EQ-Ride Through Lanternoso Wind Farm
EQ-Ride Through Lanternoso Wind Farm
EQ-Ride Through Lanternoso Wind Farm
• Zone C: all of the values of voltage was connected to the medium voltage magnitude
Uef (1/4) between T3 and the (20kV) in order to simulate voltage Test Description Low Power
lesser of the following values, T4 dips according to the Spanish Grid Low Power Test (10% - 30% of
and T3 + 150ms Code PO12.3. Elspec Equalizer RT nominal)
system was connected at the turbine The test comprises six tests as
Methodology for Calculating Power transformer output (690V). Elspec follows:
Power consumption is expressed Equalizer RT container comprises
in normalized value (p.u.) to the also 4 Elspec G4K BLACKBOX model Three sequential unbalanced tests
registered nominal power of the WTG EG4420, advanced power analyzer in Three sequential balanced tests
tested. Similarly, energy consumption order to carry out measurements in
values are expressed in normalized the following network points: The following table provides the
values of power by time unit in reactive current and energy values
milliseconds (ms p.u.) • Grid input to the RTC container which were required from the Equalizer
system 20kV. RT system in order to comply with
The voltage and current levels • RTC container system output to PO12.3. The values were confirmed
registered in the test, as well as data the turbine: approximately 20% by qualified company for the PO12.3
obtained from simulations must be of the medium voltage (during the test procedure, which was carried
included in the report form as per dips). out by the supplier Ride Through test
Table 1. • Transformer output of the container.
turbine - 690V (measurements
of the turbines generator and the Zone Reactive Current Reactive Energy
Equalizer RT system). A Above 2000A Above 800kVAr
• Equalizer RT system output B Above 2000A Above 800kVAr
C 2000A to 3500A 800 to 3300kVAr (*)
The measurements were carried out
continuously during the test period. Low Power Conditions
All network parameters were recorded
(*)The value is changed in proportion to the voltage
cycle by cycle at 1024 samples per
magnitude
cycle for voltages and 256 samples per
cycle for currents. For more details,
please refer to the G4k catalog web
site www.elspec-ltd.com at products
Test Setup
The RTC and the Equalizer RT
containers were located in adjacent and services.
Low Power Measurements
to the Turbine. The RTC container *)The value is changed in proportion to the voltage
magnitude