Departure Report

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

A Port of Departure El Dekheila/Egypt

Loading / Discharging Completed – Date / Time


B COMPLETED LOADING 28.12.2022 / 06.45 L.T
(LT) / ZD
Name of Cargo
 Cargo Qtty Loaded / Discharged B/L Figure Soya Beans in Bulk 4879.053 M.T
C
 Shore Scale
 Draft Survey Figure
Formalities Completed (All Documents On
D Board) / POB / all let go / Pilot Off – Date and / 15.45 / 1600 /1615 / 1645/ 28.12.2023
Time (LT)
E Number of Tugs Used 2
F Departure Drafts (F-M-A) / Density 2.20 M / 3.20 M / 4.20 M / 1.025
G Commence of Sea Passage – Date and Time (LT) 29.12.2023 /1230 lt
H ROB (all let go) / LS-MGO (Mt) 30.6
ROB (all let go) ME NS Cylinder / ME LS
I 3060
Cylinder Oil (Ltr)
J ROB (Cosp) / LS-MGO (Mt) 30.3 / 0.4 /
ROB (Cosp) ME NS Cylinder / ME LS Cylinder
K --
Oil (Ltr)
L ROB ME System / DG System Oil (Lt)
Received Original B/L - Number / MR / Manifest
M --
/ SOF
Any Protest Given / Stevedor Damage / L.O.A.
N yes
Given
O FW Suplied / Bunker Suplied / Rcvd CTM 15.0 mt / 0/0
P Distance to Go (nm) / Estimated Steaming Time 745/ 84,6HUR
Estimated Bunker Consumption During Sailing
Q 0 / 0 / 19.6 M.T
NS-IFO / LS-IFO / LS-MGO (Mt)
Next Port of Call / ETA – Date / Time (LT) / ZD
R Istanbul/02.01.2024/0400 iagw &wp
(If different from destination port)
S Destination Port / ETA (GMT) order

T Remarks

Departure report 29.12.2023

You might also like