SMX-0311-0102

• Zone C: all of the values of voltage was connected to the medium voltage magnitude

Uef (1/4) between T3 and the (20kV) in order to simulate voltage Test Description Low Power
lesser of the following values, T4 dips according to the Spanish Grid Low Power Test (10% - 30% of
and T3 + 150ms Code PO12.3. Elspec Equalizer RT nominal)
system was connected at the turbine The test comprises six tests as
Methodology for Calculating Power transformer output (690V). Elspec follows:
Power consumption is expressed Equalizer RT container comprises
in normalized value (p.u.) to the also 4 Elspec G4K BLACKBOX model Three sequential unbalanced tests
registered nominal power of the WTG EG4420, advanced power analyzer in Three sequential balanced tests
tested. Similarly, energy consumption order to carry out measurements in
values are expressed in normalized the following network points: The following table provides the
values of power by time unit in reactive current and energy values
milliseconds (ms p.u.) • Grid input to the RTC container which were required from the Equalizer
system 20kV. RT system in order to comply with
The voltage and current levels • RTC container system output to PO12.3. The values were confirmed
registered in the test, as well as data the turbine: approximately 20% by qualified company for the PO12.3
obtained from simulations must be of the medium voltage (during the test procedure, which was carried
included in the report form as per dips). out by the supplier Ride Through test
Table 1. • Transformer output of the container.
turbine - 690V (measurements
of the turbines generator and the Zone Reactive Current Reactive Energy
Equalizer RT system). A Above 2000A Above 800kVAr
• Equalizer RT system output B Above 2000A Above 800kVAr
C 2000A to 3500A 800 to 3300kVAr (*)
The measurements were carried out
continuously during the test period. Low Power Conditions
All network parameters were recorded
(*)The value is changed in proportion to the voltage
cycle by cycle at 1024 samples per
magnitude
cycle for voltages and 256 samples per
cycle for currents. For more details,
please refer to the G4k catalog web
site www.elspec-ltd.com at products

Energy and Power Registry

The Elspec Test


The 1.5 MW turbine can be supplied
with an automatic power factor
correction system that makes it
compliant with even very demanding
grid codes; the turbine has ride-
through capacity for all normal faults.

Test Setup
The RTC and the Equalizer RT
containers were located in adjacent and services.
Low Power Measurements
to the Turbine. The RTC container *)The value is changed in proportion to the voltage

Elspec Power Quality Solutions 2 www.elspec-ltd.com


Equalizer RT solution: With and Without

Low Power Results


The effect of the Equalizer RT on the
Grid at low power mode of operation of
the turbine (<30%) is seen in Figure
4. It illustrates the consumption of
the reactive energy and the current
in MV at the connection point of the
turbine to the Grid. It also provides
the current waveform of the Equalizer
RT in Low Voltage.

Without Equalizer RT, the consumption


of reactive energy during Zone C
almost reached 3 MVAR. With the
Equalizer RT, it reduced to less than
500kVAR. In Zone A & B, the Equalizer
RT contributes substantial reactive
energy to the Grid (above 800kVAR).

High Power Test (more than 1300kW)


The test comprises the same set of
parameters as the Low Power Test.

Three sequential unbalanced tests


Three sequential balanced tests

High Power Equalizer RT Measurements


(*)The value is changed in proportion to the voltage

magnitude

Elspec Power Quality Solutions 3 www.elspec-ltd.com


The following table provides the
relative current values which were
required from the Equalizer RT
system in order to comply with the
PO12.3. The values were confirmed
by a qualified company for PO12.3
algorithm.

Zone Reactive Current Reactive Energy


A Above 3300A Above 1500kVAr
B Above 3300A Above 1500kVAr
C 3500A-5500A 1500-6500kVAr (*)
High Power Conditions

(*)The value is changed in proportion to the voltage


magnitude

High Power Results


The effect of the Equalizer RT on the
Grid at high power mode of operation
of the turbine (>1300kW) is seen in
Figure 6. It illustrates the consumption
of the reactive energy and the current
in MV at the connection point of the
turbine to the Grid. It also provides
the active power of the turbine.

Without the Equalizer RT, the


consumption of reactive energy during
Zone C almost reached 7 MVAR. With
the Equalizer RT, it reduced to almost
zero. In Zone A & B, the Equalizer
RT contributes substantial reactive
energy to the Grid (above 1500kVAR).

High Power Results

This document contains Elspec proprietary material. The information contained in this document is believed to be reliable and accurate.

International North America Europe


Elspec Ltd. Elspec North America, Inc. Elspec Portugal Lda.
P.O. Box 3019 500 West South Street Zona Industrial 1a Fase
4 HaShoham St., Zone 23 Freeport, IL 61032 4900-231 Chafe
Caesarea Industrial Park USA Viana do Castelo
38900, Israel Tel: +1-815-266-4210 Portugal
©2008 Elspec Ltd.
All rights reserved. Tel: +972-4-6272-470 Fax: +1-815-266-8910 Tel: +315-258-351-920
SMC- Fax: +972-4-6272-465 email: info@elspecna.com Fax: +315-258-351-607
email: info@elspec-ltd.com email: info@elspecportugal.com

You might also like