HARGA BAHAN

NO JENIS BAHAN SATUAN


Rp.

BAHAN AGREGAT KASAR, BAHAN


PEREKAT DAN BAHAN JADINYA
Pasir Urug m3 70,000.00
Sirtu m3 150,000.00
Pasir Pasang m3 240,000.00
Pasir Beton m3 250,000.00
Batu Pecah Mesin 1/2 m3 250,000.00
Batu Pecah Mesin 2/3 m3 250,000.00
Batu Pecah Mesin 3/5 m3 250,000.00
Batu Pecah Mesin 5/7 m3 250,000.00
Batu Belah Pondasi m3 175,000.00
Batu Tempel Hitam m2 80,000.00
Bata merah kelas I bh 500.00
Inter Blok Natural 6 cm m2 25,000.00
Paving Blok natural 8 cm m2 28,000.00
Paving Blok Warna 6 cm m2 30,000.00
Kanstin Paving Blok m1 30,000.00
Glass Block m2 15,000.00
Semen PC Tiga Roda / 50 kg zak 40,000.00
Semen Putih kg 3,500.00
Semen warna kg 3,500.00
Aspal (ESO) 1 Drum 150 kg kg 8,000.00

BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA
Plamir Tembok Ex. Paragon kg 18,000.00
Cat Tembok Sanlex kg 5,100.00
Rool Cat Tembok bh 15,000.00
Kape Tembok bh 5,000.00
Kape Kayu bh 5,000.00
Soligneum 1 Blek 5 ltr 12,000.00
Kwas 3 " bh 7,500.00
Otem (Pewarna Plitur) bks 1,000.00
Spirtus ltr 2,500.00
Bahan Plitur Kripik (Sirlak India) kg 6,000.00
Dempul Halus/ Infra (Wood Filler)/Impra kg 21,500.00
Terpentin ltr 2,000.00
Tiner ltr 18,000.00
Ampelas lbr 2,500.00
Dempul Kayu Cap Kucing kg 9,500.00
Dempul Kayu Avian kg 6,000.00
Meni Kayu/ Besi kg 20,000.00
Sincromat kg 60,000.00
Cat Kayu pinoguar kg 24,000.00
Cat Besi Seiv kg 60,000.00
Cat Kayu Avian kg 45,000.00
Cat Besi Duco Danaglos / ICI kg 130,000.00
Lem Kayu Putih (Fox) kg 8,500.00
Lem Kayu Kuning (AIBON) kg 14,000.00

BAHAN KAYU BERIKUT BAHAN JADINYA


Kayu Terentang m3 310,000.00
Kayu Balok Borneo Super m3 1,700,000.00
Kayu papan Borneo Super m3 1,700,000.00
Kayu kaso 5/7 Borneo Super m3 1,700,000.00
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
Kayu 5/10 kayu awet kls I m3 1,700,000.00
Kayu Awet Kls I m3 1,250,000.00
Kayu KAMPER m3 3,600,000.00
Kayu Balok Rasamala m3 2,100,000.00
Kayu papan Rasamala m3 2,100,000.00
Kayu Balok Kamper Medan (Kruing) m3 1,600,000.00
Kayu Papan Kamper Medan (Kruing) m3 1,600,000.00
Kayu Balok Kamper Banjar m3 2,100,000.00
Kayu Papan Kamper Banjar m3 2,100,000.00
Kayu Balok Kamper Samarinda m3 5,500,000.00
Kayu Papan Kamper Samarinda m3 5,500,000.00
Kayu Jati jabar m3 7,000,000.00
Dolken 5 s/d 7 bt 7,000.00
Dolken 7 s/d 10 / kaso 4/6 untuk stootwork bt 11,500.00
List Profil kamper 1 cm m1 1,000.00
List Profil kamper 2 cm (45x45) m1 2,750.00
Kayu Reng 2/3 Borneo Super m1 1,500.00
Kayu Reng 3/4 Borneo Super m1 3,000.00
kayu ulin m3 1,650,000.00

BAHAN PENUTUP RANGKA PLAPON


Bahan Plapon Eternit 4 mm lbr 42,500.00
Kalsiboard lbr 38,000.00
List Kayu 4 / 4 btng 18,000.00
List Kayu 5 / 5 btng 27,000.00
Gypsum 9 mm lbr 75,000.00

BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240 lbr 33,000.00
Triplek 4 mm 120 x 240 lbr 39,000.00
Triplek 6 mm 120 x 240 lbr 42,000.00
Multiplek 12 mm 120 x 240 lbr 112,500.00
Multiplek 12 mm ukuran pintu lbr 236,250.00
Teak Wood 4 mm 120 x240 lbr 75,000.00
Formika lbr 69,000.00

BAHAN LANTAI DAN PELAPIS DINDING


Keramik lantai 20 x 20 Putih Polos "MULIA" m2 45,000.00
Keramik dinding 20 x 25 Putih Polos "MULIA" m2 48,000.00
Keramik 30X30 Putih Polos "MULIA" m2 46,000.00
Lantai Pear Stone m2 89,000.00
Floor Hardener Ferofax sekualitas Metaltop kg 60,000.00

G. BAHAN SALURAN AIR KOTOR / BERSIH


Grafel U 20 cm m' 20,000.00
Grafel U 30 cm m' 30,000.00
Buis Beton dia. 20 cm ( 1 m ) m' 45,000.00
Buis Beton dia.30 cm (1 m ) m' 60,000.00

BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata-rata kg 14,000.00
Pagar BRC T.120 Lengkap Tiang m1 132,000.00
Pagar BRC T.175 Lengkap Tiang m1 612,500.00
Besi Canal kg 14,000.00
Besi Siku L kg 14,000.00
Besi IWF DN SII kg 14,000.00
Besi HWF kg 14,000.00
Besi plat kg 14,000.00
Kawat Beton kg 19,500.00
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
Kawat Duri kg 12,500.00
Seng plat BJLS 28 ( lebar = 90 cm ) m1 35,000.00
Seng Glb BJLS 28 lbr 20,500.00
Ram kawat m2 35,000.00

BAHAN KACA
Kaca polos 3 mm (ASAHI) m2 57,000.00
Kaca polos 5 mm (ASAHI) m2 65,000.00
Cermin m2 89,000.00

BAHAN PAKU DAN MUR BAUT


Paku biasa kg 15,000.00
Paku hak Pj. 15 cm bh 6,000.00

BAHAN PERPIPAAN
Pipa GIP Medium B dia. 1/2" bt 17,000.00
Pipa GIP Medium B dia. 3/4" bt 23,000.00
Pipa GIP Medium B dia. 1" bt 25,000.00
Pipa GIP Medium B dia. 1 1/2" bt 43,000.00
Pipa GIP Medium B dia. 2" bt 60,000.00
Pipa PVC MASPION ABU dia. 2" (AW) bt 75,000.00
Pipa PVC MASPION ABU dia. 3" (AW) bt 140,000.00
Pipa PVC MASPION ABU dia. 4" (AW) bt 230,000.00
Grefel beton 1/2 dia. 30 cm m1 30,000.00

BAHAN SANITAIR DAN PERPIPAAN


Stop Kran 3/4 " KIT bh 75,000.00
Stop Kran 1 1/2 " KIT bh 125,000.00
Kran bebek Sun Ei 1/2 " bh 85,000.00
Floor drain bh 20,000.00
Wastafel Lengkap Toto Type L 34 bh 350,000.00
Closet Jongkok Standard Putih Poslin INA unit 125,000.00
closet duduk ex toto unit 1,050,000.00
kran air 1/2" bh 37,300.00
shower unit 250,000.00
kichensink unit 250,000.00

BAHAN PENUTUP ATAP


Genteng Palentong bh 1,000.00
Wuwung Genteng bh 18,500.00
Atap genteng Morando glazur bh 2,000.00
Wuwung Genteng morando glazur bh 4,000.00
Genteng Ex KIA (11 bh ) m2 58,685.00

BAHAN ELEKTRIKAL
Saklar Broko Tunggal Standard (1Phase) bh 16,000.00
Saklar Broko Seri Standard (1 Phase) bh 16,000.00
Stop Kontak Broko Standard (1 Phase) bh 9,000.00
Lampu Neon TL Philip 1 X 36 W Type TKI bh 17,500.00
Pentanahan Penangkal Petir lengkap bak kontrol ttk 900,000.00
pipa kabel bt 8,000.00
Kabel NYY 2 X 2,5 mm Prima m1 4,000.00
Kabel NYY 3 X 2,5 mm Prima M1 5,000.00
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.

BAHAN ALAT PENGGANTUNG DAN KUNCI


Kunci 2 Slaag bh 75,000.00
Kunci KM Bulat ALPA bh 75,000.00
Espanyolet/Slot Tanam bh 30,000.00
Hak Angin Kait Jendela Biasa ( Kait ) bh 15,000.00
Engsel Pintu Arch Standard bh 6,000.00
Engsel Jendela Arch bh 4,000.00
Pasang roda type 61. K/ N ex Henderson bh 65,000.00

BAHAN PENGHISAP AIR SUMUR DALAM


Mesin Pompa Air 400 W - Sanyo unit 650,000.00

BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3 ( Pinguinl ) bh 1,200,000.00
Tangki Air Fiber Glass 2000 liter ( Pinguinl ) bh 1,900,000.00
Bak km Fiber 50 X 50 bh 125,000.00
ANALISA HARGA SATUAN PEKERJAAN

HARGA HARGA HARGA


SATUAN SEWA SATUAN JUMLAH BAHAN JUMLAH SEWA JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN ALAT
BAHAN ALAT UPAH
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
A B C D E F G H=(CXE) I=(C X F) J=(C X G) K= ( H+I+J )

I PERJAAN PERSIAPAN
1 Pembebasan lahan 150,000.00 150,000.00
2 Pengukuran Kembali dan Pemasangan Bouwplank
Tenaga
Pekerja 0.1000 OH 61,000.00 6,100.0000
Tukang Batu 0.1000 OH 73,000.00 7,300.0000
Kepala tukang 0.0100 OH 80,000.00 800.0000
Mandor 0.0050 OH 87,500.00 437.5000
Bahan
Kayu Kelas II 0.0120 m3 3,500,000.00 42,000.00
Paku Biasa 5 - 10 Cm 0.0200 Kg 15,000.00 300.00
Papan Kayu klas II 0.0070 m3 3,100,000.00 21,700.00
64,000.00 14,637.50 78,637.50

II PEKERJAAN TANAH
1 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 1 meter
Tenaga
Pekerja 0.9000 OH 61,000.00 54,900.00
Mandor 0.0450 OH 87,500.00 3,937.50
Peralatan
Excavator 80-140 HP 0.0186 Jam 679,010.00 12,629.59
Bulldozer 100-150 HP 0.0145 Jam 592,207.00 8,587.00
Alat bantu 0.01 Jam 50,000.00 500.00
21,716.59 58,837.50 80,554.09

III PEKERJAAN PONDASI DAN TELFORD


1 Pek.Telford Lapisan batu kali (tebal 30 cm) 174,923.00 17,478.63 80,893.75 273,295.37
Tenaga
Pekerja 1.2375 OH 61,000.00 75,487.50
Mandor 0.0375 OH 87,500.00 3,281.25

Analisa Harga Satuan


Halaman 5
HARGA HARGA HARGA
SATUAN SEWA SATUAN JUMLAH BAHAN JUMLAH SEWA JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN ALAT
BAHAN ALAT UPAH
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
A B C D E F G H=(CXE) I=(C X F) J=(C X G) K= ( H+I+J )

Oprator Alat Berat 0.0125 OH 170,000.00 2,125.00


Bahan
Batu belah (quarry - lokasi pekerjaan) 0.625 m3 200,700.00 125,437.50
Produksi batu pecah 50-70 mm 0.25 m3 197,941.98 49,485.50
Peralatan
Three wheel roller 6-8 ton 0.0625 Jam 239,658.00 14,978.63
Alat bantu 0.05 Jam 50,000.00 2,500.00
2 Pek.Telford (Pasir Urug) 80,937.50 17,478.63 80,893.75 179,309.88
Tenaga
Pekerja 1.2375 OH 61,000.00 75,487.50
Mandor 0.0375 OH 87,500.00 3,281.25
Oprator Alat Berat 0.0125 OH 170,000.00 2,125.00
Bahan
Pasir urug (quarry - lokasi pekerjaan) 0.625 m3 129,500.00 80,937.50
Peralatan
Three wheel roller 6-8 ton 0.0625 Jam 239,658.00 14,978.63
Alat bantu 0.05 Jam 50,000.00 2,500.00
3 Pek.Telford Lapisan sirtu (pasir batu) 111,360.50 17,478.63 80,893.75 209,732.87
Tenaga
Pekerja 1.2375 OH 61,000.00 75,487.50
Mandor 0.0375 OH 87,500.00 3,281.25
Oprator Alat Berat 0.0125 OH 170,000.00 2,125.00
Bahan
Pasir urug/ timbunan 0.625 m3 99,000.00 61,875.00
Produksi batu pecah 50-70 mm 0.25 197,941.98 49,485.50
Peralatan
Three wheel roller 6-8 ton 0.0625 Jam 239,658.00 14,978.63
Alat bantu 0.05 Jam 50,000.00 2,500.00

Pek.Telford Pasangan pondasi batu belah untuk


4 drainase campuran 1 PC : 3 Psr 339,060.00 17,478.63 80,893.75 437,432.38
Tenaga
Pekerja 1.2375 OH 61,000.00 75,487.50
Mandor 0.0375 OH 87,500.00 3,281.25
Oprator Alat Berat 0.0125 OH 170,000.00 2,125.00
Bahan
Batu belah uk. 15-20 cm 1.2 m3 200,000.00 240,000.00
Semen Portlan (PC) (50 kg) 2.02 kg 1,500.00 3,030.00

Analisa Harga Satuan


Halaman 6
HARGA HARGA HARGA
SATUAN SEWA SATUAN JUMLAH BAHAN JUMLAH SEWA JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN ALAT
BAHAN ALAT UPAH
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
A B C D E F G H=(CXE) I=(C X F) J=(C X G) K= ( H+I+J )

Pasir pasang 0.485 m3 198,000.00 96,030.00


Peralatan
Three wheel roller 6-8 ton 0.0625 Jam 239,658.00 14,978.63
Alat bantu 0.05 Jam 50,000.00 2,500.00

IV PEKERJAAN PERKERASAN 13,384.38 5,354.64 80,893.75 99,632.77


1 Pek.Lapisan Pengikat Prime Coat(Aspal Drum)
Tenaga
Pekerja 1.2375 OH 61,000.00 75,487.50
Mandor 0.0375 OH 87,500.00 3,281.25
Oprator Alat Berat 0.0125 OH 170,000.00 2,125.00
Bahan
Aspal drum 0.7251 Kg 11,170.00 8,099.37
Minyak tanah 0.396 Ltr 13,346.00 5,285.02
Peralatan
Asphalt sprayer 850 ℓ 0.02 Jam 75,045.00 1,500.90
Compressor 4000-6500 ℓ\m 0.02 Jam 192,687.00 3,853.74

V PEKERJAAN TROTOAR
1 Pasang paving block 1,840.00 50,992.50 52,832.50
Paping blok/conblok T = 6 cm 1.0000 m3 1,840.00 1,840.00
Tenaga
Pekerja 0.7800 OH 61,000.00 47,580.00
Mandor 0.0390 OH 87,500.00 3,412.50
2 Pemasangan Kerb 45,000.00 50,992.50 95,992.50
Kerb 1.0000 m3 45,000.00 45,000.00
Tenaga
Pekerja 0.7800 OH 61,000.00 47,580.00
Mandor 0.0390 OH 87,500.00 3,412.50

3 Pekerjaan pemasangan penutup beton (precast)


untuk trotoar 130,000.00 50,992.50 180,992.50
Precast Beton 1.0000 m3 130,000.00 130,000.00
Tenaga
Pekerja 0.7800 OH 61,000.00 47,580.00
Mandor 0.0390 OH 87,500.00 3,412.50

Analisa Harga Satuan


Halaman 7
HARGA HARGA HARGA
SATUAN SEWA SATUAN JUMLAH BAHAN JUMLAH SEWA JUMLAH UPAH TOTAL HARGA
NO. URAIAN KEBUTUHAN INDEKS SATUAN ALAT
BAHAN ALAT UPAH
Rp. Rp. Rp. Rp. Rp. Rp. Rp.
A B C D E F G H=(CXE) I=(C X F) J=(C X G) K= ( H+I+J )

4 Pekerjaan urugan kembali 80,937.50 12,629.59 37,125.00 130,692.09


Pasir urug (quarry - lokasi pekerjaan) 0.625 m3 129,500.00 80,937.50
Tenaga
Pekerja 0.2500 OH 61,000.00 15,250.00
Mandor 0.2500 OH 87,500.00 21,875.00
Peralatan
Excavator 80-140 HP 0.0186 Jam 679,010.00 12,629.59
5 Pekerjaan tanah untuk median 80,937.50 12,629.59 37,125.00 130,692.09
Pasir urug (quarry - lokasi pekerjaan) 0.625 m3 129,500.00 80,937.50
Tenaga
Pekerja 0.2500 OH 61,000.00 15,250.00
Mandor 0.2500 87,500.00 21,875.00
Peralatan Jam
Excavator 80-140 HP 0.0186 679,010.00 12,629.59

VI PEKERJAAN FINSHING 6,290.00 50,992.50 57,282.50


1 PENGECATAN KERB m3
Cat tembok Metrolit 0.1700 37,000.00 6,290.00
Tenaga OH
Pekerja 0.7800 OH 61,000.00 47,580.00
Mandor 0.0390 87,500.00 3,412.50
2 Pengecatan Marka Jalan kg 313,623.35 50,000.00 43,706.25 407,329.60
Thermoplastic 5.0000 kg 58,000.00 290,000.00
Glass Beads 0.8333 kg 26,000.00 21,665.80
Cat Pemaking 0.0833 23,500.00 1,957.55
Tenaga OH
Pekerja 0.4000 OH 61,000.00 24,400.00
Tukang Cat 0.2250 OH 82,000.00 18,450.00
Kepala Tukang 0.0025 OH 80,000.00 200.00
Mandor 0.0075 87,500.00 656.25
Peralatan ls
Alat bantu 1.0000 50,000.00 50,000.00

Analisa Harga Satuan


Halaman 8
HARGA SATUAN UPAH

HARGA UPAH
NO. JENIS UPAH SATUAN
Rp.
1 2 3 4

1 Perkerja / Buruh tak terlatih 61,000.00 Org/Hr


2 Buruh terlatih 70,000.00 Org/Hr
3 Tukang Batu 73,000.00 Org/Hr
4 Tukang Besi 76,000.00 Org/Hr
5 Tukang Besi Konstruksi 85,000.00 Org/Hr
6 Tukang Cat 82,000.00 Org/Hr
7 Tukang Gali 64,000.00 Org/Hr
8 Tukang Kayu 78,500.00 Org/Hr
9 Tukang Listrik 78,500.00 Org/Hr
10 Tukang Las 79,500.00 Org/Hr
11 Kepala Tukang 80,000.00 Org/Hr
12 Mandor 87,500.00 Org/Hr
13 Operator kurang terlatih 99,000.00 Org/Hr
14 Operator alat berat 170,000.00 Org/Hr
15 Operator terlatih 122,500.00 Org/Hr
16 Supir truk 95,000.00 Org/Hr
17 Pembantu supir 65,000.00 Org/Hr
18 Tukang plituran 84,000.00 Org/Hr
HARGA SATUAN BAHAN

HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4

1 Aluminium foil @60 m 473,000.00 rol


2 Bak mandi fiber glass oval 120 ltr 390,000.00 bh
3 Bata merah 700.00 bh
4 Produksi batu pecah 50-70 mm 197,941.98 m³
5 Pasir urug (quarry - lokasi pekerjaan) 129,500.00 m³
6 Batu belah (quarry - lokasi pekerjaan) 200,700.00 m³
7 Batu belah uk. 15-20 cm 200,000.00 m³
8 Batu candi 123,000.00 m²
9 Rooster bata Uk. 12 x 22 untuk gapura (biasa) 4,500.00 bh
Besi siku L 50.50.5
7 Besi beton/Baja tulangan beton 13,500.00 kg
8 Besi U / langko kuda-kuda 41,000.00 kg
9 Besi Hollow 40/40 mm (pagar) 108,000.00 btg
10 Besi Hollow 20/40 mm (plapond) 31,500.00 btg
11 Besi Hollow 40/40 mm (plapond) 45,000.00 btg
12 Cat luar EMCO LUX warna sedang 108,000.00 kg
13 Cat meni Emco 73,000.00 kg
14 Cat tembok Metrolit 37,000.00 kg
15 Vernis / coating 84,000.00 kg
16 Closet duduk TOTO/INA 1,470,000.00 bh
17 Closet jongkok porselin merk INA / TOTO (putih) 335,000.00 bh
18 Engsel jendela nylon 38,000.00 bh
19 Engsel pintu nylon 52,000.00 bh
20 Grendel Tanam 76,000.00 bh
21 Genteng Natural Nok Bulat 3,600.00 bh
22 Genteng pres jatiwangi tipe Plentong Natural 2,350.00 bh
23 Grevel beton dia 1/2 dia. 20 cm 42,500.00 m'
24 Kabel NYM 3 x 2 1/2 - 50 m' 597,000.00 rol
25 Kaca polos tebal 3 mm 110,000.00 m²
26 Kaca polos tebal 5 mm 150,000.00 m²
27 Kait Angin 16,500.00 bh
28 Kawat beton 23,000.00 kg
29 Kayu dolken dia. 10 cm 16,000.00 btg
30 Kayu lokal kelas II 3,500,000.00 m³
31 Kayu lanan 6,530,000.00 m³
32 Kayu Stoot bekisting 1,980,000.00 m³
33 Kayu Usuk 5/7 lanan 6,530,000.00 m³
34 Kayu Reng 2/3 Lanan 6,530,000.00 m³
35 Kayu kaso 5/7 kelas II 2,625,000.00 m³
36 Kayu Reng 2/3 kelas II 2,900,000.00 m³
37 Keramik dinding 20/25 motif (KIA) 63,500.00 m²
38 Keramik dinding 25/40 motif (KIA) 66,000.00 m²
39 Keramik 20/20 anti slip 66,000.00 m²
40 Keramik Lantai 30/30 motif sekw. Mulia 62,000.00 m²
41 Keramik Lantai 30/30 putih sekw. Mulia 55,000.00 m²
42 Keramik Lantai 40/40 putih sekw. KIA 64,500.00 m²
43 Krikil beton (split) uk. 2-3 cm 405,000.00 m³
44 Kran dia. 1/2'' SAN''EI 81,500.00 bh
45 Kunci tanam besar merk Viali 142,000.00 bh
46 Kunci tanam sedang Js Itali 55,000.00 bh
47 Kunci anak tanam 150,000.00 bh
48 Pegangan Pintu (Hendel) 100,000.00 set
49 kwas 3" 10,000.00 bh

Halaman : 23
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4

50 Langko kuda-kuda 30,500.00 bh


51 Kunci sloot pintu / jendela 30,500.00 bh
52 Lem kayu fox 35,000.00 kg
53 List kayu profil 3 x 3 cm 18,000.00 btg
54 Minyak Bekisting 3,000.00 ltr
55 Paku biasa 1'' 24,000.00 kg
56 Paku biasa 2' - 5'' 15,000.00 kg
57 Paku Seng 29,000.00 kg
58 Paku skrup 1'' 400.00 bh
59 Panel Box Zekering / MCB 400,000.00 unit
60 Papan borneo / MC 5,720,000.00 m³
61 Papan gipsum (plapond) 9 mm 75,000.00 lbr
62 Papan Lanan 7,056,000.00 m³
63 Papan kayu lokal kelas II (mahoni) 3,100,000.00 m³
64 Papan terentang (Perancah/Acuan beton) 1,150,000.00 m³
65 Paping blok/conblok T = 6 cm 1,840.00 bh
66 Papan Calsiplank GRC (0,8x20)cm 45,000.00 btg
67 Pasir beton 270,000.00 m³

Halaman : 23
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4

68 Pasir pasang 198,000.00 m³


69 Pasir urug/ timbunan 99,000.00 m³
70 Plamir kayu tawon kensai 24,000.00 kg
71 Plamour tembok Viny paint 34,000.00 kg
72 Semen adepsip (Gip) 9,500.00 kg
73 Semen Portlan (PC) (50 kg) 75,000.00 zax
74 Semen Warna 16,000.00 kg
75 Seng Plat 0,3 (lebar = 55 cm) 31,000.00 lbr
76 Seng Plat 0,3 (lebar = 90 cm) 42,500.00 lbr
77 Sirtu tidak tersaring 108,000.00 m³
78 Tanah urug / bahan timbuhan tindihan 63,000.00 m³
79 Teakwood 0,9 x 2,2 x 3 mm ukuran pintu 120,000.00 lbr
80 Wastafel lengkap 650,000.00 bh
81 Lampu TL 20 watt komplit 65,000.00 bh
82 Lampu SL 14 watt (Philip) 56,000.00 bh
83 Besi Pipa dia. 6" Medium 2,931,500.00 btg
84 Pipa Paralon / PVC dia. 1/2" wavin type AW 28,600.00 btg
85 Pipa Paralon / PVC dia. 3/4" wavin type AW 34,700.00 btg
86 Pipa Paralon / PVC dia. 1" wavin type AW 35,200.00 btg
87 Pipe paralon / PVC dia. 2 1/2" wavin type D 78,100.00 btg
88 Pipa paralon /PVC dia. 4" wavin type D 163,900.00 btg
89 Lem PVC 12,000.00 tube
90 Seal Tape 4,500.00 bh
91 Plafond GRC Internal 4mm 71,000.00 lbr
92 Polywood 1.20 x 2 .40 cm 117,000.00 lbr
93 Kusen Alumunium 4" (silver) 100,000.00 m'
94 Kusen Alumunium 4" (coklat) 113,000.00 m'
95 Daun pintu rangka alumunium silver kaca bening 5 mm 2,345,000.00 unit
96 Daun pintu rangka alumunium coklat kaca bening 5 mm 2,479,000.00 unit
97 Daun jendela silver kaca bening 5 mm 827,000.00 unit
98 Daun jendela coklat kaca bening 5 mm 946,000.00 unit
99 Atap metal spandex 488,000.00 lbr
100 List gypsum 7 cm 20,000.00 m'
101 Pintu Fiber KM/WC 345,000.00 bh
102 Floor drain stainless 61,000.00 bh
103 Glass block 20 x 20 cm 33,500.00 bh
104 Rooster keramik 20/20 37,000.00 bh
105 Baja ringan 170,000.00 m²
106 Genting metal untuk konstruksi baja ringan 120,000.00 m²
107 Genting bubungan metal untuk konstruksi baja ringan 54,000.00 bh
108 Wiremesh di las 33,000.00 m²
109 Kunci Door Holder 215,000.00 bh
110 Kunci Door Stop 310,000.00 bh
111 Kunci Door Closer 300,000.00 bh
112 Urinoir (lengkap) 1,800,000.00 unit
113 Atap sirap 5 mm 165,000.00 ikat
114 Saklar single (broco) 16,000.00 bh
115 Saklar doble (broco) 20,000.00 bh
116 Stop kontak 18,000.00 bh
117 Dudukan lampu (downlight) 60,000.00 bh
118 Kasteen beton cetak P. 40 cm 51,500.00 bh
119 Aspal drum 11,170.00 kg
120 Minyak tanah 13,346.00 ltr
precest boton 130,000.00
kerb 45,000.00
termoplastic 58,000.00 kg
glass beast 26,000.00 kg
cat pemaking 23,500.00 kg

Halaman : 23
REKAPITULASI
RENCANA ANGGARAN BIAYA
PEMBANGUNAN JALAN TOL SUPER HIGHWAY BANDORASA
TAHUN ANGGARAN 2019

NAMA KEGIATAN : Pembangunan Jalan Desa Sindangsari


PERENCANA : Dinas Perumahan Permukiman dan Pertanahan
PELAKSANA : Dinas Perumahan Permukiman dan Pertanahan
LOKASI : Sindangsari, SindangAgung, Kuningan 45553, Jawa Barat

JUMLAH
NO. URAIAN
Rp.

1 2 3

I PEKERJAAN PERSIAPAN 23,550,000.00


II PEKERJAAN PEMBONGKARAN DAN GALIAN TANAH 119,840,500.00
III PEKERJAAN PONDASI BATU KALI 70,898,000.00
IV PEKERJAAN BETON 152,472,000.00
V PEKERJAAN PEMASANGAN DINDING PAGAR 69,510,000.00
VI PEKERJAAN FINISHING 24,950,000.00

JUMLAH 461,220,500.00
PPN 46,122,050.00
JUMLAH TOTAL 507,342,550.00
DIBULATKAN 507,342,000.00
TERBILANG : ( enam belas miliar enam puluh sembilan juta sembilan ratus tiga puluh tujuh ribu rupiah,- )

Kuningan, 2019

Menyetujui
Perencana Pemeriksa

Nadia Fatikasari Dias Ambarwati S.Pd


RENCANA ANGGARAN BIAYA
PEMASANGAN PAGAR AREA PARKIR RUKO
JL. PEMUDA RAWAMANGUN

NAMA KEGIATAN : Pemasangan Pagar Area Parkir Ruko


LOKASI : Jl. Pemuda Rawamangun

HARGA SATUAN JUMLAH


NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5

I PEKERJAAN PERSIAPAN

1 Pekerjaan Pengukuran dan Bowplank 100 m' 33,000.00 3,300,000.00

2 Pekerjaan Pembersihan Area Kerja 1 ls 1,750,000.00 1,750,000.00

3 Pekerjaan Pembuatan Pagar seng 100 m' 135,000.00 13,500,000.00

4 Mobilisasi 1 ls 5,000,000.00 5,000,000.00

Jumlah 23,550,000.00

II PEKERJAAN PEMBONGKARAN DAN GALIAN TANAH

1 Pekerjaan Pembongkaran Paving Blok Dan Kanstin 100 m³ 15,000.00 1,500,000.00

2 Pekerjaan Pembongkaran Pondasi dan pagar dinding existing 250 m2 45,000.00 11,250,000.00

3 Pekerjaan Galian tanah 625 m³ 75,000.00 46,875,000.00

4 Pekerjaan Buangan Tanah 208.3 m³ 35,000.00 7,290,500.00

5 Pekerjaan Urugan Tanah Kembali 417 m³ 25,000.00 10,425,000.00

6 Pekerjaan Cerucuk Bambu 100 m' 175,000.00 17,500,000.00

Hal : 14
HARGA SATUAN JUMLAH
NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5

7 Pekerjaan Penahan Tanah Sementara 100 m' 250,000.00 25,000,000.00

Jumlah 119,840,500.00

III PEKERJAAN PONDASI BATU KALI

1 Pekerjaan Urugan Pasir T.10 cm 8 m³ 375,000.00 3,000,000.00

2 Pemasangan Aanstamping 16 m³ 278,000.00 4,448,000.00

3 Pemasangan Pondasi Batu kali 1 Pc : 3 Ps 120 m³ 485,000.00 58,200,000.00

4 Pemasangan Sparing Pipa 1,1/4 '' 300 titik 17,500.00 5,250,000.00

Jumlah 70,898,000.00

IV PEKERJAAN BETON

1 Pek. Pond. Footplat 1.2 mx1.2 mx0.4 m (K225, Besi 12mm) 11.52 m³ 2,550,000.00 29,376,000.00

2 Pek. Sloof uk. 0.2x0.4 m (besi 12mm, begel 8mm) 16.00 m³ 2,550,000.00 40,800,000.00

3 Pek. Kolom uk. 0.4x0.4 m (besi 12mm, begel 8mm 11.52 m³ 2,550,000.00 29,376,000.00

4 Pek. Begisting Kolom uk. 0.4x0.4 m 115.20 m³ 225,000.00 25,920,000.00

5 Pek. Begisting Sloof uk. 0.2x0.4 m 120.00 m2 225,000.00 27,000,000.00

Jumlah 152,472,000.00

V PEKERJAAN PEMASANGAN DINDING PAGAR

1 Pek.Dinding Bata Merah/Hebel 120 m2 147,000.00 17,640,000.00


Hal : 15
HARGA SATUAN JUMLAH
NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5

2 Pek.Plesteran Dinding 390 m2 86,000.00 33,540,000.00

3 Pek.Acian Dinding 390 m2 47,000.00 18,330,000.00

Jumlah 69,510,000.00

VI PEKERJAAN FINISHING

1 Pek.Pengecatan Dinding Pagar 390 m² 55,000.00 21,450,000.00

2 Pekerjaan finishing dan Pembersihan area kerja 1 LS 3,500,000.00 3,500,000.00

Jumlah 24,950,000.00

JUMLAH KESELURUHAN 461,220,500.00

NOTE :

*Harga Tidak Termasuk Koordinasi Lapangan

*Harga Tidak Termasuk pengadaan listrik dan air

Hal : 16
RENCANA ANGGARAN BIAYA
PEMASANGAN PAGAR AREA PARKIR RUKO
JL. PEMUDA RAWAMANGUN

NAMA KEGIATAN : Pemasangan Pagar Area Parkir Ruko


LOKASI : Jl. Pemuda Rawamangun

NO. URAIAN VOLUME

1 2 3

I PEKERJAAN PERSIAPAN

1 Pekerjaan Pengukuran dan Bowplank

2 Pekerjaan Pembersihan Area Kerja

3 Pekerjaan Pembuatan Pagar seng

4 Mobilisasi

Jumlah

II PEKERJAAN PEMBONGKARAN DAN GALIAN TANAH

1 Pekerjaan Pembongkaran Paving Blok Dan Kanstin

2 Pekerjaan Pembongkaran Pondasi dan pagar dinding existing

3 Pekerjaan Galian tanah

4 Pekerjaan Buangan Tanah

5 Pekerjaan Urugan Tanah Kembali

6 Pekerjaan Cerucuk Bambu

7 Pekerjaan Penahan Tanah Sementara

Jumlah

III PEKERJAAN PONDASI BATU KALI

1 Pekerjaan Urugan Pasir T.10 cm

2 Pemasangan Aanstamping
3 Pemasangan Pondasi Batu kali 1 Pc : 3 Ps

4 Pemasangan Sparing Pipa 1,1/4 ''

Jumlah

IV PEKERJAAN BETON

1 Pek. Pond. Footplat 1.2 mx1.2 mx0.4 m (K225, Besi 12mm)

2 Pek. Sloof uk. 0.2x0.4 m (besi 12mm, begel 8mm)

3 Pek. Kolom uk. 0.4x0.4 m (besi 12mm, begel 8mm

4 Pek. Begisting Kolom uk. 0.4x0.4 m

5 Pek. Begisting Sloof uk. 0.2x0.4 m

Jumlah

V PEKERJAAN PEMASANGAN DINDING PAGAR

1 Pek.Dinding Bata Merah/Hebel

2 Pek.Plesteran Dinding

3 Pek.Acian Dinding

Jumlah

VI PEKERJAAN FINISHING

1 Pek.Pengecatan Dinding Pagar

2 Pekerjaan finishing dan Pembersihan area kerja

Jumlah

JUMLAH KESELURUHAN

NOTE :

*Harga Tidak Termasuk Koordinasi Lapangan

*Harga Tidak Termasuk pengadaan listrik dan air


RUKO

HARGA SATUAN JUMLAH


Rp. Rp.
4 5

-
-

-
#VALUE!
0.2

Err:520

Err:520
Err:520