The cargo of 4,879.053 metric tons of soybeans in bulk was loaded onto the ship at El Dekheila, Egypt on December 28, 2022 at 06:45 LT. All formalities and documents were completed by 1645 LT that day. The ship departed with 2 tugs and had departure drafts of 2.20 meters forward, 3.20 meters mid, and 4.20 meters aft. The ship is estimated to arrive in Istanbul, Turkey on January 2, 2024 at 0400 LT after steaming 745 nautical miles over 84.6 hours.
The cargo of 4,879.053 metric tons of soybeans in bulk was loaded onto the ship at El Dekheila, Egypt on December 28, 2022 at 06:45 LT. All formalities and documents were completed by 1645 LT that day. The ship departed with 2 tugs and had departure drafts of 2.20 meters forward, 3.20 meters mid, and 4.20 meters aft. The ship is estimated to arrive in Istanbul, Turkey on January 2, 2024 at 0400 LT after steaming 745 nautical miles over 84.6 hours.
The cargo of 4,879.053 metric tons of soybeans in bulk was loaded onto the ship at El Dekheila, Egypt on December 28, 2022 at 06:45 LT. All formalities and documents were completed by 1645 LT that day. The ship departed with 2 tugs and had departure drafts of 2.20 meters forward, 3.20 meters mid, and 4.20 meters aft. The ship is estimated to arrive in Istanbul, Turkey on January 2, 2024 at 0400 LT after steaming 745 nautical miles over 84.6 hours.
The cargo of 4,879.053 metric tons of soybeans in bulk was loaded onto the ship at El Dekheila, Egypt on December 28, 2022 at 06:45 LT. All formalities and documents were completed by 1645 LT that day. The ship departed with 2 tugs and had departure drafts of 2.20 meters forward, 3.20 meters mid, and 4.20 meters aft. The ship is estimated to arrive in Istanbul, Turkey on January 2, 2024 at 0400 LT after steaming 745 nautical miles over 84.6 hours.
B COMPLETED LOADING 28.12.2022 / 06.45 L.T (LT) / ZD Name of Cargo Cargo Qtty Loaded / Discharged B/L Figure Soya Beans in Bulk 4879.053 M.T C Shore Scale Draft Survey Figure Formalities Completed (All Documents On D Board) / POB / all let go / Pilot Off – Date and / 15.45 / 1600 /1615 / 1645/ 28.12.2023 Time (LT) E Number of Tugs Used 2 F Departure Drafts (F-M-A) / Density 2.20 M / 3.20 M / 4.20 M / 1.025 G Commence of Sea Passage – Date and Time (LT) 29.12.2023 /1230 lt H ROB (all let go) / LS-MGO (Mt) 30.6 ROB (all let go) ME NS Cylinder / ME LS I 3060 Cylinder Oil (Ltr) J ROB (Cosp) / LS-MGO (Mt) 30.3 / 0.4 / ROB (Cosp) ME NS Cylinder / ME LS Cylinder K -- Oil (Ltr) L ROB ME System / DG System Oil (Lt) Received Original B/L - Number / MR / Manifest M -- / SOF Any Protest Given / Stevedor Damage / L.O.A. N yes Given O FW Suplied / Bunker Suplied / Rcvd CTM 15.0 mt / 0/0 P Distance to Go (nm) / Estimated Steaming Time 745/ 84,6HUR Estimated Bunker Consumption During Sailing Q 0 / 0 / 19.6 M.T NS-IFO / LS-IFO / LS-MGO (Mt) Next Port of Call / ETA – Date / Time (LT) / ZD R Istanbul/02.01.2024/0400 iagw &wp (If different from destination port) S Destination Port / ETA (GMT) order