7.00 Plumbing
7.10 CP FITTINGS & ALLIED
7.1.1 Washbasin First and Second Floor Nos.
Jaguar/Aquaviva/ Perryware/As Sample 3000 3000
7.1.2 Water closet (indian ) First and Second Floor Jaguar/Aquaviva/ Perryware/As
Nos. Sample 4000 4000
7.1.3 Water closet First and Second Floor Jaguar/Aquaviva/ Perryware/As
Nos. Sample 6500 6500
7.1.4 URINAL First and Second Floor Nos.
Jaguar/Aquaviva/ Perryware/As Sample 16500 16500
7.1.5 Sanitary ware ,CP FITTINGS & ALLIED Washrooms Nos 1200 1200
7.1.6 Health faucet First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 800 800
7.1.7 Bibcork First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 1600 1600
7.1.8 Angle valve First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 300 300
7.1.9 Conceal Cistern/ Flush Valve First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 5500 5500
7.1.10 Soap holder First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 600 600
7.1.11 Towel ring First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 600 600
7.1.12 Braided hose First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 450 450
7.1.13 Floor drain with Cockroch Trap First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 850 850
7.1.14 Basin mixer First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 3900 3900
7.1.15 Bating area spout First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 1200 1200
7.1.16 Diverter First and Second Floor Jaguar/Aquaviva/
Nos. Perryware/As Sample 4500 4500
7.1.17 Waste and Soil Line Works First and Second Floor , W.C , Bathing Area ( Wash
Prince Basin
Nos. , Urinal Counted inW.C and
/Appolo Bathing Area )
22500 11250
7.1.18 Hot and Cold WATER SUPPLY INSTALLATION First and Second Floor , W.C , Bathing Area ( Wash
Prince Basin
Nos. , Urinal Counted inW.C and
/Appolo Bathing Area )
14800 7400
7.1.19 Rate Basis for Item 7.1.17 and 7.1.18
7.17 Waste and Soil Line Works Washrooms /Pantry / Terrace /LandscapePrakash/
Area Supreme/Prince
R.Ft 1350 1350
7.18 Waste and Soil Line Works Washrooms /Pantry / Terrace /LandscapePrakash/
Area Supreme/Prince
R.Ft 1080 1080
7.19 Waste and Soil Line Works Washrooms /Pantry / Terrace /LandscapePrakash/
Area Supreme/Prince
R.Ft 750 750
7.20 Waste and Soil Line Works Washrooms /Pantry / Terrace /LandscapePrakash/
Area Supreme/Prince
R.Ft 675 675
7.21 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /Landscape Area 0
7.22 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /Landscape Area Nos 6500 6500
7.23 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /Landscape Area Nos 5800 5800
7.24 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /Landscape Area Nos 5200 5200
7.25 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /Landscape Area Nos 4500 4500
7.26 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace / LandscapeSupreme
Area /Prince 0
7.27 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /LandscapeSupreme
Area /Prince
Rm 275 275
7.28 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /LandscapeSupreme
Area /Prince
Rm 325 325
7.29 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /LandscapeSupreme
Area /Prince
Rm 405 405
7.30 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace / Supreme /Prince
Rm 675 675
7.31 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /LandscapeSupreme
Area /Prince
Rm 796 796
7.32 WATER SUPPLY INSTALLATION Washrooms /Pantry / Terrace /LandscapeSupreme
Area /Prince
Rm 980 980
Sub Total Modular Furniture Carried to Summary -
9.00 ELECTRICAL
9.10 Light Points Finloex, Havells,
Sq.Ft. Crabtree ,Achror, Panasonic/
70 Crompton/As App/As Sample 55
9.20 Wiring Switch Socket/ A.C /Kitchen Equipment's/ Audio Video and other Equipment's Finloex, Havells,
Sq.Ft. Crabtree ,Achror, Panasonic/
75 Crompton/As App/As Sample 70
9.90 Exhaust Finloex, Havells,
Nos. Crabtree ,Achror, Panasonic/
3500Crompton/As App/As Sample 3500
9.10 Geyser Finloex, Havells,
Nos. Crabtree ,Achror, Panasonic/
6000Crompton/As App/As Sample 6000
9.11 Ceiling Fan Finloex, Havells,
Nos. Crabtree ,Achror, Panasonic/
2400Crompton/As App/As Sample 2400
9.12 Ceiling Light Finloex, Havells,
Nos. Crabtree ,Achror, Panasonic/
650Crompton/As App/As Sample 650
9.13 Mirror Lights Finloex, Havells,
Nos. Crabtree ,Achror, Panasonic/
1000Crompton/As App/As Sample 1000
Note: CCTV and Specific Door Lock Entry to be designed and discussed.
Sub Total Electrical Works Carried to Summary -
12.00 MISCELLENOUS
12.10 Railing 900mm High Staircase R.Ft. 1350 1350
12.20 Railing Along Dado Corridor/Waiting Area R.Ft. 650 650
12.3. Tensile Roof Sq.Ft. 750 750
Sub Total Miscellaneous Works Carried to Summary
G. Total -
Annexure - B
Terms and conditions:
All fees and sanctions required for the job though not limiting to M.C.D, Fire, Police and any other government body is to be arranged is to be paid separately and extra from the work contract rates mentioned
above.
30% as advance of total order value ,65% with running works and 5% on completion of work.
Freight & forwarding including in the above price.
Warrantee: 12 months warrantee/ standard equipment warranty , against manufacturing and installation defects (does not cover any consequential damage or losses. Does not cover normal wear and tear )
All the items would be as per the approved specifications and drawings only.
Any other item which shall come up during execution shall be charged separately as per mutually agreed rates.
Water and electricity has to be provided free of cost at site. In case of non availability from client’s side the same would be arranged by us and would be charged additionally @ 2% of the total work value.
All labor and installation charges included in the above mentioned price
The above mentioned qty is for rough estimate only the work would be done on as per actual measurements and final billing would be done after due measurements on site.
Period of final measurements 15 days from the date of submission of final bills.
Clause of force majurare should be applicable. I.e. We shall not be liable delay due to natural calamity, disaster ,strikes, riot or any other conditions which are beyond our control.
Delay due to approvals from statuary bodies like M.C.D, Fire Etc would be credited to time allotted for completion of project.
Escalation @ 5% would be applicable , (Any rate change by brands from the date of submission would be reflected in billing )
Material left over as wastage after completion of project would be property of m/s globespan design studio