Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SANITATION STANDARD 1.

Plans and specifications of the water purification signed


and sealed by a licensed Sanitary Engineer (RA 1364)
RETAIL WATER SYSTEM (RWS) 2. Design was environmentally sound, ecologically safe,
OR REFILLING STATION cost efficient, based on the characteristic of source
water and the available water purification technology.
3. Water processing constructed/installed as per approved
ITEM No. I: QUALITY OF SOURCE WATER design and operation. No by-pass in any of the
1. Source water from: operations.
a. Public Water Supply System (MWSS, Water 4. Air filtration included in the multi-stage water
District, Community Water Supply System, Rural purification process.
Water Supply, Barangay Waterworks): 5. Product water No Residual of disinfectant.
1) Certificate of 6. Parts of the equipment (cartridges, membranes, pumps,
Potability of Drinking Water (CPDW) etc.) used, replaced as per manufacturers’ requirements.
issued by the Local Health Office (LHO). 7. Hazard Analysis Critical Control Point (HACCP) Plan,
2) Results of the GMP and appropriate water quality monitoring program
Validation Sample of Water from DOH- being implemented in all the CCPs of the water
accredited laboratory (bacteriological, processing.
biological, physical, chemical and 8. Product water complying with the PNSDW.
radiological); Date of sample shall not be
more than one month old. ITEM No. 5: FILLING AND CAPPING
a. Private Water Supply System: 1. Filler not located adjacent to windows or openings.
1) Operational Permit 2. Filler thoroughly cleaned and sanitized in-place and/or
(OP) from the Regional Health Director, and disassembled for cleaning and sanitizing before being
2) CPDW from the used.
Local Health Office. 3. Using DOH-approved cleaning solution or process.
a. Water Tankers and Containers: 4. Using DOH-approved sanitizing solution or process.
1) Copy of the 5. Filler thoroughly rinsed internally and externally with
requirements of “1.a or 1.b”, product water every after filling operation.
depending on the source of 6. Rim of container when filling pointed directly to the
water, and water-dispensing nozzle during filling.
7. Refilled containers immediately capped after filling.
2) Copy of Sanitary
Clearance of water tankers and/or
ITEM No. 6: CONTAINERS, CAPS AND DISPENSERS
container
1. Only EHS-DOH-certified containers, caps and water
vending machines or water dispensers (any model, with
ITEM No. 2: QUALITY OF REFILLED/PRODUCT
or without cooler or heater) allowed for use by the
WATER
refilling station.
1. Complete Results of Water Analysis from DOH-
2. Use of “Sanitary Cap” or other DOH-approved caps
Accredited Laboratory, analyzed and noted by a
(disposable) for every 5-gallons bulk water container.
government employed Sanitary Engineer of the DOH or
3. 31/2-gallons water containers and 5-gallons-Bulk water
the LHO; results complying with the Philippine
containers provided with handle or “ears” or carrying
National Standards for Drinking Water.
strand attached to the bottle.
Parameters Initial Result Subsequent Result
4. During deliveries, bulk water containers carried only
a. Bacteriological Not more than Not more than
with the use of a container’s grabber or handler.
one month old one month old
5. All water vending machines or dispensers using the
b. Physical -do- Every 6 months
bulk water container provided with “Sanitary Dispenser
c. Chemical -do- -do-
Shield” or equivalent DOH-approved apparatus, if
d. Biological -do- Once a year
provided.
e. Radiological - do- Upon the advice
* Dispensers placed in public places, other than food
of DOH/LHO
establishments, with Sanitary Permit from the LHO.
ITEM 3: PROTECTION OF PRODUCT WATER
ITEM No. 7: WASHING AND SANITIZING
1. Product water protected from all contaminants.
1. All containers and caps from customers and for delivery
2. No room or space used in connection with the
thoroughly washed and sanitized by the establishment
purification of water, handling, capping, sealing,
(RWS) before refilling them with water.
storage, sale, etc.:
2. No Residual of disinfectant, oxidant or sanitizer in all
a. Used as sleeping quarter
the containers and caps.
b. Directly connected to a toilet
3. Only DOH-approved cleaning solution or process used.
c. Animals is kept
4. Only DOH-approved sanitizing solution or process used
1. Persons not directly involved in the water processing
5. Product water used for rinsing.
not allowed in the service spaces (including children).
6. Adequate draining of containers and caps employed.
2. No display or storing or sale of other items (groceries,
dry goods, cosmetics, etc.) other than the RWS
ITEM No. 8: STORAGE OF WATER
materials.
1. Design, specification and location of
3. Filling of containers with water without hand contact.
tank/sump/reservoir before its construction/installation
4. Empty containers and refilled containers placed in
approved by the LHO as recommended by the SE.
slated platform with height of 20 cm.
2. Steel Tanks:
a. DOH-certified water steel tanks; made of
ITEM No. 4: WATER PURIFICATION PROCESS
non-toxic materials, durable, corrosion-resistant,
non-absorbent, smooth, easily cleaned surface.

1
b. Soldering joints per approved DOH b. Painted or finished light with colored
materials and procedure. materials
c. Provided with manhole/opening, drainpipe, c. All angles between floor and walls rounded
vermin proofed vent and inlet and outlet pipes. off to a height of 7.62 cm
1. Concrete Sumps, Tanks, and Reservoirs: d. All angles between walls and ceilings sealed
a. Tested for water tightness. e. Walls of toilets and other rooms subject to
b. Internal construction materials approved by wetting constructed of impervious materials to a
the LHO as recommended by the SE. height not less than 2 m from the floor.
1. All water storage facilities cleaned and sanitized at least 1. Ceilings: constructed of smooth, non-absorbent
once a month. materials; painted light color.
2. Refilled Water in Containers: 2. Doors: self-closing, tight fitting with smooth and non-
a. Container with refilled water stored in a absorbent surfaces.
separate storage room. 3. Lighting: all rooms provided with 20 foot-candle
b. Storage of refilled water not beyond 24- (215.20 lux) illumination intensity.
hours holding time. 4. Ventilation:
a. Each personnel provided with 12 cubic
ITEM No. 9: TRANSPORT OF PRODUCT WATER meter room volume and minimum of 3 air
1. All delivery vehicles with Sanitary Clearance from the exchanges per hour:
LHO; approved sanitary transporting facilities and 1) Windows & other opening – 10%
maintained clean and sanitary all the time. of floor area
2. Sanitary Clearance posted in delivery vehicles. 2) Mechanical Ventilation – air-
3. All refilled water containers properly capped, arranged conditioner, exhaust fan & blower
crated or boxed. No other product or material inside the a. Selling, Filling & Water Purification Rooms
delivery vehicle. – preferably air-conditioned
4. Water in delivery vehicles maintained at 25C-28C b. All rooms provided with odor absorber or
temperature. air purifier
1. Changeroom:
ITEM No. 10: ROOM/FACILITY AREA a. All refilling stations provided with suitable
ALLOCATION lockers or other facilities for storage of clothing
1. All refilling stations provided with refilling and selling and personal belongings of employees.
room, enclosed water purification room, container b. Facilities situated and arranged that there is
washing and sanitizing room, separate storage room for no contamination of refilled water.
empty and refilled containers, source water storage c. No clothing, gowns aprons, etc. placed in
facility and toilet room. other rooms or areas other than the facilities
2. Room/Facility Area Allocation: mentioned
a. Refilling & Selling Room – 9.50 sqm (min.) d. Street clothes not use as working apparel.
b. Water Purification Room – 3.10 sqm per e. Separate changeroom for establishment
person (clear of all equipment) employing more than 5 or more employees of
c. Container Storage Room (separate for empty either sex.
and filled Containers) – sufficient area per f. Changeroom cleaned daily and disinfected
approved plan once a week.
d. Source Water Storage Facility – sufficient ITEM No. 12: MAINTENANCE OF PREMISES
space to allow free movement during inspection 1. No alteration, renovation additional construction, in any
e. Office Space – 1.77 sqm per person (clear of of the rooms/facility of the establishment without a up-
all furniture and equipment) to-date Building Permit and an amended Sanitary
f. Changeroom – 2.80 sqm per person Permit.
(inclusive of lockers or other facilities 2. No alteration, addition, deletion or any change in the
g. Toilet Room – per toilet structural water purification process without an approved plan
requirement from the LHO.
h. Parking Area (optional) – 30 sqm plus 10 3. Repairs of structural, plumbing and drainage carried out
sqm for each additional car without delay.
No substitute for the abovementioned area allocations. 4. Defective or damaged receptacles, appliances, furniture
1. Filling, selling and water purification rooms under or equipment discarded and replaced or repaired as
positive pressure of purified air. required.
2. All doors and partitions made of see-through materials 5. Rooms and premises maintained in tidy condition and
(glass, DOH-approved plastic). free from accumulation of refuse and/or wet flooring.
3. All customer service opening designed to minimize the 6. Premises, equipment, furniture, etc. maintained in clean
entrance of contaminants and pests. and sanitary condition.

ITEM No. 11: CONSTRUCTION OF PREMISES ITEM No. 13: TOILET FACILITIES
1. Floors: 1. Adequate and clean toilet facilities provided to
a. Constructed of impervious, non-skid easily employees of refilling station:
cleaned materials. a. 5-29 employees – 1 wc for men & 1 wc for
b. Adequately graded and drained. women
c. “Close-type” floor drain provided in store or b. 30-49 employees – 1 wc & 1 urinal for men
selling area. & 2 wc for women
1. Walls: c. 50 – 99 employees – 2 wc & 1 urinal for
a. Internal surfaces – smooth, even, non- men and 2 wc for women
absorbent and easily cleaned materials. d. For every 100 – up – 1 fixture for every 50
employees

2
1. Toilet room completely enclosed, properly lighted (10 lining bag) and one for non-biodegradable (black color
foot-candle or 107.6 lux) and ventilated (25% of floor lining bag)
area or exhaust fan provided connected to the lighting 2. All refuse materials handled in such a manner as to
switch for windowless toilet). avoid contamination of water
2. Refilling station employing less than 5 personnel 3. Receptacle for sanitary napkin provided in women’s
provided with one water closet. toilet room.
3. Toilet plan approved by the LHO as recommended by 4. All refuse segregated at source, stored, collected,
the SE: transported and disposed in a sanitary and approved
a. Minimum space requirements: procedure
1) Water closet – 1.50 sqm
2) Urinals – 1.11 sqm ITEM No. 18: VERMIN CONTROL
3) Shower – 1.11 sqm 1. Absence of mice, rats, flies, mosquitoes, roaches and
1. 1 service sink or 1 curved cleaning facility equipped other vermin in the rooms and premises
with floor drain provided. 2. Vermin abatement program approved by LHO and
maintained by operator
ITEM No. 14: HANDWASHING FACILITIES 3. Procedure and frequency of pest control operation
1. Adequate and clean handwashing facilities provided to approved by LHO
employees of refilling stations: 4. Pest Control conducted by DOH-accredited urban pest
a. 5 – 29 employees – 1 lavatory for men & 1 control operator
lavatory for women
b. 30 – 40 employees – 2 lavatory for men and ITEM No. 19: PERSONNEL REQUIREMENTS
2 lavatory for women 1. Refilling station being managed by a plant
c. 50 – 99 employees – 3 lavatory for men and manager/supervisor who passed the 40-hour basic
3 lavatory for women certification course for water operators or a SE or a
1. Handwashing facility located inside or adjacent the person who has completed the entire required subject
toilet. for the course.
2. Minimum space requirement – 1.11 sqm 2. All other personnel completed the 20-hour training
3. Refilling station employing less than 5 personnel conducted by the LHO for water sanitation.
provided with one handwashing facility. 3. All personnel of the establishment possess up-to-date
4. Provided with nailbrush, soap or hand cleaner/sanitizer health certificates
and hand dryer. 4. All personnel wear their HC in their working garment
5. All personnel observing good personal hygiene
ITEM No. 15: SANITARY PLUMBING completed the 20-hour training conducted by the LHO
1. The plumbing system, water piping, connections, for water sanitation.
fittings and hoses conveying water constructed, 6. All personnel of the establishment possess up-to-date
installed and repaired with in accordance with the health certificates
NPCP and the NBC (PD 1096) 7. All personnel have their HC clipped in their garment
2. Source water lines protected from contamination; no while working
cross connection 8. All personnel wearing uniform
3. Water supply for the purification equipment protected 9. All personnel using/wearing the required PPE (e.g.
from backflow and backpressure from in-machine water cough/sneeze mask, hair restrain, etc.)
4. Air gap between the water supply inlet and flood rim of 10. Personnel working in the water purification room
plumbing fixture, equipment or non-water equipment at using water-resistant shoes (not worn outside)
least 2 x the diameter of the water supply inlet or as per 11. No person afflicted with a communicable disease or
the NPCP carrier of such disease handling water processing and
5. All piping and fitting materials (metal and plastic) vending activities
DOH-certified/approved 12. All personnel working in the establishment not subject
6. Distribution system provided with isolation valves in to undue stresses to the musculo-skeletal system
branch lines or grid lines 13. All personnel observing good personal practices
7. Appropriate control and regulating valves, backflow 14. All personnel observing good personal hygiene.
prevention and conditioning devices installed
8. Water piping system designed on the basis of the ITEM No. 20: MISCELLANEOUS
minimum pressure available in the locality 1. Sanitary Permit displayed in a conspicuous place in the
9. No booster, pneumatic, pressure or other pumps establishment
connected to the main water line. 2. Sanitation Standard Rating Sticker (SSRS) attached to
the window or door of the establishment or in a
ITEM No. 16: LIQUID WASTE MANAGEMENT conspicuous part of the establishment for public
1. Plan of individual sewage disposal system, sub-surface guidance
absorption system or secondary or other wastewater 3. Other documents available upon inspection (e.g.
device approved by the Local Health Officer as approved plan of the establishment, approved design of
recommended by the SE. the water purification plant, recent result of water
2. Separate primary wastewater treatment facilities analysis, copy of DOH-certified equipment, containers,
constructed for domestic waste and graywater. caps, dispensers, Sanitary Clearance for delivery
3. Graywater from the purification process recycled and vehicles, etc)
reused 4. Others.
4. Adequate drainage facilities provided in the premises.

ITEM No. 17: SOLID WASTE MANAGEMENT


1. Refilling station provided with 2 receptacles in all
rooms and premises, one for biodegradable (green color

You might also like