BAHAN FINISHING :
LABURAN , PENGISI DAN ALATNYA
Plamir Tembok Ex. Paragon kg 18,000.00
Cat Tembok Sanlex kg 5,100.00
Rool Cat Tembok bh 15,000.00
Kape Tembok bh 5,000.00
Kape Kayu bh 5,000.00
Soligneum 1 Blek 5 ltr 12,000.00
Kwas 3 " bh 7,500.00
Otem (Pewarna Plitur) bks 1,000.00
Spirtus ltr 2,500.00
Bahan Plitur Kripik (Sirlak India) kg 6,000.00
Dempul Halus/ Infra (Wood Filler)/Impra kg 21,500.00
Terpentin ltr 2,000.00
Tiner ltr 18,000.00
Ampelas lbr 2,500.00
Dempul Kayu Cap Kucing kg 9,500.00
Dempul Kayu Avian kg 6,000.00
Meni Kayu/ Besi kg 20,000.00
Sincromat kg 60,000.00
Cat Kayu pinoguar kg 24,000.00
Cat Besi Seiv kg 60,000.00
Cat Kayu Avian kg 45,000.00
Cat Besi Duco Danaglos / ICI kg 130,000.00
Lem Kayu Putih (Fox) kg 8,500.00
Lem Kayu Kuning (AIBON) kg 14,000.00
BAHAN KACA
Kaca polos 3 mm (ASAHI) m2 57,000.00
Kaca polos 5 mm (ASAHI) m2 65,000.00
Cermin m2 89,000.00
BAHAN PERPIPAAN
Pipa GIP Medium B dia. 1/2" bt 17,000.00
Pipa GIP Medium B dia. 3/4" bt 23,000.00
Pipa GIP Medium B dia. 1" bt 25,000.00
Pipa GIP Medium B dia. 1 1/2" bt 43,000.00
Pipa GIP Medium B dia. 2" bt 60,000.00
Pipa PVC MASPION ABU dia. 2" (AW) bt 75,000.00
Pipa PVC MASPION ABU dia. 3" (AW) bt 140,000.00
Pipa PVC MASPION ABU dia. 4" (AW) bt 230,000.00
Grefel beton 1/2 dia. 30 cm m1 30,000.00
BAHAN ELEKTRIKAL
Saklar Broko Tunggal Standard (1Phase) bh 16,000.00
Saklar Broko Seri Standard (1 Phase) bh 16,000.00
Stop Kontak Broko Standard (1 Phase) bh 9,000.00
Lampu Neon TL Philip 1 X 36 W Type TKI bh 17,500.00
Pentanahan Penangkal Petir lengkap bak kontrol ttk 900,000.00
pipa kabel bt 8,000.00
Kabel NYY 2 X 2,5 mm Prima m1 4,000.00
Kabel NYY 3 X 2,5 mm Prima M1 5,000.00
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
I PERJAAN PERSIAPAN
1 Pembebasan lahan 150,000.00 150,000.00
2 Pengukuran Kembali dan Pemasangan Bouwplank
Tenaga
Pekerja 0.1000 OH 61,000.00 6,100.0000
Tukang Batu 0.1000 OH 73,000.00 7,300.0000
Kepala tukang 0.0100 OH 80,000.00 800.0000
Mandor 0.0050 OH 87,500.00 437.5000
Bahan
Kayu Kelas II 0.0120 m3 3,500,000.00 42,000.00
Paku Biasa 5 - 10 Cm 0.0200 Kg 15,000.00 300.00
Papan Kayu klas II 0.0070 m3 3,100,000.00 21,700.00
64,000.00 14,637.50 78,637.50
II PEKERJAAN TANAH
1 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 1 meter
Tenaga
Pekerja 0.9000 OH 61,000.00 54,900.00
Mandor 0.0450 OH 87,500.00 3,937.50
Peralatan
Excavator 80-140 HP 0.0186 Jam 679,010.00 12,629.59
Bulldozer 100-150 HP 0.0145 Jam 592,207.00 8,587.00
Alat bantu 0.01 Jam 50,000.00 500.00
21,716.59 58,837.50 80,554.09
V PEKERJAAN TROTOAR
1 Pasang paving block 1,840.00 50,992.50 52,832.50
Paping blok/conblok T = 6 cm 1.0000 m3 1,840.00 1,840.00
Tenaga
Pekerja 0.7800 OH 61,000.00 47,580.00
Mandor 0.0390 OH 87,500.00 3,412.50
2 Pemasangan Kerb 45,000.00 50,992.50 95,992.50
Kerb 1.0000 m3 45,000.00 45,000.00
Tenaga
Pekerja 0.7800 OH 61,000.00 47,580.00
Mandor 0.0390 OH 87,500.00 3,412.50
HARGA UPAH
NO. JENIS UPAH SATUAN
Rp.
1 2 3 4
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4
Halaman : 23
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4
Halaman : 23
HARGA BAHAN
NO JENIS BAHAN SATUAN
Rp.
1 2 3 4
Halaman : 23
REKAPITULASI
RENCANA ANGGARAN BIAYA
PEMBANGUNAN JALAN TOL SUPER HIGHWAY BANDORASA
TAHUN ANGGARAN 2019
JUMLAH
NO. URAIAN
Rp.
1 2 3
JUMLAH 461,220,500.00
PPN 46,122,050.00
JUMLAH TOTAL 507,342,550.00
DIBULATKAN 507,342,000.00
TERBILANG : ( enam belas miliar enam puluh sembilan juta sembilan ratus tiga puluh tujuh ribu rupiah,- )
Kuningan, 2019
Menyetujui
Perencana Pemeriksa
I PEKERJAAN PERSIAPAN
Jumlah 23,550,000.00
2 Pekerjaan Pembongkaran Pondasi dan pagar dinding existing 250 m2 45,000.00 11,250,000.00
Hal : 14
HARGA SATUAN JUMLAH
NO. URAIAN VOLUME
Rp. Rp.
1 2 3 4 5
Jumlah 119,840,500.00
Jumlah 70,898,000.00
IV PEKERJAAN BETON
1 Pek. Pond. Footplat 1.2 mx1.2 mx0.4 m (K225, Besi 12mm) 11.52 m³ 2,550,000.00 29,376,000.00
2 Pek. Sloof uk. 0.2x0.4 m (besi 12mm, begel 8mm) 16.00 m³ 2,550,000.00 40,800,000.00
3 Pek. Kolom uk. 0.4x0.4 m (besi 12mm, begel 8mm 11.52 m³ 2,550,000.00 29,376,000.00
Jumlah 152,472,000.00
Jumlah 69,510,000.00
VI PEKERJAAN FINISHING
Jumlah 24,950,000.00
NOTE :
Hal : 16
RENCANA ANGGARAN BIAYA
PEMASANGAN PAGAR AREA PARKIR RUKO
JL. PEMUDA RAWAMANGUN
1 2 3
I PEKERJAAN PERSIAPAN
4 Mobilisasi
Jumlah
Jumlah
2 Pemasangan Aanstamping
3 Pemasangan Pondasi Batu kali 1 Pc : 3 Ps
Jumlah
IV PEKERJAAN BETON
Jumlah
2 Pek.Plesteran Dinding
3 Pek.Acian Dinding
Jumlah
VI PEKERJAAN FINISHING
Jumlah
JUMLAH KESELURUHAN
NOTE :
-
-
-
#VALUE!
0.2
Err:520
Err:520
Err:520