
23'-6" 8'-7"
F 6'-7" 5'-2" 12'-11" 4'-4"
F
64'-6" 1'-3" 1'-3" revi i n n de cripti n
5'-10"
5'-5"
5'-5"
5'-5"
5'-5"
5'-5"
5"
5'-0"
G
2'-6"
2'-6"
G
35'-6"
19'-8"
19'-8"
30'-1"
PROJECT NAME:
INFINIA MANAGER'S
QUARTER
H
2'-6"
2'-6"
H
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 5"
5'-8"
2'-4" 1'-7"
2'-4" 1'-7"
2'-4" 1'-7"
2'-4" 1'-7"
PROJECT LOCATION:
5'-5"
5'-5"
10"
5'-2"
10"
KESHABPUR, SHITALPUR,
5"
SITAKUNDA.
146'-5"
DRAWING TITLE:
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
1ST FLOOR SLAB LAYOUT
drawing number
ap - 202
rev- 0 0
A PROJECT OF
5"
Note:
10"
· This drawing is the property of SILVER BRICKS.
1'-7" 2'-4"
1'-7" 2'-4"
1'-7" 2'-4"
1'-7" 2'-4"
17'-3" 5'-3"
This drawing should not be used without
5'-5"
5'-5"
10"
the company's concern.
6'-8"
11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
A
2'-6"
2'-6"
A · All dimensions are in feet and inches,
unless specified.
30'-1"
· Any discrepancy during execution should be
35'-6"
informed
19'-8"
19'-8"
client name:
1'-0"
B 5'-10" 3'-1" INFINIA GROUP
2'-6"
2'-6"
12'-1"
B
0"
5'-5"
5'-0"
5'-0"
5'-5"
5'-5"
1'-3"
23'-6" 7'-0" 2'-6" 3'-4" 12'-11" 64'-6"
ARC ITECT S NAME
5"
C 2'-8" C
Asaduzzaman Chowdhury
13'-4" 10"
C - 040
6'-11"
8'-11"
10'-4"
9'-9" 8'-7"
Sinthia Shobnom
S - 136
D 6'-7" 5'-2" 3'-9" D
89'-10"
18'-10"
18'-10"
29'-8"
Half Landing Beam 140'-11" Aniket Chowdhury
18'-10"
E E
18'-10"
4'-7" 3'-9"
C - 066
89'-10"
24'-3"
8'-8"
9'-11"
Kaushik Das
8'-6"
6'-11"
10"
Half Landing Beam
AD - 064
6'-5" 15'-10" 13'-4"
8'-7"
2'-1"
F F
10"
5"
revi i n n de cripti n
7'-1"
5'-5"
5'-5"
5'-5"
5'-5"
5'-0"
5'-0"
16'-7" 10'-5" 64'-6"
5'-5"
5'-0"
6'-0" 6'-0" 6'-0" 6'-0"
G
2'-6"
2'-6"
G
1'-0"
1'-0"
12'-1" 3'-1"
1'-0"
1'-0"
1'-0"
19'-8"
19'-8"
19'-3"
19'-3"
19'-3"
19'-3"
30'-1"
PROJECT NAME:
INFINIA MANAGER'S
QUARTER
H
2'-6"
2'-6"
H
4'-0"
4'-0"
4'-0"
4'-0"
10" 6'-0" 10" 6'-0" 10" 6'-0" 10" 6'-0"
6'-8"
11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10"
PROJECT LOCATION:
2'-4" 1'-7"
2'-4" 1'-7"
2'-4" 1'-7"
2'-4" 1'-7"
5'-5"
5'-5"
10"
18'-6" 5'-3"
5" 10"
KESHABPUR, SHITALPUR,
SITAKUNDA.
146'-6"
DRAWING TITLE:
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
ap -203
rev- 00
A PROJECT OF
5"
2'-6" 2'-11"
4'-11" 13'-0" 5'-9" 6'-0" 5'-9" 13'-0" 5'-9" 6'-0" 5'-9" 13'-0" 5'-9" 6'-0" 5'-9" 13'-0" 5'-9" · This drawing is the property of SILVER BRICKS.
5"
18'-6" 5'-3"
5'-5"
5'-5"
10" This drawing should not be used without
1'-7"
1'-7"
1'-7"
10"
5"
1'-0"
5"
5"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
7'-11"
1'-0"
1'-7"
6'-8"
the company's concern.
4'-0"
4'-0"
4'-0"
4'-0"
5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9"
5'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10"
A A
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
· All dimensions are in feet and inches,
1'-0"
1'-0"
1'-0"
1'-0"
unless specified.
30'-1"
· Any discrepancy during execution should be
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
35'-6"
19'-8"
19'-8"
informed
1'-0"
1'-11"
1'-11"
1'-11"
1'-11"
1'-0"
2'-11"
2'-11"
2'-11"
2'-11"
B INFINIA GROUP
2'-6"
2'-6"
5'-10" 12'-1" 3'-1"
B
1'-0"
1'-0"
5'-0"
5'-5"
5'-0"
5'-0"
1'-3"
5'-5"
5'-5"
7'-8" 15'-10" 7'-0" 2'-6" 3'-4" 12'-11" 64'-6" 14'-1" 12'-1" 1'-0"
5"
ARC ITECT S NAME
C 2'-8" C
1'-8"
10"
Asaduzzaman Chowdhury
C - 040
6'-11"
8'-11"
89'-10"
19'-8"
9'-9"
Sinthia Shobnom
8'-8"
8'-7"
D 6'-7" 5'-2" 3'-9" D S - 136
89'-10"
18'-10"
18'-10"
18'-10"
18'-10"
29'-8"
Half Landing Beam
E Aniket Chowdhury
3'-9" E
C - 066
8'-8"
9'-11"
Kaushik Das
6'-11"
8'-6"
Half Landing Beam AD - 064
8'-7"
5"
12'-11"
2'-1"
F F
10"
23'-6" 16'-7" 10'-5" 64'-6" 6'-7" 6'-3" 12'-1" 4'-4" revi i n n de cripti n
5'-5"
5'-5"
1'-3" 1'-0"
5'-0"
5'-0"
5'-5"
5'-0"
6'-0" 6'-0" 6'-0" 6'-0"
G
2'-6"
2'-6"
G
1'-11"
1'-11"
1'-11"
1'-0"
1'-0"
21'-2"
21'-2"
21'-2"
21'-2"
35'-6"
19'-8"
19'-8"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
30'-1"
PROJECT NAME:
INFINIA MANAGER'S
1'-0"
1'-0"
1'-0"
1'-0"
QUARTER
H
2'-6"
2'-6"
H
2'-6"
4'-0"
4'-0"
4'-0"
4'-0"
5'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
6'-8"
4'-11" 6'-0" 6'-1" 5'-9" 5'-9" 6'-0" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9"
2'-6"
5" 1'-7"
5" 1'-7"
5" 1'-7"
5" 1'-7"
PROJECT LOCATION:
5'-5"
5'-5"
5'-5"
10"
2'-11"
17'-8" 5'-3"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
10"
KESHABPUR, SHITALPUR,
5"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9"
10"
24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" SITAKUNDA.
146'-6"
DRAWING TITLE:
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
ap - 204
rev- 0 0
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
146'-6" www.silverbricksbd.com.
10" 5"
2'-6" 2'-11"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9"
1'-0"
5"
17'-8" 5'-3" · This drawing is the property of SILVER BRICKS.
5'-5"
5'-5"
5'-5"
5'-5"
10"
1'-7"
1'-7"
1'-7"
5"
5"
5"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
This drawing should not be used without
1'-0"
1'-0"
1'-7"
6'-8"
4'-0"
4'-0"
4'-0"
4'-0"
5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" the company's concern.
5'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
A
2'-6"
2'-6"
2'-6"
A
2'-6"
5'-0"
· All dimensions are in feet and inches,
1'-0"
1'-0"
1'-0"
1'-0"
unless specified.
30'-1"
· Any discrepancy during execution should be
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
35'-6"
19'-8"
19'-8"
informed
1'-11"
1'-11"
1'-11"
1'-11"
2'-11"
2'-11"
2'-11"
2'-11"
6'-5" 15'-7"
B 5'-10" 3'-1"
2'-6"
2'-6"
12'-1"
B INFINIA GROUP
1'-0"
1'-0"
1'-0"
1'-0"
5'-5"
5'-5"
1'-3"
5'-0"
5'-0"
5'-0"
5'-5"
5'-5"
5"
C 2'-8" C ARC ITECT S NAME
1'-8"
10" Asaduzzaman Chowdhury
6'-11"
8'-11"
9'-9" C - 040
8'-8"
Half Landing Beam 10"
1'-3" 8'-8" Sinthia Shobnom
5"
D 6'-7" 3'-9" D S - 136
89'-10"
89'-10"
18'-10"
29'-8"
18'-10"
E 7'-0" 4'-7" 3'-9" E Aniket Chowdhury
24'-3"
1'-3" C - 066
8'-8"
9'-11"
Kaushik Das
6'-11"
8'-6"
Half Landing Beam AD - 064
2'-1"
8'-7"
5'-2"
F F
10"
5'-5"
5"
revi i n n de cripti n
5'-5"
5'-0"
7'-8" 15'-10" 16'-7" 10'-5" 64'-6" 6'-7" 6'-3" 12'-1" 4'-4"
5'-0"
5'-0"
5'-5"
5'-5"
1'-3" 1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
G
2'-11"
2'-11"
2'-11"
2'-11"
2'-6"
2'-6"
G
1'-11"
1'-11"
1'-11"
1'-11"
6'-5"
21'-2"
21'-2"
21'-2"
19'-8"
19'-8"
19'-3"
19'-3"
19'-3"
19'-3"
30'-1"
30'-1"
PROJECT NAME:
1'-0"
1'-0"
INFINIA MANAGER'S
1'-0"
1'-0"
QUARTER
H
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
H
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
2'-6"
5'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
6'-8"
4'-11" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9"
2'-6"
5" 1'-7"
5" 1'-7"
5" 1'-7"
5" 1'-7"
5'-5"
5'-5"
5'-5"
10"
PROJECT LOCATION:
2'-11"
17'-8" 5'-3"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
10"
10"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" KESHABPUR, SHITALPUR,
5"
SITAKUNDA.
24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6"
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
drawing number
ap - 205
rev- 0 0
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
146'-6" www.silverbricksbd.com.
10" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6"
Note:
10" 5"
2'-6" 2'-11"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9"
· This drawing is the property of SILVER BRICKS.
1'-0"
5"
18'-6" 5'-3"
5'-5"
5'-5"
5'-5"
5'-5"
10"
1'-7"
1'-7"
1'-7"
5"
5"
5"
This drawing should not be used without
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-7"
6'-8"
the company's concern.
4'-0"
4'-0"
4'-0"
4'-0"
5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9"
5'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
A
2'-6"
2'-6"
2'-6"
2'-6"
A
5'-0"
· All dimensions are in feet and inches,
1'-0"
1'-0"
1'-0"
1'-0"
unless specified.
30'-1"
· Any discrepancy during execution should be
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
35'-6"
19'-8"
19'-8"
informed
1'-0"
1'-0"
1'-11"
1'-11"
1'-11"
1'-11"
2'-11"
2'-11"
2'-11"
2'-11"
6'-5" 15'-7"
B 5'-10" 12'-1" 3'-1"
2'-6"
2'-6"
1'-0" B INFINIA GROUP
1'-0"
1'-0"
5'-5"
5'-0"
5'-0"
5'-0"
5'-5"
5'-5"
5'-5"
15'-10" 7'-0" 2'-6" 3'-4" 12'-11" 1'-3" 64'-6" 14'-1" 12'-1"
1'-0"
5"
ARC ITECT S NAME
C 2'-8" C
10" Asaduzzaman Chowdhury
6'-11"
8'-11"
C - 040
10'-4"
9'-9"
89'-10"
18'-10"
18'-10"
29'-8"
E E Aniket Chowdhury
7'-0" 4'-7" 3'-9" 13'-4"
24'-3"
C - 066
18'-10"
1'-3"
8'-8"
10"
9'-11"
Kaushik Das
6'-11"
8'-6"
Half Landing Beam AD - 064
8'-7"
2'-1"
5'-2"
5"
F F
10"
5'-5"
revi i n n de cripti n
5'-5"
5'-0"
5'-0"
7'-8" 15'-10" 16'-7" 10'-5" 64'-6" 6'-7" 6'-3" 12'-1" 4'-4"
5'-0"
5'-5"
5'-5"
1'-0"
1'-0"
1'-0"
1'-3"
1'-0"
1'-0"
2'-11"
2'-6"
2'-6"
G
2'-11"
2'-11"
2'-11"
G
1'-11"
1'-11"
1'-11"
1'-11"
6'-0" 6'-0" 6'-0" 6'-0"
21'-2"
21'-2"
21'-2"
21'-2"
19'-8"
19'-8"
19'-3"
19'-3"
19'-3"
19'-3"
30'-1"
30'-1"
PROJECT NAME:
1'-0"
INFINIA MANAGER'S
1'-0"
1'-0"
1'-0"
QUARTER
H
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
H
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
2'-6"
5'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
6'-8"
4'-11" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9"
2'-6"
5" 1'-7"
5" 1'-7"
5" 1'-7"
5" 1'-7"
5'-5"
5'-5"
5'-5"
10" PROJECT LOCATION:
2'-11"
17'-8" 5'-3"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
10"
10"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" KESHABPUR, SHITALPUR,
5"
SITAKUNDA.
24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6"
145'-8"
DRAWING TITLE:
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
ap - 206
rev- 0 0
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
146'-6" www.silverbricksbd.com.
5"
Note:
1'-7"
2'-6" 2'-11"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9"
1'-0"
5"
· This drawing is the property of SILVER BRICKS.
5'-5"
5'-5"
5'-5"
5'-5"
1'-7"
1'-7"
1'-7"
5"
5"
5"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
This drawing should not be used without
1'-0"
1'-0"
1'-7"
11'-10" 11'-10"
5'-11"
4'-0"
4'-0"
4'-0"
4'-0"
5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" the company's concern.
5'-0"
5'-0"
5'-0"
10"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
A
2'-6"
2'-6"
2'-6"
2'-6"
A
5'-0"
· All dimensions are in feet and inches,
1'-0"
1'-0"
1'-0"
1'-0"
unless specified.
30'-1"
· Any discrepancy during execution should be
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
35'-6"
19'-8"
19'-8"
informed
1'-11"
1'-11"
1'-11"
1'-11"
2'-11"
2'-11"
2'-11"
2'-11"
1'-0"
6'-5" 15'-7"
B 5'-10" 12'-1" 3'-1"
2'-6"
2'-6"
B INFINIA GROUP
1'-0"
1'-0"
1'-0"
5'-5"
5'-0"
5'-0"
5'-0"
1'-3"
5'-5"
5'-5"
5'-5"
23'-6" 7'-0" 2'-6" 3'-4" 12'-11" 64'-6" 14'-1" 12'-1"
1'-0"
5"
C 2'-8" C ARC ITECT S NAME
1'-8"
13'-4" 10" Asaduzzaman Chowdhury
6'-11"
8'-11"
C - 040
9'-9"
8'-8"
Half Landing Beam 10"
1'-3" 8'-8" Sinthia Shobnom
5"
D 6'-7" 3'-9" D S - 136
89'-10"
89'-10"
18'-10"
18'-10"
29'-8"
E 7'-0" 4'-7" 3'-9" 13'-4" E Aniket Chowdhury
24'-3"
C - 066
18'-10"
1'-3" 10"
8'-8"
9'-11"
Kaushik Das
6'-11"
8'-6"
Half Landing Beam AD - 064
8'-7"
2'-1"
5'-2"
F F
10"
5"
revi i n n de cripti n
5'-5"
5'-0"
7'-8" 15'-10" 16'-7" 10'-5" 64'-6" 6'-7" 6'-3" 12'-1" 4'-4"
5'-0"
5'-0"
5'-5"
5'-5"
1'-0"
1'-0"
5'-5"
1'-3"
1'-0"
G
2'-11"
2'-11"
2'-11"
2'-11"
2'-11"
2'-6"
2'-6"
G
1'-11"
1'-11"
1'-11"
1'-11"
6'-5"
1'-0"
6'-0" 6'-0" 6'-0" 6'-0"
21'-2"
21'-2"
21'-2"
21'-2"
19'-8"
19'-8"
19'-3"
19'-3"
19'-3"
19'-3"
30'-1"
30'-1"
PROJECT NAME:
1'-0"
1'-0"
INFINIA MANAGER'S
1'-0"
1'-0"
QUARTER
H
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
H
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
2'-6"
5'-0"
5'-0"
5'-0"
5'-11"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
4'-11" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 10"
2'-6"
5" 1'-7"
5" 1'-7"
5" 1'-7"
5" 1'-7"
11'-11" 11'-10"
5'-5"
5'-5"
5'-5"
PROJECT LOCATION:
2'-11"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-7"
10"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" KESHABPUR, SHITALPUR,
5"
SITAKUNDA.
24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6"
145'-8"
DRAWING TITLE:
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
6TH FLOORSLAB LAYOUT
drawing number
ap - 207
rev- 0 0
A PROJECT OF
24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" Note:
5"
2'-6" 2'-11"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" · This drawing is the property of SILVER BRICKS.
1'-0"
5"
3'-7"
5'-5"
5'-5"
5'-5"
5'-5"
1'-3" This drawing should not be used without
1'-7"
1'-7"
1'-7"
5"
5"
5"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-7"
1'-3"
10'-8" 10'-7" the company's concern.
4'-0"
4'-0"
4'-0"
4'-0"
5'-9" 6'-1" 6'-1" 5'-9" 5'-8" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-8" 6'-1" 6'-1" 5'-9"
5'-0"
5'-0"
5'-0"
10"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
A
2'-6"
2'-6"
2'-6"
2'-6"
A
5'-0"
· All dimensions are in feet and inches,
1'-0"
1'-0"
1'-0"
1'-0"
unless specified.
30'-1"
· Any discrepancy during execution should be
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
35'-6"
19'-8"
19'-8"
informed
1'-11"
1'-11"
1'-11"
1'-11"
2'-11"
2'-11"
2'-11"
2'-11"
B 6'-5" 15'-7"
INFINIA GROUP
2'-6"
5'-10" 12'-1" 3'-1"
2'-6"
1'-0"
1'-0"
1'-0"
5'-5"
5'-0"
5'-0"
5'-0"
5'-5"
5'-5"
5'-5"
7'-8" 10'-5" 12'-5" 2'-6" 3'-4" 12'-11" 1'-3" 64'-6" 14'-1" 12'-1"
1'-0" ARC ITECT S NAME
5"
C 2'-8" C
1'-8"
Asaduzzaman Chowdhury
13'-4" 10"
C - 040
6'-11"
8'-11"
9'-9" Sinthia Shobnom
8'-8"
Half Landing Beam 1'-3" 8'-8"
S - 136
D 6'-7" 5'-2" 3'-9" D
89'-10"
89'-10"
18'-10"
18'-10"
29'-8"
Aniket Chowdhury
E 12'-5" 4'-7" 3'-9" E
C - 066
24'-3"
18'-10"
1'-3"
8'-8"
9'-11"
Kaushik Das
6'-11"
8'-6"
10"
13'-4" Half Landing Beam
AD - 064
8'-7"
2'-1"
F F
10"
5"
5'-5"
revi i n n de cripti n
5'-5"
5'-0"
5'-0"
7'-8" 10'-5" 22'-0" 10'-5" 64'-6" 6'-7" 6'-3" 12'-1" 4'-4"
5'-0"
5'-5"
5'-5"
1'-0"
1'-0"
1'-0"
1'-0"
1'-3"
2'-6"
2'-6"
G
2'-11"
2'-11"
2'-11"
2'-11"
G
1'-11"
1'-11"
1'-11"
1'-11"
6'-5"
21'-2"
21'-2"
21'-2"
19'-8"
19'-8"
19'-3"
19'-3"
19'-3"
19'-3"
30'-1"
30'-1"
PROJECT NAME:
INFINIA MANAGER'S
1'-0"
1'-0"
1'-0"
1'-0"
QUARTER
H
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
H
5'-0"
2'-6"
5'-11"
3'-0"
5'-0"
3'-0"
5'-0"
3'-0"
5'-0"
3'-0"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
4'-11" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9"
2'-6"
10"
5" 1'-7"
5" 1'-7"
5" 1'-7"
5" 1'-7"
11'-11" 11'-10"
PROJECT LOCATION:
5'-5"
5'-5"
5'-5"
2'-11"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-7"
10"
KESHABPUR, SHITALPUR,
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9"
SITAKUNDA.
5"
24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6"
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
7TH FLOOR SLAB LAYOUT FOR APPROVAL
drawing number
ap - 208
rev- 0 0
A PROJECT OF
5"
Note:
2'-6" 2'-11"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" · This drawing is the property of SILVER BRICKS.
1'-0"
5"
3'-7"
5'-5"
5'-5"
5'-5"
5'-5"
This drawing should not be used without
1'-7"
1'-7"
1'-7"
5"
5"
5"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-7"
11'-10" 11'-10" the company's concern.
4'-0"
4'-0"
4'-0"
4'-0"
5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9"
5'-0"
5'-0"
5'-0"
10"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
A
2'-6"
2'-6"
2'-6"
2'-6"
A
5'-0"
· All dimensions are in feet and inches,
1'-0"
1'-0"
1'-0"
1'-0"
unless specified.
30'-1"
· Any discrepancy during execution should be
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
19'-3"
35'-6"
19'-8"
19'-8"
informed
1'-11"
1'-11"
1'-11"
1'-11"
2'-11"
2'-11"
2'-11"
2'-11"
6'-5" 15'-7"
B 5'-10" 12'-1" 3'-1"
INFINIA GROUP
2'-6"
2'-6"
B
1'-0"
1'-0"
1'-0"
1'-0"
5'-5"
5'-0"
5'-0"
5'-0"
5'-5"
10'-1" 19'-2" 2'-6" 3'-4" 12'-11" 1'-3" 64'-6" 14'-1" 12'-1"
1'-3" 1'-0"
ARC ITECT S NAME
C 2'-8" C
1'-8"
13'-4" 10"
Asaduzzaman Chowdhury
C - 040
6'-11"
8'-11"
89'-10"
9'-9"
12'-2"
Sinthia Shobnom
8'-8"
Half Landing Beam 1'-3" 8'-8"
89'-10"
18'-10"
18'-10"
29'-8"
29'-8"
29'-8"
E Aniket Chowdhury
19'-2" 4'-7" 3'-9" E
1'-3" C - 066
8'-8"
9'-11"
Kaushik Das
6'-11"
8'-6"
10"
13'-4" Half Landing Beam AD - 064
8'-7"
12'-6"
2'-1"
F F
10"
5'-5"
5"
1'-3" revi i n n de cripti n
5'-0"
6'-5" 15'-10" 16'-7" 10'-5" 5'-0" 64'-6" 6'-7" 6'-3" 12'-1" 4'-4"
5'-0"
5'-5"
1'-3" 1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
2'-6"
2'-6"
G
2'-11"
2'-11"
2'-11"
2'-11"
G
1'-11"
1'-11"
1'-11"
1'-11"
6'-5"
21'-2"
21'-2"
21'-2"
19'-8"
19'-8"
19'-3"
19'-3"
19'-3"
19'-3"
30'-1"
30'-1"
PROJECT NAME:
1'-0"
INFINIA MANAGER'S
1'-0"
1'-0"
1'-0"
QUARTER
H
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
H
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
2'-6"
5'-11"
5'-0"
5'-0"
5'-0"
4'-0"
4'-0"
4'-0"
4'-0"
10" 10" 10" 10"
2'-1"
4'-11" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 5'-9" 6'-1" 6'-1" 5'-9" 10"
2'-6"
5" 1'-7"
5" 1'-7"
5" 1'-7"
5" 1'-7"
11'-10" 11'-10"
PROJECT LOCATION:
5'-5"
5'-5"
5'-5"
2'-11"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-0"
1'-7"
10"
4'-11" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9" 5'-9" 13'-0" 5'-9"
KESHABPUR, SHITALPUR,
5"
SITAKUNDA.
24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6" 6'-0" 24'-6"
145'-8"
DRAWING TITLE:
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
ap - 209
rev- 0 0
A PROJECT OF
Note:
5"
5"
5"
5"
5"
1'-7"
1'-7"
1'-7"
1'-7"
1'-7"
· This drawing is the property of SILVER BRICKS.
5'-5"
5'-5"
11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" This drawing should not be used without
10" 10" 10" 10"
10"
the company's concern.
5'-11"
5'-11"
5'-11"
5'-11"
5'-11"
6'-0" 6'-0" 6'-0" 6'-0"
A
2'-6"
2'-6"
A · All dimensions are in feet and inches,
unless specified.
30'-1"
· Any discrepancy during execution should be
19'-3"
19'-3"
19'-3"
19'-3"
19'-8"
19'-8"
informed
client name:
1'-0"
1'-11"
1'-11"
1'-11"
1'-11"
2'-11"
2'-11"
2'-11"
2'-11"
B INFINIA GROUP
2'-6"
2'-6"
5'-10" 12'-1" 3'-1"
1'-0" B
1'-0"
1'-0"
1'-0"
5'-5"
5'-0"
5'-0"
1'-3"
11'-1" 19'-5" 2'-6" 3'-4" 12'-11" 64'-6"
5"
ARC ITECT S NAME
C 2'-8" C
1'-8"
Asaduzzaman Chowdhury
C - 040
6'-11"
8'-11"
9'-9"
Sinthia Shobnom
8'-8"
1'-3" 8'-7"
D 10" 6'-7" 5'-2" 3'-9" D S - 136
89'-10"
89'-10"
18'-10"
18'-10"
29'-8"
29'-8"
13'-4" 13'-4"
E 10" Aniket Chowdhury
4'-7" 3'-9" E
C - 066
8'-8"
9'-11"
Kaushik Das
6'-11"
8'-6"
AD - 064
5"
12'-11"
2'-1"
F F
10"
5'-5"
revi i n n de cripti n
5'-0"
5'-0"
29'-0" 10'-5" 64'-6"
5'-0"
5'-5"
1'-0"
1'-0"
1'-0"
1'-0"
11'-1"
6'-0" 6'-0" 6'-0" 6'-0" 12'-1" 3'-1"
2'-6"
2'-6"
G
2'-11"
2'-11"
2'-11"
2'-11"
G
1'-11"
1'-11"
1'-11"
1'-11"
1'-0"
9'-10"
19'-8"
19'-8"
19'-3"
19'-3"
19'-3"
19'-3"
30'-1"
30'-1"
PROJECT NAME:
INFINIA MANAGER'S
QUARTER
H
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
H
5'-11"
5'-11"
5'-11"
5'-11"
5'-11"
10"
10" 10" 10"
10"
PROJECT LOCATION:
5'-5"
5'-5"
11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10"
1'-7"
1'-7"
1'-7"
1'-7"
1'-7"
KESHABPUR, SHITALPUR,
5"
5"
5"
5"
5"
SITAKUNDA.
146'-6"
DRAWING TITLE:
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
ap - 210
rev- 0 0
A PROJECT OF
146'-6"
Note:
5"
5"
5"
5"
5"
1'-7"
1'-7"
1'-7"
1'-7"
1'-7"
· This drawing is the property of SILVER BRICKS.
5'-5"
5'-5"
11'-10" 11'-10" 11'-10"
10"
11'-10" 11'-0" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" This drawing should not be used without
10" 10" 10" 10"
the company's concern.
5'-11"
5'-11"
5'-11"
5'-11"
5'-11"
6'-0" 6'-0" 6'-0"
A
2'-6"
2'-6"
A · All dimensions are in feet and inches,
unless specified.
30'-1"
· Any discrepancy during execution should be
19'-8"
19'-8"
informed
client name:
B INFINIA GROUP
2'-6"
2'-6"
B
5'-5"
5'-0"
5'-0"
1'-3"
5'-5"
11'-1" 19'-5" 2'-6" 3'-4" 12'-11" 64'-6" 8'-3" 8'-6" 10'-5"
ARC ITECT S NAME
5"
C C
1'-8"
Asaduzzaman Chowdhury
C - 040
6'-11"
8'-11"
9'-9"
Sinthia Shobnom
8'-8"
1'-3" 8'-7"
10" S - 136
D 6'-7" 5'-2" 3'-9" D
18'-10"
18'-10"
29'-8"
29'-8"
13'-4" 13'-4"
Aniket Chowdhury
E 4'-7" 3'-9"
10"
E
C - 066
8'-8"
9'-11"
Kaushik Das
8'-6"
6'-11"
AD - 064
5"
12'-11"
2'-1"
F F
10"
5'-5"
revi i n n de cripti n
5'-0"
11'-1" 29'-0" 10'-5" 5'-0" 64'-6"
5'-5"
4'-4"
2'-11"
2'-11"
2'-11"
2'-6"
2'-6"
G
9'-10"
19'-8"
19'-8"
19'-3"
19'-3"
30'-1"
30'-1"
PROJECT NAME:
INFINIA MANAGER'S
QUARTER
H
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
2'-6"
H
5'-11"
5'-11"
5'-11"
5'-11"
5'-11"
10" 10" 10" 10" 10" PROJECT LOCATION:
5'-5"
5'-5"
5'-5"
5'-5"
11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10" 11'-10"
1'-7"
1'-7"
1'-7"
1'-7"
1'-7"
KESHABPUR, SHITALPUR,
5"
5"
5"
5"
5"
SITAKUNDA.
146'-6"
DRAWING TITLE:
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
ap - 211
rev- 0 0
A PROJECT OF
B
Note:
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
the company's concern.
111'-8"
2'-11"
2'-11"
B B
7'-11"
1'-0"
7 tread @ 10"
4'-6" 6'-0" 22'-6" 6'-0" 22'-6" 5'-7" 1'-8" UP.
2 tread @ 10"
15'-10"
1'-0" 1'-0" 1'-0" 1'-0" ARC ITECT S NAME
C C
Asaduzzaman Chowdhury
C - 040
7'-11"
LIFT MACHINE ROOM
WATER TANK SLAB
11'-9"
Sinthia Shobnom
S - 136
32'-7"
32'-7"
D D
19'-8"
19'-8"
Aniket Chowdhury
E E C - 066
11'-9"
LIFT MACHINE ROOM
WATER TANK SLAB Kaushik Das
A A
7'-11"
AD - 064
1'-0"
F 1'-0" 1'-0" 1'-0" F
10 tread @ 10" 4'-6" 6'-0" 22'-6" 6'-0" 22'-6" 5'-7" 1'-8" revi i n n de cripti n
UP. 1'-0"
7'-11"
7'-11"
G
2'-11"
2'-11"
G
111'-8"
PROJECT NAME:
INFINIA MANAGER'S
QUARTER
H H
PROJECT LOCATION:
KESHABPUR, SHITALPUR,
SITAKUNDA.
DRAWING TITLE:
B
SLAB LAYOUT
01 02 03 04 05 06 07 08 09 10 11 12 13 14
DRAWING STATUS:
FOR APPROVAL
ap - 212
rev- 0 0
A PROJECT OF
B
Note:
· This drawing is the property of SILVER BRICKS.
This drawing should not be used without
the company's concern.
client name:
INFINIA GROUP
20'-0"
20'-7"
ARC ITECT S NAME
C C
Asaduzzaman Chowdhury
C - 040
Sinthia Shobnom
S - 136
D D
19'-8"
19'-8"
19'-8"
19'-8"
Aniket Chowdhury
E E C - 066
Kaushik Das
A A AD - 064
F F
revi i n n de cripti n
20'-0" 20'-7"
03 04 05 06 07 08 09 10 11 12 13 PROJECT NAME:
INFINIA MANAGER'S
QUARTER
PROJECT LOCATION:
KESHABPUR, SHITALPUR,
SITAKUNDA.
DRAWING TITLE:
B
SLAB LAYOUT
drawing number
ap -213
rev- 00
A PROJECT OF
G
A
D
B
H
F
6"
OHWT
+ 122'-0" level
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
14'
www.silverbricksbd.com.
Note:
ROOF PARAPET
+ 108'-0" level · This drawing is the property of SILVER BRICKS.
This drawing should not be used without
4'
ROOF TOP the company's concern.
+ 104'-0" level
· All dimensions are in feet and inches,
unless specified.
10'
· Measurement should not be taken by
fitting the scale on drawing.
NINTH FLOOR
+94'-0" level · Any discrepancy during execution should be
informed
10'
EIGHTH FLOOR client name:
+ 84'-0" level
INFINIA GROUP
10'
S - 136
SIXTH FLOOR Aniket Chowdhury
+ 64'-0" level C - 066
122'-6"
Kaushik Das
AD - 064
10'
+ 54'-0" level
105'
10'
FOURTH FLOOR
+ 44'-0" level
10'
THIRD FLOOR
PROJECT NAME:
+ 34'-0" level
INFINIA MANAGER'S
QUARTER
10'
DRAWING TITLE:
FIRST FLOOR
+ 14'-0" level ELEVATION
12'
DRAWING STATUS:
FOR APPROVAL
PLINTH LEVEL(GROUND FLOOR)
+ 2'-0" level
2'
GROUND LEVEL
(+/_) 0'-0" level
drawing number
ap - 3 0 1
WEST ELEVATION rev- 0 0
A PROJECT OF
01 02 03 04 05 06 07 08 09 10 11 12 13 14
6"
OHWT
+ 122'-0" level
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
14'
www.silverbricksbd.com.
Note:
ROOF PARAPET
+ 108'-0" level · This drawing is the property of SILVER BRICKS.
This drawing should not be used without
4'
ROOF TOP the company's concern.
+ 104'-0" level
· All dimensions are in feet and inches,
unless specified.
10'
INFINIA GROUP
10'
S - 136
SIXTH FLOOR Aniket Chowdhury
+ 64'-0" level C - 066
122'-6"
Kaushik Das
AD - 064
10'
+ 54'-0" level
105'
10'
FOURTH FLOOR
+ 44'-0" level
10'
THIRD FLOOR
PROJECT NAME:
+ 34'-0" level
INFINIA MANAGER'S
QUARTER
10'
DRAWING TITLE:
FIRST FLOOR
+ 14'-0" level ELEVATION
12'
DRAWING STATUS:
FOR APPROVAL
PLINTH LEVEL(GROUND FLOOR)
+ 2'-0" level
2'
GROUND LEVEL
(+/_) 0'-0" level
drawing number
ap - 3 0 2
SOUTH ELEVATION rev- 0 0
A PROJECT OF
H G F E D C B A
6"
OHWT
+ 122'-0" level
IEB BHABAN (3rd floor),
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
14'
www.silverbricksbd.com.
Note:
ROOF PARAPET
+ 108'-0" level · This drawing is the property of SILVER BRICKS.
This drawing should not be used without
4'
ROOF TOP the company's concern.
+ 104'-0" level
· All dimensions are in feet and inches,
unless specified.
10'
· Measurement should not be taken by
fitting the scale on drawing.
NINTH FLOOR
+94'-0" level · Any discrepancy during execution should be
informed
10'
EIGHTH FLOOR
+ 84'-0" level
client name:
10' INFINIA GROUP
S - 136
SIXTH FLOOR Aniket Chowdhury
+ 64'-0" level C - 066
122'-6"
Kaushik Das
AD - 064
10'
+ 54'-0" level
105'
10'
FOURTH FLOOR
+ 44'-0" level
10'
THIRD FLOOR
PROJECT NAME:
+ 34'-0" level
INFINIA MANAGER'S
QUARTER
10'
DRAWING TITLE:
FIRST FLOOR
+ 14'-0" level ELEVATION
12'
DRAWING STATUS:
FOR APPROVAL
PLINTH LEVEL(GROUND FLOOR)
+ 2'-0" level
2'
GROUND LEVEL
(+/_) 0'-0" level
drawing number
ap - 3 0 3
EAST ELEVATION rev- 0 0
A PROJECT OF
01
14 13 12 11 10 09 08 07 06 05 04 03 02
IEB BHABAN (3rd floor),
6"
OHWT S.S. KHALED ROAD,
+ 122'-0" level
LALKHAN BAZAR, CHATTOGRAM.
PH: +880-02-41360233,
www.silverbricksbd.com.
14'
Note:
· This drawing is the property of SILVER BRICKS.
ROOF PARAPET This drawing should not be used without
+ 108'-0" level the company's concern.
4'
client name:
EIGHTH FLOOR
+ 84'-0" level
INFINIA GROUP
10'
S - 136
Aniket Chowdhury
SIXTH FLOOR
+ 64'-0" level C - 066
122'-6"
Kaushik Das
AD - 064
10'
+ 54'-0" level
105'
10'
FOURTH FLOOR
+ 44'-0" level
10'
INFINIA MANAGER'S
QUARTER
10'
SECOND FLOOR
+ 24'-0" level PROJECT LOCATION:
KESHABPUR, SHITALPUR,
SITAKUNDA.
10'
FIRST FLOOR
+ 14'-0" level
DRAWING TITLE:
ELEVATION
12'
DRAWING STATUS:
PLINTH LEVEL(GROUND FLOOR) FOR APPROVAL
+ 2'-0" level
2'
GROUND LEVEL
(+/_) 0'-0" level
drawing number
6"
6"
6"
6"
OHWT
+ 122'-0" level
6"
5'-6"
IEB BHABAN (3rd floor),
10'-6"
S.S. KHALED ROAD,
6"
18'
LALKHAN BAZAR, CHATTOGRAM.
14'
2'
PH: +880-02-41360233,
6"
2'
www.silverbricksbd.com.
1'-6"
9'-6"
3'-6"
3'-7"
ROOF PARAPET
7'-6"
9'
5"
+ 108'-0" level Note:
4'
4'
4'
· This drawing is the property of SILVER BRICKS.
ROOF TOP
7'-6"
+ 104'-0" level This drawing should not be used without
2'
2'
the company's concern.
5'
4'
1'-1"
4'
· All dimensions are in feet and inches,
1'
10'
10'
unless specified.
5"
3'
3'
5'
NINTH FLOOR · Measurement should not be taken by
2' 1'
1'
7'-6"
+94'-0" level fitting the scale on drawing.
2'
5'
· Any discrepancy during execution should be
4'
4'
1'-1"
informed
1'
10'
10'
5"
3'
5'
3'
EIGHTH FLOOR
2' 1'
1'
7'-6"
+ 84'-0" level
2'
client name:
5'
4'
1'-1"
4'
1'
10'
INFINIA GROUP
10'
5"
3'
3'
5'
SEVENTH FLOOR
2' 1'
1'
7'-6"
+74'-0" level
ARC ITECT S NAME
2'
5'
Asaduzzaman Chowdhury
4'
1'-1"
4'
1'
10'
10'
C - 040
Sinthia Shobnom
5"
3'
3'
5'
SIXTH FLOOR S - 136
2' 1'
1'
7'-6"
+ 64'-0" level
2'
Aniket Chowdhury
122'
5'
C - 066
4'
1'-1"
4'
1'
10'
Kaushik Das
10'
AD - 064
3'
5"
3'
5'
FIFTH FLOOR
108'
2' 1'
1'
7'-6"
+ 54'-0" level
2'
104'
revi i n n de cripti n
5'
4'
1'-1"
4'
1'
10'
10'
5"
3'
5'
3'
FOURTH FLOOR
2' 1'
1'
7'-6"
+ 44'-0" level
2'
5'
4'
1'-1"
4'
1'
10'
10'
5"
3'
3'
5'
THIRD FLOOR
2' 1'
1'
7'-6"
+ 34'-0" level
PROJECT NAME:
2'
5'
4'
INFINIA MANAGER'S
1'-1"
4'
1'
10'
10'
QUARTER
5"
3'
3'
5'
SECOND FLOOR
2' 1'
1'
7'-6"
+ 24'-0" level
2'
PROJECT LOCATION:
5'
KESHABPUR, SHITALPUR,
4'
1'-1"
1'
10'
10'
7'
SITAKUNDA.
5'
3'
5"
FIRST FLOOR
2' 1'
1'
+ 14'-0" level DRAWING TITLE:
8'
4'-6"
SECTION
2'
2'
12'
12'
12'
6"
12'
5'-6"
DRAWING STATUS:
3'
5'
PLINTH LEVEL(GROUND FLOOR)
2' 1'
2'
2'
GROUND LEVEL
(+/_) 0'-0" level
drawing number
SECTION AA ap - 4 0 1
rev- 0 0
A PROJECT OF
G
A
D
B
H
F
6"
6"
6"
OHWT
+ 122'-0" level
IEB BHABAN (3rd floor),
6'
S.S. KHALED ROAD,
LALKHAN BAZAR, CHATTOGRAM.
12'-6"
6"
14'
PH: +880-02-41360233,
2'
6"
www.silverbricksbd.com.
1'-6"
Lift Machine Room
7'-6"
+ 108'-0" level
5'-6"
5'-6"
2'-2" 1'-6"
· This drawing is the property of SILVER BRICKS.
3'
4'
4'
4'
6"
This drawing should not be used without
6"
ROOF TOP
2'-2" 1'
+ 104'-0" level the company's concern.
4"
2'-2"
5'
· All dimensions are in feet and inches,
2'-2"
4"
4"
4"
unless specified.
10'
10'
7'
7'
7'
7'
· Measurement should not be taken by
5'
6"
fitting the scale on drawing.
6"
NINTH FLOOR
+94'-0" level
2'
2'
2'
· Any discrepancy during execution should be
8"
2'-2"
2'-2"
5'
informed
4"
4"
4"
10'
10'
8'
8'
7'
7'
7'
5'
6"
6"
EIGHTH FLOOR
6"
2'-2"
+ 84'-0" level client name:
2'-8"
4"
2'-2"
4"
2'-2"
5'
INFINIA GROUP
4"
4"
10'
10'
7'
7'
7'
7'
5'
6"
6"
6"
+74'-0" level
2'-8"
Asaduzzaman Chowdhury
4"
2'-2"
2'-2"
5'
4"
C - 040
4"
4"
10'
10'
Sinthia Shobnom
7'
7'
7'
7'
S - 136
5'
SIXTH FLOOR
Aniket Chowdhury
6"
2'-2"
+ 64'-0" level
2'-8"
C - 066
4"
122'
5'
Kaushik Das
4"
10'
10'
AD - 064
7'
7'
5'
2'-2"
FIFTH FLOOR
108'
6"
2'-8"
104'
4"
4"
5'
10'
10'
7'
7'
5'
2'-2"
FOURTH FLOOR
6"
+ 44'-0" level
2'-8"
4"
4"
5'
10'
10'
7'
7'
5'
THIRD FLOOR PROJECT NAME:
6"
2'-2"
+ 34'-0" level
INFINIA MANAGER'S
4"
2'-8"
5'
4"
QUARTER
10'
10'
6'
6'
5'
SECOND FLOOR
PROJECT LOCATION:
2' 1'
1'
+ 24'-0" level
2'
1'-8"
4" 8"
KESHABPUR, SHITALPUR,
5'
4"
SITAKUNDA.
10'
10'
7'
7'
7'
5'
2' 1'
+ 14'-0" level
SECTION
5'-6"
1'-6"
12'
12'
1'
9'
10'
DRAWING STATUS:
12'
5'-6"
3'
FOR APPROVAL
PLINTH LEVEL(GROUND FLOOR) Lobby Outdoor Meeting Room
2' 1'
2' 1'
2'
2'
GROUND LEVEL
5'
drawing number
SECTION BB ap - 4 0 2
rev- 0 0