Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Document Numerical Model

Doc Ref # NM-P716D

PROJECT: Port De La Mer – Le Ciel, Plot 6, Jumeirah First, Dubai, UAE

GROUNDWATER
NUMERICAL MODEL
For
SEEPAGE ANALYSIS OF
SECANT PILE SHORING SYSTEM

00 07 Dec. 2022 Groundwater Numerical Model AB MJ


Rev Date Description Prepared By Checked By

Confidential Document
DISCLAIMER: This document is proprietary and confidential. No part of this document may be disclosed in any manner to a third party without
the prior written consent of Transmak Dewatering Services. It is Transmak Dewatering Services' right to claim for any losses, damages and
profit loss arising from disclosing the contents of this document.
Document Numerical Model

Doc Ref # NM-P716D

PROJECT: Port De La Mer – Le Ciel, Plot 6, Jumeirah First, Dubai, UAE

GROUNDWATER NUMERICAL MODEL


By Visual MODFLOW Version 4.6.0.166

Parameters used in Numerical Model:

Project: Port De La Mer – Le Ciel

Location: Plot No. 6, Jumeirah First, Dubai, UAE

Dewatering Length 166.00 m


Dewatering Width 134.00 m
Ground Level (between) +3.50 m & +5.50 m DMD
Groundwater Level +2.82 m DMD
General Excavation Level -4.65 m DMD
Maximum Excavation Level -4.65 m DMD
Type of Shoring Secant Piles
Shoring Toe Level Between -11.50 m & -14.00 m DMD

Soil Parameters SAND CALCARENITE

Permeability (m/s) 2.00 x 10-4 1.00 x 10-4

Specific Storage 1.28 x 10-4 6.85 x 10-5

Specific Yield 0.32 0.21


Effective Porosity 0.32 0.21

Total Porosity 0.43 0.32

Geotechnical
XSD/21-0132 Rev.2 dated 16/03/2022 by Matrix Laboratory
Investigation Report

Confidential Document
DISCLAIMER: This document is proprietary and confidential. No part of this document may be disclosed in any manner to a third party without
the prior written consent of Transmak Dewatering Services. It is Transmak Dewatering Services' right to claim for any losses, damages and
profit loss arising from disclosing the contents of this document.
Document Numerical Model

Doc Ref # NM-P716D

PROJECT: Port De La Mer – Le Ciel, Plot 6, Jumeirah First, Dubai, UAE

Using the available Visual MODFLOW Version 4.6.0.166 software, Numerical Groundwater
Model has been generated considering the above parameters.

Referring to the result of the numerical model output enclosed below, the groundwater table
has been reduced respectively based on the contour lines which represents the groundwater
levels (in m DMD) and the groundwater drawdown has been achieved approximately within
15 days considering 18 nos. of deep wells to be installed respectively within the Plot.

The model result will be dependent on the actual ground conditions and groundwater
ingress.

Confidential Document
DISCLAIMER: This document is proprietary and confidential. No part of this document may be disclosed in any manner to a third party without
the prior written consent of Transmak Dewatering Services. It is Transmak Dewatering Services' right to claim for any losses, damages and
profit loss arising from disclosing the contents of this document.
Document Numerical Model

Doc Ref # NM-P716D

PROJECT: Port De La Mer – Le Ciel, Plot 6, Jumeirah First, Dubai, UAE

FLOW CALCULATIONS

Confidential Document
DISCLAIMER: This document is proprietary and confidential. No part of this document may be disclosed in any manner to a third party without
the prior written consent of Transmak Dewatering Services. It is Transmak Dewatering Services' right to claim for any losses, damages and
profit loss arising from disclosing the contents of this document.
Document Numerical Model

Doc Ref # NM-P716D

PROJECT: Port De La Mer – Le Ciel, Plot 6, Jumeirah First, Dubai, UAE

GROUNDWATER NUMERICAL MODEL:


15 Days Drawdown Contours in m DMD

Confidential Document
DISCLAIMER: This document is proprietary and confidential. No part of this document may be disclosed in any manner to a third party without
the prior written consent of Transmak Dewatering Services. It is Transmak Dewatering Services' right to claim for any losses, damages and
profit loss arising from disclosing the contents of this document.
Document Numerical Model

Doc Ref # NM-P716D

PROJECT: Port De La Mer – Le Ciel, Plot 6, Jumeirah First, Dubai, UAE

Confidential Document
DISCLAIMER: This document is proprietary and confidential. No part of this document may be disclosed in any manner to a third party without the prior written consent of Transmak Dewatering Services. It is Transmak
Dewatering Services' right to claim for any losses, damages and profit loss arising from disclosing the contents of this document.
Document Numerical Model

Doc Ref # NM-P716D

PROJECT: Port De La Mer – Le Ciel, Plot 6, Jumeirah First, Dubai, UAE

Confidential Document
DISCLAIMER: This document is proprietary and confidential. No part of this document may be disclosed in any manner to a third party without the prior written consent of Transmak Dewatering Services. It is Transmak
Dewatering Services' right to claim for any losses, damages and profit loss arising from disclosing the contents of this document.

You might also like