Concrete Mixer Daily Checklist

Operator: Batch Plant No.:


Contract: Contract No.: Week End:

NB: Initial each block. Mark with an “X” if faulty and record faults in table below

Criteria Mon Tue Wed Thu Fri Sat Sun


Conspicuously numbered
Moving parts properly guarded
Petrol / diesel motor in good condition
Oil leaks

Exterior Drum leaks, wear? (Internal blades wear)


Checks: Doors / covers / levers working, no damage
Gauges working / red line mark in place
Water tap and gauge functionality
Machine access controlled and safe
Damage to pipes
Petrol/Diesel level
Fluid
Transmission fluid level
Levels:
Engine oil level
Warning signs / notices displayed
Fire extinguisher available
General:
Operator trained
PPE available and worn
Inspectors Signature:
Construction Supervisor Signature:

Reported
Faults Found
To Date Time Signature

SSB/HMS/CHK028 v2 07/2017
Page 1 of 1
Tmpt 12/2015