Professional Documents
Culture Documents
Bidding Process
Bidding Process
o The BAC Chairman shall now formally open the bidding conference (time indicate in philgeps)
o The BAC Chairman states the exact time of opening
o Opening Prayer to be designated by the BAC Chairman
o The BAC Chairman shall now determine the quorum
o The BAC Secretary shall now certify the quorum (as per quorum call)
o The BAC Chairman shall now proceed to proper bidding
Presentation of the project (Project title)
Reading of authorization letter/acknowledgement of bidders
Disclosure of schedule of activities (Publication date and place)
Approved Budget Contract
Source of Fund
Naming of Qualified Bidders
Opening of Bid Box – 1st Envelope Eligibility Documents/Tech. Proposal; 2nd Envelope FP
(reading, validation of all technical documents contained in the 1st envelope)
(BAC Chairman-Original envelope; BAC Member – Copy 1; TWG – Copy 2)
(If something deficient found in the technical envelope; No need to open the financial)
The BAC Chairman shall now instruct the TWG to read the results of the bidding
(lowest offered)
The Lowest Calculated Bid is subject for post-qualification as per TWG’s duties
The BAC Chairman shall now ask if there are objection, alteration and complaints
Signing of results (abstract of bids)
Motion for adjournment
Adjournment duly seconded
Bid Opening adjourned