CV# Kumar Dhamala

FORM TECH-7
CURRICULUM VITAE
Position Title and No. Urban Planner
Name of Firm ECoCoDE Nepal P. Ltd.
Name of Expert: Mr. Kumar Dhamala
Date of Birth: 12th August, 1974
Country of Citizenship/Resident Nepali

Education:
 MSc. in Urban Planning from Tribhuvan University, IoE, Pulchowk Nepal in 2006. (Undertaken research work on “Planning
for seismic Vulnerability, A case of Kirtipur municipality, Nepal.
 Bachelor in Civil Engineering from Pokhara University, PEC, Pokhara, Nepal in 2003.
 Diploma in Civil Engineering from Tribhuvan University, Institute of Engineering, Nepal in 1995.
 Diploma (Six months) in interior design from Kristal P. Ltd., Kamalpokhari, Kathmandu, Nepal in 1996
Training:
 21 days Technical Auditor’s Training (2070-10-06 to 2070-10-27), organized by CTEVT & National Vigilance Center,
Kathmandu.
 15 days Training for Project and Programme Management for infrastructure construction and Plant engineering (PPMI)
based on PMAJ’s P2M, (6th February 2012- 17th February 2012) AOTS, Tokyo, Japan.
 21 days Training on Heritage Conservation and Design “public safety for all, Earthquake safety engineering & heritage
conservation” by LCCI/ Fulbright, 22nd Feb.- 29th March, 2019,.
 One week Training Program on Production of Compressed Stabilized Earth Block (CSEB), 7th–15th August, 2009, TU, IOE,
Pulchowk / Department of Education, Ministry of Education, GoN/ MS Nepal/ Action aid Denmark
 One week Training on Risk sensitive land use planning, KVDA/UNDP, November 2015, Dhulikhel, Kavre, Nepal
 FIDIC certified training on Management of claims and the resolution of dispute; SCAEF,CBDIC,FCAN, June 30th – July 1st
2018, Kathmandu
 Training on Project management, SCAEF, 27th July-28th July, 2018, Dhulikhel, Kavre
 Three days training on Public private partnership , SCAEF; 08-10th May, 2019, Kathmandu
 Training on e-GP system ; SCAEF, CBDIC,FCAN, ESC P. Ltd, 7th – 8th June 2018, Kathmandu
 3 days Interactive Training for Micro Hydro Design Engineers and Technicians", March 16-18, 2004, AEPC/Energy Sector
Assistance Programme (ESAP).
Employment Record:
Employing Organization and title/
Summary of activities performed relevant to the
Period Position. Contract information for Country
Assignment
reference
July, 2010 Employer: ECoCoDE Nepal (P) Ltd. Nepal Job Responsibilities:
- Till date Position Held: Sr. Civil Engineer/  Responsible for overall planning, management and
Planner/Team Leader execution of projects undertaken by the firm.
Reference Information:  Planning and design of different Infrastructure Projects
Mr. Nirmal Adhikari , MD
Tel: 9851083721
March, Employer: Milestone Design and Nepal Job Responsibilities: Planning and design of different
2010 – till Planning Consult (P) Ltd. Infrastructure Projects
date Position Held: Sr. Civil Engineer
/Planner/Team Leader
Reference Information:
Mr. Kumar Dhamala
Tel: 9851076265
July, 2005 - Employer: RIDC (P) Ltd. Nepal Job Responsibilities:
Jun, 2010 Position Held: Sr. Civil Engineer  Working as a managing director; Involved for the day to
/Planner/TL day management of field and Office works of the Firm.
Reference Information:  Planning and design of different Infrastructure Projects
Mr. Jagat Ranabhat, MD
Tel:98511132180,E-mail: N/A
March Employer: We Link Consultancy Pvt. Nepal Job Responsibilities:
2007 - Ltd. Working as an Urban Planner and Civil Engineer; Attending
July, 2007 Position Held: Sr. Civil Engineer / Community meetings, Planning and designing of Physical
Planner and Social infrastructures and their quantity and cost
Reference Information: estimate, Prepare Reports, Investment plan, Management
Mr. Saroj Basnet/Director plan, Project evaluation and monitoring Plan.
Page 1 of 17
CV# Kumar Dhamala

Tel: 9851055091
Sept, 2006 Employer: Dhamala Construction & Nepal Job Responsibilities:
- March, Engineering Company Pvt. Ltd. Worked as Associate of Managing Director; Planning,
2007 Position Held: Civil Engineer Designing, Cost Estimate, Rate analysis of projects, prepare
(Part Reference Information: Mr. S. contracts, agreements, reports, Bill and BOQ, construction
Time) Dhamala supervision of new building, renovation & rehabilitation of
Tel: 9851036513 traditional / Old Buildings.
Aug, 2003 Employer: Design Cell Pvt. Ltd. Nepal Job Responsibilities: Worked as Civil Engineer; Planning,
- Feb, Position Held: Civil Engineer Designing, quantity and Cost Estimate, Rate Analysis,
2005 (part Reference Information: Mr. A R Panta Preparing Contracts, agreements, Bill and Reports,
time) Tel: NA Construction supervision of Projects.
1993 to Employer : Nest Nepal Job Responsibilities: Worked as an junior engineer for
1999 Interiors (P) Ltd., Kathmandu space Planning, interior Designing, drawing, Cost Estimate,
Position : Junior Engineer Rate analysis of projects, prepare contracts, agreements,
Reference Information: Mr. Pramod reports, Bill and BOQ, construction supervision of
Oberoi renovation & rehabilitation of traditional / Old Buildings
Tel: NA mostly related to interior design.

Membership of Professional Society:


 Member, Nepal Engineering Council, No. 3288 "A"
 Life Member, Nepal Engineers Association, No. 6994
 Life Member, Regional & Urban planners Society of Nepal (RUPSON), No 99
 Member, Shelter & Local Technology Development Center (SLTD)
 General Secretary, HOMES Nepal, Kathmandu, Nepal, NEC 3288 “A”
Awards, Papers and publication;
RUPSON Best Thesis Award -2007, awarded by Regional and Urban Planners Society of Nepal (RUPSON) for the Best
Thesis on Msc Urban Planning, entitle “Planning for seismic Vulnerability, A case of Kirtipur Municipality, Nepal”.
Vulnerability Analysis: Planners' Perspective for Seismic Risk Reduction; Dr M Subba, K. Dhamala / 2007, The
Earthquake Day, Hotel Radisson, Kathmandu, Nepal, Symposium on Experiences in Earthquake Risk Reduction and
Response; The paper aims to examine the state of knowledge connected to the concept of vulnerability and tries to
identify steps by which vulnerability analysis can be carried out, and it ultimately tries to recommend some policy
measures which are useful in mitigating seismic risk. This article therefore hopes to contribute to current
understanding on the concept of vulnerability, open up the debate on its relevance vis-à-vis also widen the scope of
current policies and practices pursued in disaster planning and management.)
Seismic Vulnerability of Kirtipur Municipality; K. Dhamala / 11-13 April, 2007, Kathmandu, 10th National Convention
of Engineers, Building New Nepal: Challenges and Opportunities to Engineers; This paper tries to know seismic
vulnerability of people of Kirtipur Municipality by proposing a three-step vulnerability assessment technique, and also
attempts to recommend a general framework of mitigation measures including measures specific to Kirtipur
Municipality.)
Planning for seismic vulnerability, A case of Kirtipur Municipality, Nepal; K Dhamala - January 2007, T.U. I.O.E.,
Pulchowk Campus (MSc Thesis); Theme of this research (Thesis) is about the mitigating measures to be adopted for the
disaster risk of a city considering the seismic vulnerability of people & Physical, Socio-economical aspect of the
Municipality. Thesis proposed a three step model of vulnerability analysis. It also tries to link up the physical
perspective of the vulnerability with the social perspective which may be the new dimension in this regard.
Towards Developing Disaster Resilient Local Government: A Resource Manual for trainers on Resilient
Reconstruction and Development, GoN, National Reconstruction Authority, Earthquake Housing Reconstruction
Project (EHRP), Project Management Unit, Singhadurbar, Kathmandu & NDRRMA, 2077- contributed as Urban
Development Planning Expert.
National Urban Development Strategy (NUDS), 2017, Government of Nepal, Ministry of Urban Development Urban
Development and Physical Planning Division, contributed as Infrastructure Planner in the preparation of NUDS.
Disaster management Framework (DMF)” of Nepal for MoPPW/MoHA, 2009, contributed as Infrastructure Planner /
Team leader in the preparation of DMF.
Language Skill : Reading Writing Spoken
English Excellent Excellent Excellent
Nepali Excellent Excellent Excellent
Hindi Good Good Good
Adequacy for the Assignment:
Detailed Tasks Assigned and Reference to Prior Work/ Assignments that Best Illustrates Capability to Handle
the Tasks Assigned
In the capacity of Team Leader/Urban Planner; Mr. Kumar Dhamala will be responsible for all the works
assigned as per the ToR
1. Name of assignment: Review of Legal Policy Framework and Capacity Assessment Related to Natural Resource
Page 2 of 17
CV# Kumar Dhamala

Safeguards In Linear Infrastructure Year: 2023 Client: WWF ALIGN project Employer: EERC Nepal P. Ltd., Main project
features: Review of policy and legislative framework and capacity of key stakeholders Position held: Infrastructure
Development expert, Activities performed: Consultation meeting with key stakeholders (government, private sector,
international/national banking and financial institutions and civil society organizations), Literature review of key
stakeholders specific to infrastructure development, Consultation workshop at the federal and provincial levels,
Preparation of the study report
2. Name of assignment or project: Preparation of Master Plan of Lumbini Provincial City; Location: Dang Deukhuri Valley;
Year:June,2021 to April,2022; Employer: ECoCoDE Nepal P. Ltd.; Main Project Features: Preparation of Master Plan,
Preparation of Action Plan including DPR Preparation; Position Held: Team Leader/Urban Planner
Activity Performed:
 Collection of information for overall planning of LPCC
 Preparation of comprehensive Master Plan of LPCC
 Preparation of Detailing of Provincial Institutional area of LPCC.
3. Preparation of Planning guidelines and building Bylaws
4. Name of assignment or Project: Feasibility Study of Integrated Compact Settlement and DPR Preparation of Major
Infrastructure in Eastern Rukum District and Preparation of Physical Development Plan for Integrated Settlement
Development along with Detail Engineering Design of Prioritized Project in Aalitaal Rural Municipality, Dadeldhura
District and Maikot, Eastern Rukum District. (Contract ID: DUDBC/CS/QCBS/09/078/79). Main Project Features: Detailed
field study of the entire three planning areas, Detailed Topographical Survey of the three identified DED of major
infrastructures sites, study, identification, ranked and Detailed sectoral Plan preparation for the integrated compact
settlement development, Employer: ECoCoDE Nepal- GES-Fullbright JV, Position Hold: Team Leader/Urban Planner, Year:
20th January 2023 to 17th September 2023 (Intermittent); Project Location: east Rukum and Dadeldhura districts. Activity
Performed: Management for the execution of the overall project, Collection and arrangement of information for overall
planning, Preparation of comprehensive Integrated Compact Settlement plan, coordination with the team, stakeholders,
and the client.
5. Name of assignment or project : Preparation of Detailed Project Report of Land Pooling Project at Pyutar, Bagmati
Gaunpalika Ward no 4, Lalitpur, Bagamati Province, Nepal for RFP No.: UDBO/KTM/CS/01-076-/077,Year: 7th January,
2021 to 7th June, 2021;Location: Pyutar, Bagmati Gaunpalika Ward no 4, Lalitpur; Employer/Client: ECoCoDE Nepal (P)
Ltd./RAP3, Main Project Features: Preparation of Detailed Project Report of Land Pooling Project; Position Held: Team
Leader/Urban Planner, Activities Performed:
 Conducted detailed topographical and cadastral surveys of LP sites, Prepared developed cadastral map in close
 Coordination of district survey office with all topographical features and existing land plots. Similarly conducted
detailed engineering design of (road/drainage/water supply/electricity network/communication), social and
economic survey of LP sites and conduct a proper analysis of them.
 Conducted detailed layout of all Blocks and road network of approved LP sites. Demarcated all Blocks, individual
and parcels, road networks and public facilities.
 Communicated guidelines, suggestive measures, etc. to address the sustainable development of the planned
area ensuring environmental improvement by preserving green and open space, culture and natural resources.
 Identified the numerous consequences of implementing the LP project under the existing situation and finally
propose some pre-requisite conditions and a way forward for the successful implementation of the project.
 Educated local people about planned urban development by ensuring their active participation in the process by
reflecting the communities' view and meeting with the people of the community in the process of planning,
implementation and operation of Land Pooling (LP).
 Guided the Urban Growth of the designated area which would reflect Long term Vision, Overall Goal, Objectives
and Strategies of the proposed area, and support to implement strategic plans, programs, projects and policies
for proper management of the project area keeping in view of the potential role and function of the area for
sustainable development.
 Formulated guidelines, bylaws suggestive measures, grievance redress mechanism etc., to address the
sustainable development of the planned area ensuring environmental improvement by preserving, agricultural
land, green and open space, culture and natural resources.
 Prepared detailed project report of the land pooling project with accepted block plan for approval by the Nepal
Government as per the prevailing act.
 Detailed Cost estimates including management and infrastructure costs, share of land owners and GoNs
(different scenario) in the project costs, the composition of various infrastructures in the project,
 Prepared a long list of land owners with Kitta no. and land area as per land ownership certificate, public, Guthi
and other lands.
Major Projects features
 Total Cost of the Project: NRs. 399,843,375.8 (3,326,888.81 US$)
 Financial Land Area: 35.70 Ropani
 Total Land Area: 576.089 Ropani
 Viable land (Before Land Pooling): 521.807 Ropani
 Viable Land (After Land Pooling): 364.938 Ropani

Page 3 of 17
CV# Kumar Dhamala

 Contribution Ratio: 36.90%


 Number of Parcels After Land Pooling: 526
 Planned for roads, drainage and sewerage, electricity and water supply etc
6. Name of assignment or project: Detailed Topographical Survey with Unmanned Vehicle/Dron( Area- 44312.72
Sqm),Detailed Master Plan and Design of Differentially Abled and Elderly Residential Care Homes for Provincial Level at
Sainamaina, Nepal; Year: Feb, 2020 -July,2020 (5 months) ;Location: Saninamaina Rupandehi; Main Project Features:
Detailed Topographical Survey with Unmanned Vehicle/Dron , Detailed Master Plan and Design of Differentially Abled
and Elderly Residential Care Homes; Employer: ECoCoDE Nepal (P) Ltd, Position Hold: Team Leader/Urban Planner
The various Block that are designed are:
Oldage Care Blocks: 4.5 Storied RCC Framed Structured with Block Area of each floor = 1540 sq.m. (3 blocks) consist of
all the residential units and amenities like family room, visitors’ room, galleries, treatment rooms and conference hall
(500 Capacity).Each block consists of 120 well designed residential units. A complex is formed centered around the
blocks, viz. Communal Plaza. A well ventilated, ramp accessed block has been designed to cater the need of the old-age
care blocks (Approximate Project Cost: NRs.806.00 Million).
Physically Disabled Care Block: 4.5 Storied RCC Framed Structured with Block Area of each floor = 1268 sq.m. (1 block)
consist of 84 residential units have been devised to house the physically disabled people housed in the single block.
This block consists of all the residential units and service functions like training workshops, gallery, and conference hall
(500 Capacity) (Approximate Project Cost: NRs.235.00 Million).
Medical Block: RCC Framed Structured 3 Storied Medical block with ground floor 507 sq.m. is the block designed to
cater the functional space for medical purpose. This block is further divided into general consulting and therapy
treatment service areas (Approx. Project Cost: NRs 44.50 Million).
Administration Block: Administration block with ground floor 850 sq.m, hold administrative works. It consists of
important office spaces with a 500 capacity multipurpose hall (Approximate Project Cost: NRs.65.0 Million).
Greenbelt Embankment: Greenbelt embankment is designed near the river to retain the overflown water into the
complex. Besides this old Kuldeveta Temple, Helipad, Amphitheatre, Parks etc are also designed.
Activities Performed:
 Topographic Survey of Proposed Project Site with Unmanned Vehicle (Dron) and Preparation of Topographic Map;
 Preparation of Detail Master Plan of site with site planning and landscape.
 Preparation of Detail Architectural Design of the proposed building along with its supporting facilities;
 Preparation of detailed structural design, structural drawing architectural working drawings including sanitary &
electrical works;
 Preparation of digital 3-D model;
 Preparation of detailed Cost Estimate including Civil, Electrical, Sanitary, Acoustic, HVAC and furniture all complete;
Preparation of Cost Estimate, BoQ and Tender Documents (Bid Documents and Specifications).
7. Name of assignment or project: Prepare Master Plan of Administrative Headquarter of Nawalpur district at Kawasoti,
Nepal; Year: Sept, 2019 to July,2020 (intermittent- 4 months);Location: Bardaghat Susta East; Main Project Features:
Preparation of Master Plan, Preparation of Detail Project report (DPR); Employer: Milestone Design and Planning Consult
(P) Ltd,Position Held: Team Leader/Urban Planner, Activities Performed:
i. Topographical Survey and Mapping of the Project Area (139 Bigha)
ii. Preparation of Master Plan with alternatives
iii. Detailed Geotechnical investigations
iv. Preparation of Detailed Engineering Design and DPR of Facilities:
Offices related to federal government, provincial government and local government with residential complex, sports
complex and conference center(There are two types of residential apartment (area 3.39 bigha) for the staffs inside the
complex- Type 1 (2 bed apartment) and Type 2 (one bed apartment). There are 9 plots for four storey apartment Type 1
with total of 144 apartment units. Similarly, there are 10 plots for Apartment Type 2. The total number of Type 2
apartment unit is 160 in 10 apartment blocks. The proposed space for the sports complex has an area 15 bigha with
football and cricket stadium. The football stadium can accommodate around 25,000 spectators while the cricket stadium
can house 15,000 viewers. The cricket stadium is with the covered hall.) .The total project cost is NPR 36.429 billion.
8. Name of assignment or project: Preparation of Detail Project report (DPR) and Environmental Impact Assessment (EIA) of
Industrial District at Shaktikhor, Chitwan (1178.67Ha) and Contract No.: ID-DPR/EIA4-SaID-QCBS-74/75;Year:Jan, 2018 to
July,2020; Location: Shaktikhor, Chitwan; Main Project Features: Preparation of Detail Project report (DPR) and
Environmental Impact Assessment (EIA) of Industrial District; Employer: ECoCoDE Nepal (P) Ltd,Position Held: Team
Leader/Urban Planner, Activities Performed:
i. Topographical Survey and Mapping of the Industrial Area
ii. Preparation of Master Plan with alternatives
iii. Detailed Geotechnical investigations
iv. Preparation of Detailed Engineering Design and DPR of Physical Facilities:
 Entry & Exit gate with service road Construction (7,200 million approx.)
 Park, Parking & Greeneries (2,100 million approx.)
 Admin Building, Fire Station, Community Building, Commercial Complex, Hospital, School, Cargo Station, Petrol
Pump, Custom Office Housing (A:156 unit +B: 175 unit), Apartment ( A: 32 unit+ B: 16 unit) (10,800 million approx.)
 Bridge, Dam & River protection Works. (450 million approx.)
Page 4 of 17
CV# Kumar Dhamala

 Electrical & Telecommunication (2,700 million approx.)


 Sewerage Facilities: Sewage Length (50km), Average Sewage flow: 36lpcd, Design Discharge-190lps, @ treatment
Plant design (capacity- 500million), Project Cost- 3000million approx.
 Water Supply Facilities: OHT-1(50cumec), Source: Ground Water (10 borehole each capacity 30lps with Treatment
Plant with 120 cumec Litres Capacity Reservoir. Project Cost: 1000million approx.
 Water Supply/Sewerage & Waste management. (2,700 million approx.)
 Total Project Cost: 30,000 Million approx.
v. Capacity Building Activities.
vi. EIA Study.
vii. Preparation of Tender Documents.
9. Name of assignment or project: Preparation of Integrated Urban Development Plan (IUDP) of Aanbookhaireni Rural
Municipality, Tanahun District of Gandaki Province, Year: March,2019 - Oct, 2019 (5 months);Location:
Aanbookhaireni;Employer: Milestone Design and Planning Consult P. Ltd., Main Project Features: Preparation of IUDP
and Preparation of DPR of Selected Project; Positions held: Team Leader/Urban Planner, Activities performed:
(i)Setting/Revision out Town Vision/ Sectoral goals, objectives, outputs, programs(ii) Preparation of Town
Profiles(iii)Preparation of Building Bye-Laws(iv) Preparation of Long-term Physical Development Plan/Physical Master
Plan-25 Years/ Master Plan for upgrading, maintaining and developing the urban infrastructure like road, bridges, water
supply and sanitation and other built structures,(v) Preparation of Social Development Plan for improving the situation
of education and health, increasing women empowerment and child welfare, security and social mobilization including
Main streaming GESI (vi) Preparation of Disaster Risk Management Plan to reduce the risk of lives due to natural and
human induced disaster(vii)Preparation of Cultural & Tourism Development Plan to promote local culture and to
promote tourism activities (viii) Preparation of Economic Development Plan for investing on the potential areas that will
generate revenues thus increasing the GDP of Aanbookhaireni (ix) Preparation of Financial Development Plan (x)
Preparation of Institutional Development Plan(xi) Preparation of Environmental Management Plan for improving the
urban milieu of Aanbookhaireni (xii) Preparation of Climate Change Adaptation Plan (xiii) Preparation of Multi-Sectoral
Investment Plan (MSIP) for 25 years with investment arrangement on each projects(xiv) Identification and Preparation
of an implementation Model/Block Model and stakeholders involved in each Sectoral Plans and(xv)Preparation of
Various GIS Maps (Population density map, Interlinkage map, Planning Concept map, Natural resource map, Multi
Hazard Risk Map, Land Use Map, Terrain Map, Road Network Map, Bus terminal and Bus Stop Map, Public service maps,
Public Toilet Map, Proposed Cultural Route Map, Water Supply Maps, Landfill Site and proposed waste treatment Map,
Drainage Map, Proposed Tourist Area Map, Proposed Transportation route map, Sewerage Network Map, Emergency
Evacuation Map etc.) depicting and validating the existing and proposed scenario of Aanbookhaireni. xvi) Feasibility
Study and Detailed Topographical Survey, Design and Preparation of Detailed Project Report (DPR) including Master
Plan of Aanbookhaireni Stadium (Total Project Cost: NRs 230. Millions).
Master Planning Area-43 Ropani, U Shaped Stadium with 8 running Track- of 375, Swimming Pool- 1700aqm area
(Project Cost-NRs 20.87 Million),VIP, Canteen, Covered Hall, Toilet, Parking, Leisure and Parking Spaces, Office,
Electricity, Water supply etc.
10. Name of assignment or project: Detailed Master Plan, Detailed Engineering Survey, Detailed A&E Design, Detailed
Drawings(including all Structural Drawing, Electrical layout, Sanitary layout),Detail Cost Estimate and Preparation of Bid
Documents of Krishnapur Municipal Office Building and Ward Office Building at Gulariya, Kanchanpur.,Year: March
2018 to July 2019 (Intermittent input-4months);Location: Gulariya, Kanchanpur; Employer: ECoCoDE Nepal (P) Ltd;
Main Project Features: Detailed Master Plan, Detailed Engineering Survey, Detailed A&E Design, Detailed Drawings;
Position Held : Team Leader/Urban Planner, Activities Performed:
 Topographic Survey of Proposed Project Site and Preparation of Topographic Map;
 Soil Investigation including Drilling, Lab test and Report Preparation;
 Preparation of Detail Master Plan of site responding topography, soil and water as per site conditions;
 Preparation of Detail Architectural Design of the proposed building along with its supporting facilities;
 Preparation of detailed structural design, structural drawing architectural working drawings including sanitary &
electrical works;
 Preparation of digital 3-D model;
 Preparation of detailed Cost Estimate including Civil, Electrical, Sanitary, Acoustic, HVAC and furniture all complete;
 Preparation of Cost Estimate, BoQ and Tender Documents (Bid Documents and Specifications).
11. Name of assignment or project : Preparation of Master Plan and Preparation of DPR of Chitwan Stadium at Chitwan
District, Year: April,2018 to July,2018 (4months); Location:Chitwan;Employer/Client: ECoCoDE Nepal (P) Ltd./ National
Sport Council, Main Project Features: Preparation of Master Plan and Preparation of DPR of Chitwan Stadium; Position
Held : Team Leader/Urban Planner, Activities Performed:
 Topographical Survey, Preparation of Master Plan (Standard football ground of 68mx105m with 400m standard
track is around the football ground , The parking can accommodate a minimum of 340 cars and 700 bikes.,)and
architecture design of Chitwan Football Stadium.
 Preparation of DPR of parapets for football stadium for around 20000 viewers with VIP Arena or depending upon
the land area available, parking, public toilet and compound wall.
 Detailed Electrical and Sanitary design, internet & sound system of Chitwan Football Stadium.
 Preparation of detailed estimate, detail construction drawings & design, rate analysis, specification of all
Page 5 of 17
CV# Kumar Dhamala

components
 Preparation of the structure analysis report, construction drawings, detailed BOQ, cost estimate, rate analysis and
construction specifications and preparation of Tender documents, phase-wise development plan/ Phase-wise cost
plan of the construction of the covered hall & parapets based on multi-year investment plan.
 Preparation of 3-D drawings.
 Preparation of Soil investigation report.
 The spaces required for the design are enumerated as follow:
1.VIP Arena (Western Side) = 2284.79 Sq. m, Foyer,Space for players: i) lounge, ii)toilets, iii) showers, iv)
changing,Meeting Room,VIP lounge,Waiting room,First aid room, Medicine storage, Referee Room,Massage
Room,Officials Room,Match delegate office,Offices,Toilets, Café,Vertical circulation (staircase, ramps)
2. Spectators’ Arena (Eastern Side) =2284.79 Sq. m., Club offices,Club meeting room,Stadium Control Room ,Stadium
store,Rental spaces,Café,Toilets,Vertical circulation (staircase)
3.Northern Arena = 2365.74 Sq. m (Offices, Toilets, Vertical circulation (staircase),
4.Southern Arena = 2365.74 Sq. m (Offices, Toilets, Café)
12. Name of assignment or project: Detailed Master Plan, Detailed Engineering Survey, Detailed A&E Design, Detailed
Drawings (including all Structural Drawing, Electrical layout, Sanitary layout,3D Model, Landscape Design),Detail Cost
Estimate, Soil test with reports and Preparation of Bid Documents of Bhajani Municipal Office Building at Kailali
District); Year: April, 2018 to June 2018, Location: Bhajani, Kailai; Employer/Client: ECoCoDE Nepal (P) Ltd/ Bhajani
Municipal Office; Main Project Features: Detailed Master Plan, Detailed Engineering Survey, Detailed A&E Design,
Detailed Drawings; Position Held: Team Leader/Urban Planner, Activities Performed:
 Topographic Survey of Proposed Project Site and Preparation of Topographic Map;
 Soil Investigation including Drilling, Lab test and Report Preparation;
 Preparation of Detail Master Plan of site responding topography, soil and water as per site conditions;
 Preparation of Detail Architectural Design of the proposed building along with its supporting facilities;
 Preparation of detailed structural design, structural drawing architectural working drawings including sanitary &
electrical works;
 Preparation of digital 3-D model, Landscape design,
 Preparation of detailed Cost Estimate including Civil, Electrical, Sanitary, Acoustic, HVAC and furniture all complete;
 Preparation of Cost Estimate, BoQ and Tender Documents (Bid Documents and Specifications
13. Name of assignment or project: Detailed Master Plan, Detailed Engineering Survey, Detailed A&E Design, Detailed
Drawings(including all Structural Drawing, Electrical layout, Sanitary layout),Detail Cost Estimate, Soil test with reports
and Preparation of Bid Documents of Shivpuri Rural Municipal Office Building at Mahakali Sherabagar,Nuwakot;Year:
Feb, 2018 to April 2018;Location: Mahakali Sherabagar, Nuwakot; Employer/Client: ECoCoDE Nepal (P) Ltd,/ Shivpuri
Municipal Office; Main Project Features: Detailed Master Plan, Detailed Engineering Survey, Detailed A&E Design,
Detailed Drawings; Position Held: Team Leader/Urban Planner, Activities Performed:
 Topographic Survey of Proposed Project Site and Preparation of Topographic Map;
 Soil Investigation including Drilling, Lab test and Report Preparation;
 Preparation of Detail Master Plan of site responding topography, soil and water as per site conditions;
 Preparation of Detail Architectural Design of the proposed building along with its supporting facilities
 Preparation of detailed structural design, structural drawing architectural working drawings including sanitary &
electrical works;
 Preparation of digital 3-D model;
 Preparation of detailed Cost Estimate including Civil, Electrical, Sanitary, Acoustic, HVAC and furniture all complete;
 Preparation of Cost Estimate, BoQ and Tender Documents (Bid Documents and Specifications).
14. Name of assignment or project: Preparation of Integrated Urban Development Plan (IUDP) of Butwal Sub Metropolitan
City, Year: July, 2017- July,2018 (4months);Location: Butwal; Employer: ECoCoDE Nepal (P) Ltd; Main Project Features:
Preparation of IUDP and Preparation of DPR of Selected Projects; Position Held: Sr. Civil Engineer/Urban Planner
Activities Performed:
(i)Setting/Revision out Town Vision/ Sectoral goals, objectives, outputs, programs(ii) Preparation of Town
Profiles(iii)Preparation/Update of Building Bye-Laws(iv) Preparation of Long-term Physical Development Plan/Physical
Master Plan-25 Years/ Master Plan for upgrading, maintaining and developing the urban infrastructure like road,
bridges, water supply and sanitation and other built structures (v) Preparation of Social Development Plan for
improving the situation of education and health, increasing women empowerment and child welfare, security and
social mobilization including Main streaming GESI (vi) Preparation of Disaster Risk Management Plan to reduce the risk
of lives due to natural and human induced disaster(vii)Preparation of Cultural & Tourism Development Plan to promote
local culture and to promote tourism activities (viii) Preparation of Economic Development Plan for investing on the
potential areas that will generate revenues thus increasing the GDP of Butwal (ix) Preparation of Financial Development
Plan (x) Preparation of Institutional Development Plan(xi) Preparation of Environmental Management Plan for
improving the urban milieu of Butwal (xii) Preparation of Climate Change Adaptation Plan (xiii) Preparation of Multi-
Sectoral Investment Plan (MSIP) for 25 years with investment arrangement on each projects(xiv) Identification and
Preparation of an implementation Model/Block Model and stakeholders involved in each Sectoral Plans
and(xv)Preparation of Various GIS Maps (Population density map, Interlinkage map, Planning Concept map, Natural

Page 6 of 17
CV# Kumar Dhamala

resource map, Multi Hazard Risk Map, Land Use Map, Terrain Map, Road Network Map, Bus terminal and Bus Stop
Map, Public service maps, Public Toilet Map, Proposed Cultural Route Map, Water Supply Maps, Landfill Site and
proposed waste treatment Map, Drainage Map, Proposed Tourist Area Map, Proposed Transportation route map,
Sewerage Network Map, Emergency Evacuation Map etc.) depicting and validating the existing and proposed scenario
of Butwal.
Feasibility Study of Prioritized Major Sub-Projects with alternatives and Detailed Engineering Survey, Design and
Preparation of Detailed Project Report (DPR) including Preparation of Tender Documents of following 3 Sub Projects:
A. Jabai Sports Complex Development(Total Project cost: 229.139 Millions)
 Football Ground (7609 sq.m) and Running track (3005sq.m)- Project Cost: NPR 34.491Million)Details of Work
Performed: Soil Compaction, surface treatment of sand mix clay, side drains and turfing, cement mix clay
compaction, synthetic track laying
 Parapet/Stadium Seating (2740sq.m - Project Cost: NPR 122.577Million)
Details of Design: Elevated RCC framed stadium in two sides and on ground stabilized part at one (North) side. The
elevated stadium upper part used for seating whereas underside used for a. Toilet b. Sport Training Rooms c.
Individual Sport’s offices d. Official and player’s dressing rooms
 Swimming pool (1700sq.m - Project Cost: NPR 20.867 Million)Details of Design: Professional Pool, Learners’ pool,
two sitting areas, open spaces, bating area, Under seating area, water tank
 Covered Hall (1810sq.m - Project Cost: NPR 25.262 Million)Details of Design: two side pavilion, steel posts and truss
with CGI sheet roofing, multipurpose type, flexible to use and can manage most of the common games i.e.
Basketball, volley ball, table tennis, Kusti, Judo, Karete, Taequando etc.
 Canteen (371sq.m - Project Cost: NPR 3.97 Million)Details of Design: For 30 nos. of costumers inside and about 50
nos. outside planned
 Parking (3421sq.m - Project Cost: NPR 3.936 Million),Gates (Two gates: Project Cost: NPR 0.279 Million),Ticket
Counter (Project Cost: NPR 1.495 Million),Office block (4 storey - Project Cost: NPR 3.169 Million) ,Compound wall
(Project Cost: NPR 13.125 Million)
B. Drainage Master Plan with Preparation of DPR of ward no 3,4,5,6,7,8,9,10,&11 (Total 135.046 km) (Project Cost:
NPR 1,470 Million)
C. Detailed Engineering Design of Old Bus park (Vegetable Market) To Yogikuti Junction Road (Length: 3.66 km –
Project cost NPR 593.05 Million).
15. Name of assignment or project: Preparation of Integrated Urban Development Plan (IUDP) of Dharan Sub
Metropolitan City, Year: July, 2017 to Jan,2018 (6months); Location: Dharan; Employer: ECoCoDE Nepal (P) Ltd., Main
Project Features: Preparation of IUDP and Preparation of DPR of Selected Project, Position Held: Team Leader/Urban
Planner
Activities Performed: Major Service Provided :
Setting/Revision out Town Vision/ Sectoral goals, objectives, outputs, programs (ii) Preparation of Town Profiles (iii)
Preparation of Building Bye-Laws (iv) Preparation of Long-term Physical Development Plan/Physical Master Plan-15
Years/ Master Plan for upgrading, maintaining and developing the urban infrastructure like road, bridges, water supply
and sanitation and other built structures (v) Preparation of Social Development Plan for improving the situation of
education and health, increasing women empowerment and child welfare, security and social mobilization including
Main streaming GESI(vi) Preparation of Disaster Risk Management Plan to reduce the risk of lives due to natural and
human induced disaster(vii) Preparation of Cultural & Tourism Development Plan to promote local culture and to
promote tourism activities (viii) Preparation of Economic Development Plan for investing on the potential areas that
will generate revenues thus increasing the GDP of Dharan (ix) Preparation of Financial Development Plan (x)
Preparation of Institutional Development Plan (xi) Preparation of Environmental Management Plan for improving the
urban milieu of Dharan, (xii) Preparation of Climate Change Adaptation Plan (xiii) (Preparation of Multi-Sectoral
Investment Plan (MSIP) for 15 years with investment arrangement on each projects (xiv) Identification and Preparation
of an implementation Model/Block Model and stakeholders involved in each Sectoral Plans and (xv) Preparation of
Various GIS Maps (Master Plan of Bijaypur Chowk, Panchkanya Temple area, Multi Hazard Risk Map, Proposed Cultural
Route Map, Water Supply Maps, Land Use Map, Road Network Map, Buspark and Bus Stop Map, Public Toilet Map,
Landfill Site Map, Drainage Map, Proposed Tourist Area Map, Industrial Area Map, Proposed Railway Track Map,
Proposed Ring Road Map, Proposed Public Vehicle Route, Proposed Parking Zone Map, Terrain Map, Evacuation Map
etcs.) depicting and validating the existing and proposed scenario of Dharan.
Feasibility Study of Prioritized Major Sub-Projects with alternatives and Detailed Engineering Survey, Design and
Preparation of Detailed Project Report (DPR) including Preparation of Tender Documents of following 3 Sub Projects:
A. River Corridor Development along Sardu and Seuti River
 Urban Road (7.87 Km) with 4 – Lane Asphalt Concrete Standards along Sardu River Corridor (Project Cost: NPR
336.552 Million)
 Urban Road (4.88 Km) with 4 – Lane Asphalt Concrete Standards along Seuti River Corridor (Project Cost: NPR
297.266 Million)
 River Embankment/River Training Works (15 km) (Project Cost: NPR 75 Million), Pedestrian and cycle track (15 km)
(Project Cost: NPR 45 Million), Garden Development (10000 Sqm.) (Project Cost: NPR 50 Million), Vehicle Parking (3
hectare) (Project Cost: NPR 228.767 Million)

Page 7 of 17
CV# Kumar Dhamala

B. Storm/Waste Water Drainage Master Plan with Preparation of DPR of ward no 5 and 6 (Total 46.46 km) (Project
Cost: NPR 852.21 Million).
(i) Bijaypur Hill Development Works, Bijaypur Chowk Revitalization (3100 Sqm.- Project Cost: NPR 5.539 Million).
Details of Work Performed: Preparation of Master Plan, Development of prototype of traditional building façade along the
cultural route of Bijaypur hill, Reviving of old architecture through façade improvement, Intervention in existing garden
through storm water ponds, fish pond, rock garden, yoga garden, kids play area, garden construction, Jogging lane and
pedestrian tracks along main road, Construction of rain garden, Kiosks at the crossroad for social livelihood, Encouragement
of Pedestrianization through restriction of automobiles, Increasing porosity through permeable pavements, Planting small
trees on the walkways ,Solar street lamps, Street dust bins
(ii) Road Improvement Works from Bijaypur Chowk to Panchkanya Temple (1.155 km with Project Cost: NPR 34.108
Million).
(iii) Panchkanya Temple Premises Development (6500 Sqm.) (Project Cost: NPR 24.077 Million).
Details of Work Performed: Preparation of Master Plan (Parking Space, Kiosks/Commercial Space, Multipurpose semi
covered hall, Toilets, Gazebos, Information boards, Water Tanks, Garden, Gate and guard house, Pathways, Solar lamps,
Waste disposal area. The Total Cost of DPR: NPR 2432.09 Million. The Total Estimated Cost of all Projects for 15 Years (till
2032) is NPR 21811.62 Million.
16. Name of assignment or project: Feasibility Study and Master Planning of Sagarnath Industrial Area (2689.937Ha),Year:
May, 2016 to April,2017 (intermittent 6 months); Location: Sagarnath, Sarlahi; Employer: ECoCoDE Nepal (P) Ltd.; Main
Project Features: Feasibility Study and Master Planning of Sagarnath Industrial Area ;Position Held: Team Leader/Urban
Planner, Activities Performed:
 Detailed Topographical Survey with detailing of the given Area (2689.937Ha) for boundary verification and
preparing Master Plan.
 A Study of the concept and practice of industrial districts in Nepal and in neighboring countries was performed.
 A brief profile of Sagarnath Industrial district regarding location, demography, physical, social, biological and
cultural environment, hydrology and geology was prepared.
 Market study, investment trend analysis, SWOT analysis, economic analysis was conducted to forecast the demand
i.e. the industrial need of the area and type of industries to be included in the ID.
 Various viable industries in which foreign and national investments could be attracted in the ID due to its
comparative advantages were identified.
 The backward and forward linkages of the viable industries in Sagarnath ID were identified.
 A Land Use Plan with defined zones was prepared.
 A Master Plan of the Sagarnath ID was designed with segregation of various zones (residential, service,
administration and industry).
 Probable project risks were identified for addressing it during project implementation.
 A beneficial and adverse impacts assessment on socio-economic and cultural environment, physical environment
and biological environment impacts were performed to identify the magnitude and nature of impacts and the
mitigation measures required.
 A solid Waste Management Plan was prepared.
 An Environmental Management Plan for different phases of construction was proposed.
 An administrative structure for the smooth operation of sagarnath ID was suggested.
 Detail Cost estimates for all types of infrastructures was prepared.
 Economic Analysis and Financial Analysis showing indicators of the investments such as Net Present Value (NPV),
Internal Rate of Return (IRR) and Benefit-Cost ratio (BCR) including sensitivity tests for changes in prices and capital
costs was carried out for knowing the project feasibility
 Engineering Design and drawings with construction estimate for various building structure and various other
infrastructures are as follows:
 Access Road with Feeder Road Standard (22.747 km) – NPR 1.157 Billion,Internal Blacktopped Service Road
(92.656 km) – NPR 2.15 Billion,Footpath – NPR 348 Million,Boundary Wall – NPR 916 Million,Side Drain (230 km)
– NPR 1.264 Billion,Entry Gates – NPR 1.0 Million,Administrative Block (1110 Sq.m)– NPR 22.515 Million,Service
block (748.43 Sq.m)– NPR 39.627 Million,Industrial plots- 357 Plots.
 Senior Staff Residential Blocks – NPR 10.92 Billion;Junior Staff Residential Blocks – NPR 1.58 Billion;Squatter
residence (1653 plots)– NPR 2.87 Billion;Toilets (62 Sq.m)– NPR 7.766 Million,Canteen (319 Sq.m)– NPR 7.282
Million,Exhibition Center (715.88 Sq.m)– NPR 7.876 Million,Community Center (580 Sq.m)– NPR 6.286
Million,Health Post(517.6 Sq.m)– NPR 22.85 Million,School (1300 Sq.m)– NPR 37.963 Million,Guard house (48
Sq.ft)– NPR 0.889 Million,Petrol Pumps- 1 no.,Weighing Bridge – NPR 325 million, Sentry Posts– NPR 1.7
million,Cargo Stations (1200 Sq.m)– NPR 51.256 million,Parking (0.586 Sq.km)– NPR 1.671 billion, Garden (1.23
Sq.km)– NPR 8.761 million,Water supply requirement was calculated and water tank reservoir was designed.– NPR
552.434 million
 Electrical load requirement for the sagarnath ID was calculated and design and drawings was prepared. Cost of 2
substation: NPR 70 million,Cost of transmission and distribution line: NPR 548 million
 A waste treatment plant model was proposed.– NPR 8.542 million,A sanitary land fill site requirement calculation
was done. (Area -1.87 Ha)– NPR 2.847 million,Drainage and Sewerage Master Plan was prepared.– NPR 660.643
million
Page 8 of 17
CV# Kumar Dhamala

 The total cost of the project is NPR 60.524billion including residential building construction.
17. Name of Assignment or Project: Master Plan and Detailed Engineering Design, Preparation of Detailed Project Report
for District Health Project in Jajarkot District (Project Code:002-DH3-ST-G); Year: March,2016- May,2017 (3months);
Location: Jajarkot;Employer: ECoCoDE Nepal, Main Project Features: Master Plan and Detailed Engineering Design,
Preparation of Detailed Project Report; Position: Sr. Civil Engineer /Urban Planner, Activity Performed:
 Feasibility Study Preparation of DPR of Jajarkot Hospital.
 Preparation of District Hospital master plan with detail design of District Heath Office building.
 Detail Engineering Design of 100 Bedded District Hosp1a with Architectural design structural design. Design of
Electrical works. Solar Lighting works. Sanitary works. Rainwater harvesting works. Telecommunication works.
Firefighting works16 HVAC works.
 Landscaping for 33 Ropani of land and intoner Design of Indoor and Outdoor patient Wards including office wailing
lounge.
 Topographical survey of 32 Ropani 14 Ana (16 748sqm) of land with details of existing structures drainage, water
supply system including detail measurement of existing buildings.
 Preparation of Detail drawings. Rate analysis. Cost Estimates BID document and Contract documents.
 Detail Damage Assessment of existing buildings. Seismic analysis Strengthening and retrofitting design. Preparation
of, drawings for retrofitting works on existing staff quarter buildings in the hospital premises.
 Socio economic survey with 12550 households.
 Preparation of Management information System (MIS).
 Preparation of Institution Management Support Plan.
 Environmental Impact Study detail design of Material Recovery facility (MRF) centers and Solid waste Management
System.
 Study of Environmental Impact Assessment.
 Hydrological analysis for Storm water discharge including detail design of 270 m length storm water drainage.
 Economic and financial Assessment with Sensitivity Analysis.
 Preparation of Operation and Maintenance Manual.
18. Name of assignment or project : Preparation of Integrated Urban Development Plan (IUDP) of Two New Town
(Chaurjahari, Rukum and Rakam Karnali, Dailekh) as a Deputy Team Leader/Civil Engineer under DUDBC New Town
Project ,Year: August, 2015 - Jan,2017 (intermittent-6 months); Location: Chaurjahari, Rukum and Rakam Karnali,
Dailekh; Employer/Client: ECoCoDE Nepal (P) Ltd./DUDBC, Main Project Features: Preparation of IUDP and Preparation
of DPR of Selected Project ;Position Held :Urban Planner/DTL, Activities Performed:
 Prepared long Term Vision and overall Goal, Objective and Strategies of Chaurjahari, and Rakam Karnali New Town
Development.
 Prepared Land Use Plan, Physical Development Plan, Social, Cultural, Economic, Financial, and Institutional
Development Plan, Environmental and Risk Sensitive Land Use Plan, Climate Change Perspective Plan, Multi-
sectoral Investment Plan (MSIP) on the basis of Sectoral Goal, Objectives, Output and Programs.
 Prepared of Building bye-laws to regulate development in the town integrating Land Use and road network plan
and long term vision of the town.
 Prepared overall Integrated Development Plan of entire area including existing and figure (5,10 and 20 years)
 Conducted study on local economy and its activities based on the study completed by NTPCO to identify change in
demographics and migration trend for 5, 10 and 20 years period.
 Prepared of GIS based Base Maps of New Towns.
 Carried out Feasibility Study of Prioritized Major Sub Projects and Preparation of DPR of 2 Projects (water Supply
with Project Cost 300 million and City Bus Park) of each Town.
 Prepared Block Physical Model of Chaurjahari, and Rakam – Karnali in 1:5000 and 1:10000 scales to display the
New Town vision,
19. Name of assignment or project: Preparation of Detailed Project Report (DPR) of Land Pooling Project of Chaurjahari,
Rukum and Burtibang, Baglung under DUDBC New Town Project ,Year: August, 2016 to June,2017 (intermittent 5
months));Location: Chaurjahari, Rukum and Burtibang, Baglung; Employer/Client: ECoCoDE Nepal (P) Ltd./DUDBC; Main
Project Features: Preparation of Detailed Project Report (DPR) of Land Pooling Project ;Position Held :Planner/Civil
Engineer, Activities Performed: The main work includes:
Stage I: Planning and Project Approval
 Prepare three alternatives of Block Plan of Land Pooling Project (LPP) with exact locations of existing features, built up
areas and others. The Block Plan consists infrastructure such as Road, Drainage networks, water supply, Electricity,
Open Spaces, Greeneries, etc. to make it suitable for ideal urban residential, commercial and other or mixed blocks.
 Support Project Office/Town Development Committee to decide implementation of LPP with in the selected boundary,
and help to publish notice for public comments and suggestions. Meanwhile, support office ot get application for LPP
from majority of landowners and tenants.
 Use Plan and effect of implementation of bye-laws to the common public.
Stage II: DPR Preparation and Land demarcation
 Conduct detail layout of all Blocks and road network of approved LP sites. Demarcate all Blocks and road Networks with
concrete pegs.
Page 9 of 17
CV# Kumar Dhamala

 Prepare Building By- Laws, Proposed Land Use/Physical/ Social Infrastructure/Economic Activity Maps for the Project
area.
 Prepare land readjustment plan by plotting and assigning new numbers/land owners detail/land areas etc. of each land
parcel based on the detailed long sheet.
20. Name of assignment or project : Preparation of Municipal Transport Master Plan of Manthali Municipality of
Ramechhap District ; Location: Manthali, Ramechhap; Year: Jan 28, 2016 to Aug 31, 2017 (intermittent-4months));
Employer/Client: ECoCoDE Nepal (P) Ltd./Municipality Office, Main Project Features: Preparation of MTMP; Position
Held : Team Leader/Urban Planner, Activities Performed: Main Work includes: Review and analyse the Existing
DTMP/MTMP, Organize ward and municipal level workshop and made discussion with the stakeholders in each ward
and municipality, Tracking all existing Road Network using GPS (GPS Tracking of total more than 200km Roads),Conduct
GPS operation and GIS Training for municipality technical person, Review secondary source of information, accessibility
data collection and analysis, Prepare and finalize Indicative Development Potential Map (IDPM) within the districts,
Prepare Municipal Inventory Maps (MIM) of SRN, Rural roads and Bridges, Preparation of GIS map of existing road
network showing details of structure, surface type, water crossing structures((bridges, culvert, causeways, etc),required
innervations with appropriate data and symbols, Preparation of Municipal Network Plan (MNP) and shown in GIS Map,
Prepare Municipal Transport Perspective Plan (MTPP) of interventions of services and facilities, Integrated Rural
Accessibility Planning (IRAP),Preparation of Digital name/number Coding of Municipal roads, Prioritize; finalize the rural
road networks and Prepare Municipal Transport Master Plan (MTMP) of the Municipality and taken consensus from
MoFLD and approval from Municipality, Preparation of GIS based Landuse Map, Investment Plan , Institutional
Development Plan .
21. Name of assignment or project : Preparation of Periodic Plan of Kanchanpur District, DDC Kanchanpur.,Year: July,2016
to June 2017 (Intermittent-4Months);Location:Kanchanpur; Employer/Client: ECoCoDE Nepal (P) Ltd./DDC; Main
Project Features: Preparation of PDDP; Position Held : Team Leader/Urban Planner, Activities Performed: The main
work includes: (i) Conduct the VDC level and District level meetings and workshop (ii) Review of Building Bye Law (iii)
Preparation of Long Term Physical Development Plan (iv) Preparation of Present/existing Land use maps with GIS
application (v) Preparation of Environmental Management Plan (vi) Preparation of Social Impact Assessment Plan (vii)
Preparation of Disaster Management Plan (viii) Preparation of disaster Management Plan(ix) Preparation of Multi
Sectoral Investment Plan (x) Preparation of Land use Zoning Maps (xi) Plan was prepared as with logical framework (xii)
Preparation of District Profile.
22. Name of assignment or project: Detailed Study for the Development of Infrastructure for the conservation of Bulbule
Lake of Surkhet and Ghodaghodi Lake of Kailali, Year: April, 2016 to July, 2016 (3months); Location: Surkhet and Kailali;
Employer/Client: ECoCoDE Nepal (P) Ltd/DUDBC. Main Project Features: Detailed Study for the Development of
Infrastructure for the conservation of Lakes; Position Held: Team Leader/Urban Planner. Activities Performed: The
main work includes (i) Study/review or related documents (ii) Preparation of inventory of Lakes (iii) Preparation of
Development Plan for the development of infrastructure for the preservation of Bulbule and Ghodaghodi Lakes. (iv)
Identification of responsible institutions and review the existing mechanism for the operation and mechanism of the
lakes. (v) Identification of projects with cost estimate.
23. Name of assignment or project : Preparation of Municipal Transport Master Plan of Butwal Sub Metropolitan City,
Rupandehi District ; Location: Butwal; Year: May 2015 to July2016 (intermittent- 4months); Employer/Client: ECoCoDE
Nepal (P) Ltd./Sub metropolitan Office, Main Project Features: Preparation of MTMP; Position Held :Civil
Engineer/Planner/Team Leader, Activities Performed: Main Work includes: Review and analyse the Existing
DTMP/MTMP, Organize ward and municipal level workshop and made discussion with the stakeholders in each ward
and municipality, Tracking all existing Road Network using GPS (GPS Tracking of total of 216.89km Roads), Conduct GPS
operation and GIS Training for municipality technical person, Review secondary source of information, accessibility data
collection and analysis, Prepare and finalize Indicative Development Potential Map (IDPM) within the districts, Prepare
Municipal Inventory Maps (MIM) of SRN, Rural roads and Bridges, Preparation of GIS map of existing road network
showing details of structure, surface type, water crossing structures((bridges, culvert, causeways, etc),required
innervations with appropriate data and symbols, Preparation of Municipal Network Plan (MNP) and shown in GIS Map,
Prepare Municipal Transport Perspective Plan (MTPP) of interventions of services and facilities, Integrated Rural
Accessibility Planning (IRAP),Preparation of Digital name/number Coding of Municipal roads, Prioritize; finalize the rural
road networks and Prepare Municipal Transport Master Plan (MTMP) of the Municipality and taken consensus from
MoFLD and approval from Municipality, Preparation of GIS based Landuse Map, Investment Plan , Institutional
Development Plan .
24. Name of assignment or project : Preparation of Municipal Transport Master Plan of Dodhara Chandani Municipality,
Kanchanpur District; Year: March 25, 2016 to June 29, 2016 (intermittent-3months); Location: Dodhara, Kanchanpur;
Employer/Client: ECoCoDE Nepal (P) Ltd./Municipality, Main Project Features: Preparation of MTMP; Position Held:
Team Leader/Urban Planner, Activities Performed: Main Work includes: Review and analyse the Existing DTMP/MTMP,
Organize ward and municipal level workshop and made discussion with the stakeholders in each ward and municipality,
Tracking all existing Road Network using GPS (GPS Tracking of total 216.89km Roads),Conduct GPS operation and GIS
Training for municipality technical person, Review secondary source of information, accessibility data collection and
analysis, Prepare and finalize Indicative Development Potential Map (IDPM) within the districts, Prepare Municipal
Inventory Maps (MIM) of SRN, Rural roads and Bridges, Preparation of GIS map of existing road network showing
details of structure, surface type, water crossing structures((bridges, culvert, causeways, etc),required innervations with
Page 10 of 17
CV# Kumar Dhamala

appropriate data and symbols, Preparation of Municipal Network Plan (MNP) and shown in GIS Map, Prepare Municipal
Transport Perspective Plan (MTPP) of interventions of services and facilities, Integrated Rural Accessibility Planning
(IRAP),Preparation of Digital name/number Coding of Municipal roads, Prioritize; finalize the rural road networks and
Prepare Municipal Transport Master Plan (MTMP) of the Municipality and taken consensus from MoFLD and approval
from Municipality, Preparation of GIS based Landuse Map, Investment Plan , Institutional Development Plan
25. Name of assignment or project : Preparation of Municipal Transport Master Plan of Chainpur Municipality,
Sankhuwashabha District; Location: Chainpur, Sakhuwashabha;Year: March 25, 2015 to June 29, 2016 (intermittent
4months); Employer/Client: ECoCoDE Nepal (P) Ltd./Municipality Office, Main Project Features: Preparation of MTMP;
Position Held : Team Leader/Urban Planner, Activities Performed: Main Work includes: Review and analyse the Existing
DTMP/MTMP, Organize ward and municipal level workshop and made discussion with the stakeholders in each ward
and municipality, Tracking all existing Road Network using GPS (GPS Tracking of total of 212.62km Roads),Conduct GPS
operation and GIS Training for municipality technical person, Review secondary source of information, accessibility data
collection and analysis, Prepare and finalize Indicative Development Potential Map (IDPM) within the districts, Prepare
Municipal Inventory Maps (MIM) of SRN, Rural roads and Bridges, Preparation of GIS map of existing road network
showing details of structure, surface type, water crossing structures((bridges, culvert, causeways etc),required
innervations with appropriate data and symbols, Preparation of Municipal Network Plan (MNP) and shown in GIS Map,
Prepare Municipal Transport Perspective Plan (MTPP) of interventions of services and facilities, Integrated Rural
Accessibility Planning (IRAP),Preparation of Digital name/number Coding of Municipal roads, Prioritize; finalize the rural
road networks and Prepare Municipal Transport Master Plan (MTMP) of the Municipality and taken consensus from
MoFLD and approval from Municipality, Preparation of GIS based Landuse Map, Investment Plan , Institutional
Development Plan.
26. Name of assignment or project : Preparation of Municipal Transport Master Plan of Chautara Municipality,
Sindhuplachowk District; Location: Chautara; Year: Feb 16, 2015 to Sept 23, 2015 (intermittent-3.5 Months);
Employer/Client: ECoCoDE Nepal (P) Ltd./Municipality, Main Project Features: Preparation of MTMP; Position Held :
Team Leader/Urban Planner, Activities Performed:Main Work includes: Review and analyses the Existing DTMP/MTMP,
Organize ward and municipal level workshop and made discussion with the stakeholders in each ward and municipality,
Tracking all existing Road Network using GPS (GPS Tracking of total of 103.60 Roads),Conduct GPS operation and GIS
Training for municipality technical person, Review secondary source of information, accessibility data collection and
analysis, Prepare and finalize Indicative Development Potential Map (IDPM) within the districts, Prepare Municipal
Inventory Maps (MIM) of SRN, Rural roads and Bridges, Preparation of GIS map of existing road network showing
details of structure, surface type, water crossing structures((bridges, culvert, causeways, etc),required innervations with
appropriate data and symbols, Preparation of Municipal Network Plan (MNP) and shown in GIS Map, Prepare Municipal
Transport Perspective Plan (MTPP) of interventions of services and facilities, Integrated Rural Accessibility Planning
(IRAP),Preparation of Digital name/number Coding of Municipal roads, Prioritize; finalize the rural road networks and
Prepare Municipal Transport Master Plan (MTMP) of the Municipality and taken consensus from MoFLD and approval
from Municipality, Preparation of GIS based Landuse Map, Investment Plan , Institutional Development Plan .
27. Name of assignment or project : Preparation of Topographic Map, Master Plan, Detailed Survey, Detailed Design, Cost
Estimate and Preparation of Detailed Project Report (DPR) of Nepal Community Yoga and Naturopathy Centre,
Sainamaina-1, Rupandehi Hospital Building[Project Cost:523 Million Approx.]- Integrated Master Plan;Year: From June,
2015 to Dec,2016 (intermittent- 4 months); Location: Sainamaina, Rupandehi; Employer: ECoCoDE Nepal (P) Ltd., Main
Project Features: Preparation of Topographic Map, Master Plan, Detailed Survey, Detailed Design, Cost Estimate and
Preparation of Detailed Project Report (DPR) ;Position Held : Team Leader/Urban Planner, Activities Performed: Main
Work Includes:(i)Topographic Survey of Proposed Project Site and Preparation of Topographic Map;(ii) Soil
Investigation including Drilling, Lab test and Report Preparation; (iii)Preparation of Detail Master Plan of site responding
topography, soil and water as per site conditions; (iv)Preparation of Detail Architectural Design of the proposed building
along with its supporting facilities(v)Preparation of detailed structural design, structural drawing architectural working
drawings including sanitary & electrical works;(vi)Preparation of digital 3-D model; (vii)Design of Beatification, Design
and Selection of Plantation, Green Zoning, Vegetation, Herbs/Garden, Cost Estimate; (viii)Detailed Design and Cost
Estimate of Swimming Pool, ix)Preparation of detailed Cost Estimate including Civil, Electrical, Sanitary, Acoustic, HVAC
and furniture all complete;(x)Detailed Design Sanitary System (Soil, Waste Water, Water Tanks and Plumbing System) of
Master Plans and Individual buildings;(x)Preparation of Cost Estimate, BoQ and Tender Documents (Bid Documents
and Specifications).
28. Name of assignment or project : Preparation of District Transport Master Plan of Rupandehi, Gulmi and Baglung
Districts under RAP3/DoLIDAR,Year: From June,2015 to Feb ,2016 (intermittent);Location: Rupandehi, Gulmi and
Baglung Districts; Employer: ECoCoDE Nepal (P) Ltd./RAP3, Main Project Features: Preparation of DTMPs; Position Held
: Team Leader/Urban Planner, Activities Performed: The Main Work includes: (i) Collect all required maps of the district
(ii) Prepare and finalize Indicative Development Potential Map (IDPM) (iii) Prepare District Inventory Maps (DIM) of
rural roads network (iv) Collection of demands for new transport linkages within the district (v) Organization of area
workshops, preparation of draft District Transport Master Plan (vi) Finalization of 5 years District Transport Master Plan
(DTMP) of the district and take approval from DRCC.tt.
29. Name of assignment or project : Preparation of Periodic Plan of Bhojpur District, DDC Bhojpur, Year: From March, 2014
to July,2016 (4months);Location: Bhojpur; Employer/Client: ECoCoDE Nepal (P) Ltd./DDC, Main Project Features:
Preparation of PDDP; Position Held : Team Leader/Urban Planner, Activities Performed:The main work includes: (i)
Page 11 of 17
CV# Kumar Dhamala

Conduct the VDC level and District level meetings and workshop (ii) Review of Building Bye Law (iii) Preparation of Long
Term Physical Development Plan(iv) Preparation of Present/existing Land use maps with GIS application (v) Preparation
of Environmental Management Plan (vi) Preparation of Social Impact Assessment Plan (vii) Preparation of Disaster
Management Plan (viii) Preparation of disaster Management Plan (ix) Preparation of Multi Sectoral Investment Plan (x)
Preparation of Land use Zoning Maps (xi) Plan was prepared as with logical framework (xii) Preparation of District
Profile
30. Name of assignment or project : Preparation of Periodic Plan for Narayan Municipality, Year: 2011 , Location: Narayan
Municipality, Dailekh, Nepal , Client: Narayan Municipality, Employer: Welink Consultant P. Ltd , Main Project
Features: 1) Setting long term vision of the municipality and sectoral strategies 2) Preparation of Town Profile 3)
Preparation of Physical, Social, Environmental, Economical and Institutional Development Plan, Disaster management
Plan 4) Preparation of Multi-Sectoral Investment Plan , Position held: Urban Planner , Activities Performed : Organize
workshops on the periodic plan preparation methodology, conduct envisioning workshop, assist in constituting the
steering committee, conduct ward level meetings to explore the local issues and mitigation measures, conduct subject
committee meetings, prepare strategies and action plan, prepare conceptual plans of the probable projects, prepare
monitoring and evaluation method.
31. Name of assignment or project : Feasibility study of water transport along Koshi, Gandaki and Bheri River Basins (450
Km) , Year: 2011 , Location: Koshi, Gandaki and Bheri River Basins of Nepal, Client: MoPPW, Water Transport
Development Project, Employer: ECoCoDE Nepal P. Ltd., Main Project Features: 1) Study of water transport situation
around the river basins 2) Identify the proper route for the water transport 3) propose possible design standard,
guideline, criteria and cost estimate for the water transport 4) Preparation of Typical design for water transport bays,
intermittent stations 5) study of Physical, Social, Environmental, Economical, Geological, hydrological and Disaster
situation along the alignment 6) Preparation of cost estimate 7) mapping the route , Position held: project coordinator
/ Engineer
Activities Performed: Route selection, fixing of alignment, conduct community level meetings to explore the local issues
and mitigation measures for the development of water transport, prepare maps and drawings, cost estimate, propose
32. Name of assignment or project : Preparation of National Urban Development Strategy (NUDS) , Year: 2013-2014,
Location: Nepal , Client: Ministry of Urban Development (MoUD), Physical Planning & Urban Development Division
Main Project Features: 1) Baseline information: In-depth analysis of following data to define hierarchies of urban
centres:
Quantity of basic urban infrastructure demand for current and projected urban population: Drinking water, Sewerage
(treatment and disposal), Solid waste (treatment and disposal), Transportation, Energy, Land and Housing.
Spatial distribution of transportation infrastructure: Strategic and regional roads, Cross border transportation linkages,
Railways, Highways, Airports, Waterways
Spatial distribution, production and consumption of energy infrastructure: Hydro power, Thermal power
Spatial distribution of communication infrastructure: Telecommunication, Optical fiber
Spatial distribution of green infrastructure: Urban forest
Environment profile of urban centers: land, air and water
Current and future initiatives in infrastructure development, which has spatial implications at national and local level.
(New infrastructure development projects: highways, hydropower, airport; alternative energy initiatives, other sectoral
policies, investment and development plans, etc.)
2) Analysis: Analysis tool to calculate future infrastructure and services demand for the desired urban system. Logical
calculation methods, based on existing data, to project the future infrastructure and investment needs.
3) Milestone and implementation Strategies: Measurable and achievable milestones together with clear and specific
strategies to guide MoUD in achieving balanced regional urban systems in terms of investment, infrastructure
development, service provision.
4) Strategic investment needs: Potential strategic investment needs within infrastructure sector in the identified urban
systems, to trigger development efforts through spillover effect. Amount of future investment required for
infrastructure development. The study should be guided by Planning norms, Infrastructure norms and Business plans.
Position held: Infrastructure Planner / Engineer
Activities Performed: Preparation of baseline information on spatial distribution, production and consumption of
infrastructure and services together with projection of infrastructure and services demand for the stipulated period of
time. The assignment includes in-depth analysis of basic infrastructure and services, transportation, communication,
energy, green infrastructure and environment, etc. Formulation of analysis tools, milestones together with strategies to
guide MoUD in achieving balanced regional urban systems. Identification of strategic investment needs within the
infrastructure sector, in the identified urban systems, to trigger development efforts through spillover effect together
with amount of future investment required for infrastructure development.
33. Name of assignment or project : Preparation of Tourism master Plan for Dhankuta District, Year: 2013, Location: DDC,
Dhankuta, Nepal, Client: DDC, Dhankuta, Employer: ECoCoDE Nepal P. Ltd Main Project Features: 1) Setting out vision
of the district for the tourism sector 2) Preparation of district Profile 3) 4) Preparation of Investment Plan,Position held:
Planner, Activities Performed: Organize workshops for the plan preparation, conduct envisioning workshop, conduct
various level meetings to explore the local issues and mitigation measures, prepare strategies and action plan, prepare
conceptual plans of the probable projects, prepare the investment plan, and prepare monitoring and evaluation
Page 12 of 17
CV# Kumar Dhamala

method.
34. Name of assignment or project : Preparation of Periodic Plan for Dhankuta District, Year: 2012, Location: DDC,
Dhankuta, Nepal , Client: DDC, Dhankuta , Employer: ECoCoDE Nepal P. Ltd Main Project Features: 1) Setting long term
vision of the district and sectoral strategies 2) Preparation of district Profile 3) Preparation of Physical, Social,
Environmental, Economical and Institutional Development Plan, Disaster management Plan 4) Preparation of Multi-
Sectoral Investment Plan , Position held: Planner / team leader , Activities Performed : Organize workshops on the
periodic plan preparation methodology, conduct envisioning workshop, assist in constituting the steering committee,
conduct ward level meetings to explore the local issues and mitigation measures, conduct subject committee meetings,
prepare strategies and action plan, prepare conceptual plans of the probable projects, prepare monitoring and
evaluation method.
35. Name of assignment or project : Preparation of Physical Development Plan of Ambotephant Land Pooling,
Lamjung;Year: From May,2015 to July,2015 (3months);Location:Lamjung; Employer/Client: ECoCoDE Nepal (P)
Ltd./DUDBC; Main Project Features: Preparation of PDDP, Position Held : Team Leader/Urban Planner,
Activities Performed: The major works includes (i) Topographic Survey, preparation of Physical dev. Plan (ii) Design of Land
Polling Project including cadastral map overlay, stakeholder consultation (ii) Prepare final Project Report.
36. Name of Assignment: Master Plan, Engineering Survey, Architectural, Structural, Furniture and Acoustic Design and
Detailed Cost Estimate of Multipurpose City Hall in Bidur, Nuwakot. [Project Cost:120 million Approx.];Year: May 15 to
Nov 2015;Location: Bidur, Nuwakot; Employer: ECoCoDE Nepal; Main Project Features: Preparation of Topographic
Map, Master Plan, Detailed Survey, Detailed Design, Cost Estimate and Preparation of Detailed Project Report
(DPR);Position: Team Leader/Urban Planner, Activity Performed:
 Topographic Survey of Proposed Project Site and Preparation of Topographic Map;
 Preparation of Detail Master Plan of site responding topography, vegetation, soil and water as per site conditions;
 Preparation of Detail Architectural Design of the proposed building along with its supporting facilities;
 Preparation of detailed structural design, architectural working drawings including sanitary & electrical works;
 Preparation of digital 3-D model;
 Preparation of detailed Cost Estimate including civil, electrical, sanitary, acoustic, HVAC and furniture all complete.
37. Name of Assignment: Master Plan, Detailed Survey, Detailed Design, Cost Estimate and Preparation of Detailed Project
Report (DPR) of Kushma Municipality Office Building; Year: March, 2015 to Oct 2015 (4months);Location: Kusma
Parbat; Employer/Client: ECoCoDE Nepal/ Kushma Municipality Office; Main Project Features: Preparation of
Topographic Map, Master Plan, Detailed Survey, Detailed Design, Cost Estimate and Preparation of Detailed Project
Report (DPR);Position: Team Leader/Urban Planner , Activity Performed:
 Topographic Survey of Proposed Project Site and Preparation of Topographic Map;
 Preparation of Detail Master Plan of site responding topography, soil and water as per site conditions;
 Preparation of Detail Architectural Design of the proposed building along with its supporting facilities;
 Preparation of detailed structural design, structural drawing architectural working drawings including sanitary &
electrical works;
 Preparation of digital 3-D model;
 Design of Beatification, Design and Selection of Plantation, Green Zoning, Vegetation, Cost Estimate.
 Preparation of detailed Cost Estimate including civil, electrical, sanitary, acoustic, HVAC and furniture all complete.
38. Name of assignment or project : Preparation of District Transport Master Plan of Siraha and Saptari District under
DFID/RTI, SWAp, Year: March,2014 to Feb,2015 ;Location: Siraha District and Saptari District ; Employer/Client:
ECoCoDE Nepal (P) Ltd./RAP3, Main Project Features: Preparation of DTMPs; Position Held: Team Leader/Urban Planner,
Activities Performed: The Main Work includes: (i) Collect all required maps of the district (ii) Prepare and finalize
Indicative Development Potential Map (IDPM) (iii) Prepare District Inventory Maps (DIM) of rural roads network (iv)
Collection of demands for new transport linkages within the district (v) Organization of area workshops, preparation of
draft District Transport Master Plan (vi) Finalization of 5 years District Transport Master Plan (DTMP) of the district and
take approval from DRCC.
39. Name of assignment or project : Preparation of Tourism Master Plan of Dhankutta District, Year:June,2013 to
June,2014; Location:Dhankutta;Employer/Client: ECoCoDE Nepal (P) Ltd./DDC; Main Project Features: Preparation of
Tourism Master Plan; Position Held : Team Leader/Urban Planner, Activities Performed: The main work includes: (i)
Conservation Plan of Cultural and Historical Heritages Plan, i) Infrastructure Plan, ii)Product Development Plan,
iii)Destination Marketing Plan, iv)Human Resource Development Program/Plan, v)Tourism and Environment Awareness
Pogramme /Plan, vi)Conservation and Management of Natural Landscape and Biodiversity Plan, vii)Institutional
Development Plan, viii)Investment Plan, viii)Implementation and Monitoring plan, ix)GIS Mapping and Analysis and x)
Prioritize; finalize the tourism Potential areas and Prepare District Tourism Master Plan of the District.
40. Name of assignment or project: Preparation of Periodic Plan of Dhankutta District; Year: Sept,2012 to
July,2013;Location:Dhankutta; Employer/Client: ECoCoDE Nepal (P) Ltd./DDC, Main Project Features: Preparation of
Periodic Plan; Position Held : Team Leader/Urban Planner Activities Performed: The main work includes: (i) Conduct
the VDC level and District level meetings and workshop (ii) Review of Building Bye Law (iii) Preparation of Long Term
Physical Development Plan (iv) Preparation of Present/existing Land use maps with GIS application (v) Preparation of
Environmental Management Plan (vi) Preparation of Social Impact Assessment Plan (vii) Preparation of Disaster
Management Plan (viii) Preparation of disaster Management Plan(ix) Preparation of Multi Sectoral Investment Plan (x)
Page 13 of 17
CV# Kumar Dhamala

Preparation of Land use Zoning Maps (xi) Plan was prepared as with logical framework (xii) Preparation of District
Profile
41. Name of assignment or project : Preparation of District Transport Master Plan of Manang District, Mustang District ,
Rolpa District , Rukum District, Solukhumbhu District , Bhojpur District and Tehrathum District under DFID/RTI,
SWAp, Year: Jan,2013 to March,2014;Location: Manang District, Mustang District , Rolpa District , Rukum District ,
Solukhumbhu District , Bhojpur District and Tehrathum District; Employer/Client: ECoCoDE Nepal (P) Ltd./RAP3,
Main Project Features: Preparation of DTMPs; Position Held : Team Leader/Urban Planner Activities Performed: The
Main Work includes: (i) Collect all required maps of the district (ii) Prepare and finalize Indicative Development
Potential Map (IDPM) (iii) Prepare District Inventory Maps (DIM) of rural roads network (iv) Collection of demands for
new transport linkages within the district (v) Organization of area workshops, preparation of draft District Transport
Master Plan (vi) Finalization of 5 years District Transport Master Plan (DTMP) of the district and take approval from
DRCC.
42. Name of assignment or project: Feasibility Study and Detailed Engineering Design/IDP of Fast Track Sub project under
Governance and Development Program (UGDP), Emerging Towns Project (ETP), at Tansen and Dhankutta Municipality.
 Amar Narayan Temple Area Conservation and Development Project, Tansen Municipality, Palpa.
 Social Infrastructure Improvement project for Dhankutta Weekly Market, Dhankutta Municipality, Dhankutta.
 Infrastructure Development in Hile Market, Dhankutta Municipality, Dhankutta.
Year:June,2012 to Oct,2013 (intermittent-4 months);Location: Dhankutta and Palpa; Employer/Client: ECoCoDE Nepal
(P) Ltd./TDF, Main Project Features: Feasibility Study and Detailed Engineering Design/IDP of Fast Track Sub project
,Position Held : Sr. Civil Engineer/Urban Planner , Activities Performed: The Main Work includes: Detailed Engineering
Survey, Socioeconomic Survey, Feasibility Study of the Proposed Alternatives, Preparation of Environmental
Management Plan, Social Impact Assessment Plan, Carryout detailed Engineering design report including Preparation
of Master Plan, Drawing, Cost Estimate, BoQ, bidding documents etc for individual sub projects. Preparation of
Technical specification of construction works, Material/Equipment, O & M, Preparation of Detailed O & M Plan,
Economical and Financial Analysis and Preparation of construction Schedule and Detailed Project Report (DPR). The
Urban Development component that are designed and forwarded for implementation are: (i)Temporary and
Permanent Shade for Hat Bazaar.(ii) Construction of Slaughter House (iii) Construction of Bio-Gas Plant (iv)
Construction of Landscape and Beatification Works in Haat Bazaar (v) Construction of Meat Shop (vi)Improvement of
Drainage System (vii) Design of Water Supply System for the Bazaar Area (viii) Design of Public open Space and Park (ix)
Preparation of Temple Area Conservation of Master Plan (x) Renovation of Shiva Temple, Narayan Temple, Vishnu
Paduka and Water Pond (xi) Construction of Information Centre (xii) Construction of Public Toilet (xiii) Construction of
Resting Shade and Gazebo (xiv) Construction of Stone Pavement Works etc.
43. Name of assignment or project : Master Planning of Special Economic Zone Project, Kapilvastu,Year:June,2011 to
July,2013 (8 Months) ;Location: Kapilbastu; Employer/Client: ECoCoDE Nepal (P) Ltd./SEZP, Main Project Features:
Feasibility Study and Master Planning; Position Held : Sr. Civil Engineer/Urban Planner , Activities Performed:The Main
Work includes: (i) Site visit/ organize the meeting with local stake holders (ii) Detailed Topographic Survey of the SEZ
area (Approx. 40 hectare) (iii) Base map Preparation of the SEZ area using AUTOCAD and GIS Application (iv) Socio-
economic Study (Baseline Survey) (v) Environmental Study/Environment Management Plan (vi) Economical and
Financial Analysis (vii) Master Plan of the SEZP using GIS Application.
44. Name of assignment or project : Preparation of Periodic Plan of Narayan Municipality, Dailekh;Year:June, 2011 to June
2012 (4 months); Location: Dailekh; Employer/Client: ECoCoDE Nepal (P) Ltd./Municipality; Main Project Features:
Preparation of Periodic Plan; Position Held : Sr. Civil Engineer/Urban Planner , Activities Performed: The main work
includes: i) Conduct the VDC level and Municipal level meetings and workshop, ii) Preparation of Long Term Physical
Development Plan,iii)Review of Building Bye Law, iv)Preparation of Present/existing Land use maps with GIS
application)Preparation of Multi Sectoral Investment Plan, vi)Preparation of Land use Zoning Maps, vii)Plan was
prepared as with logical framework, viii)Preparation of District Profile based on secondary data resources. ix)
Preparation of Municipal Profile
45. Name of assignment or project : Master Planning of Special Economic Zone Project, Jumla,Year:June,2011 to
May,2012 (8 Months) ;Location: Jumla; Employer/Client: ECoCoDE Nepal (P) Ltd./SEZP, Main Project Features:
Feasibility Study and Master Planning; Position Held : Sr. Civil Engineer/Urban Planner, Activities Performed: The Main
Work includes: (i) Site visit/ organize the meeting with local stake holders (ii) Detailed Topographic Survey of the SEZ
area (Approx. 48 hectare) (iii) Base map Preparation of the SEZ area using AUTOCAD and GIS Application (iv) Socio-
economic Study (Baseline Survey) (v) Environmental Study/Environment Management Plan (vi) Economical and
Financial Analysis (vii) Master Plan of the SEZP using GIS Application.
46. Name of assignment or project: Mapping of Micro hydropower and Preparation of District Electrification Master Plan
(DEMP), Package -6 (Rukum, Rolpa and Pyuthan District), AEPC, MoEn., Year: April, 2011 - July, 2011; Location: Rukum,
Rolpa and Pyuthan District; Employer/Client: ECoCoDE Nepal (P) Ltd./AEPC; Main Project Features: Mapping and
Preparation of District Electrification Master Plan,Position Held : Sr. Civil Engineer/Urban Planner/Team Leader
Activities Performed: The Main Work includes: (i) Desk Study (ii) Walkover Survey (iii) Socioeconomic Study (Baseline
Survey, HH Survey) (iv) Inventory Survey of the Renewal Energy (Micro hydropower, Solar, Biogas Biomass etc.) (v)
Preliminary Survey works (vi) Preliminary Design works (vii) Preparation Master Plan and Mapping of Micro hydropower
with GIS software
47. Name of assignment or project: Engineering Survey, Design, Drafting, preparation and presentation of bill of quantities,
Page 14 of 17
CV# Kumar Dhamala

cost estimation and reports, Construction supervision of Tila Nadi bridge, Jumla, Year: 2011, Location: Jumla District
Nepal ,Client: DDC, Jumla, MoLD, GoN, Employer: ECoCODE Nepal P. Ltd., Main project features: Preparation of
Drawings, Bill and BOQs, Attending meetings with the clients and contractor, Construction Supervision, mobilizing and
managing supervisors and Engineers. Position held: Project Coordinator/Engineer, Activities performed: Attending
meetings with the clients and contractors, Construction Supervision, mobilizing and managing supervisors and
Engineers, Preparation and presentation of Bills and Progress reports.
48. Name of assignment or project : Master Planning of Sewerage and Drainage Master Plan of Bhadrapur Municipality,
Jhapa; Year:July,2010- July,2011 (9 Months),Location:Bhadrapur Jhapa; Employer/Client: ECoCoDE Nepal (P)
Ltd./Municipality; Main Project Features: Preparation of Master Plan; Position Held : Sr. Civil Engineer/Urban
Planner/Team Leader, Activity Performed: (i)Desk Study (ii) Walkover Survey (iii) Socioeconomic Study (Baseline
Survey, HH Survey) (iv) Inventory Survey of Drainage System (v) Detailed Topographic Survey and Detailed Design (vi)
Preparation of Drainage Master Plan with GIS software [Total Project Cost: 240 Million Approx] funded by TDC,
Municipality, TDF etc.
49. Name of assignment or project: Study, Survey and mapping of Micro Hydropower Potentials and Preparation of District
Electrification Master Plan (DEMP),Year: 2011, Location: Dailekh, Surkhet, Salyan, Rukum, Rolpa and Pyuthan Districts,
Client: Alternative Energy Promotion Center, Khumaltar, Lalitpur Main project features: 1. Study and survey the
potential area of the micro hydropower.2.mapping of those potential micro hydropower stations 3. Study the
electrification situation of the district 4. Preparation of the District electrification Master plan.Position held: Team
Leader/ Planner, Activities Performed: Organize community meetings, provide overall guidance to the study team on
the methodology, survey, report preparation plans and prepare reports.
50. Name of assignment or project: Preparation of Periodic Plan of Banepa, Dhulikhel and Panauti Municipality , Year: 2011
, Location: Banepa, Dhulikhel and Panauti Employer, Client: Udle/ GIZ, Main project features: Preparation of Periodic
Plan, Bio-Diversity and Conservation Development Plan, Regional Sports and Recreational Development Plan, Regional
Agro Processing Plan, Road Network Planning for Greater Itahari, Sewerage and Drainage Network Master Plan, Master
Plan Preparation of Industrial Area , Position held: Urban Planner/ Civil engineer , Activities performed: Preparation of
questionnaires, field visits, discussions with the stakeholders, preparation of town profile, physical development plan,
digital base map, delineation of urban expansion area, institutional, social and economic development plan
preparation. The plan is prepared through the stakeholders meetings, focused group discussions to assess and analyze
the needs of the people, project requirements, project prioritization and implementation planning.
51. Name of assignment or project: Master Plan and Detailed Engineering Design and Preparation of DPR (Recreation Centre,
Hall etcs) of National Peace and Martyr’s memorial Park, Jagadol, Gokarna , Kathmandu, MoPRC, PCPRP, Kathmandu
(Project Cost: NRs 1000 Million Approx), Year: July, 2009 to June, 2010; Location; Gokarna, Kathmandu; Employer: RIDC
(P) Ltd.; Main Project Features: Preparation of Master Plan and Preparation of DPR ;Position Held: Sr. Civil Engineer
/Planner, Activities Performed: The Main Work includes:(i)Preparation of Conceptual Master Plan (ii) Conduction of
Topographical Survey (iii) Preparation of Physical Development Plan (iv) Preparation of Investment Plan (v) Preparation
of Implementation Strategy (vi) Technical Analysis (Master Planning, Survey and Engineering Design) (vii) Engineering
Design and Cost Estimate of Various infrastructures (viii) Social Impact Analysis (ix) Environmental Study (x) Institutional
Analysis.
52. Name of assignment or project: Preparation of District Transportation Master Plan of Rasuwa , Gulmi, Salyan, Taplejung,
Manang and Kanchanpur District using DOILDAR’s Approach Manual, Year: July, 2008 - June, 2009 (6 months); Location:
Rasuwa District , Gulmi District, Salyan District, Taplejung District, Manang District and Kanchanpur District ;Employer:
RIDC (P) Ltd.; Main Project Features: Preparation of DTMPs;
Position Held: Sr. Civil Engineer Planner, Activities Performed: The Main Work includes: (i) Collect all required maps
of the district (ii) Prepare and finalize Indicative Development Potential Map (IDPM) (iii) Prepare District Inventory
Maps (DIM) of rural roads network (iv) Collection of demands for new transport linkages within the district (v)
Organization of area workshops, preparation of draft District Transport Master Plan (vi) Finalization of 5 years District
Transport Master Plan (DTMP) of the district and take approval from DRCC.
53. Name of assignment or project : Preparation of Periodic Plan for Bharatpur Municipality, Year: June 2010 - December
2010 , Location: Bharatpur Municipality, Bharatpur, Nepal , Client: Bharatpur Municipality, Bharatpur, Nepal,
Employer: Welink Consultant P. Ltd., Main Project Features: 1) Setting long term vision of the municipality and sectoral
strategies 2) Preparation of Town Profile 3) Preparation of Physical, Social, Environmental, Economical and Institutional
Development Plan 4) Preparation of Multi Sectoral Investment Plan , Position held: Urban Planner , Activities
Performed : Organize workshops on the periodic plan preparation methodology, conduct envisioning workshop, assist
in constituting the steering committee, conduct ward level meetings to explore the local issues and mitigation
measures, conduct subject committee meetings, prepare strategies and action plan, prepare conceptual plans of the
probable projects, prepare monitoring and evaluation method.
54. Name of assignment or project: Various Projects:
 Study and Master Plan of Model Village programme of Salyan District; MoPRC, PCPRP, Kathmandu (3.5 Months).
 Preparation of Environmental Impact Assessment (EIA) of Thoche Larke Pass Rural-Agricultural Road Of Manang
 Preparation of Initial Environmental Examination (IEE) Report of Thulo Bharkhu- Brabal Rural Road, Syafru, Rasuwa
 Physical Development Plan of Simaraungadh area, Bara under DUDBC, Division Office, Birgunj(4 Months)
Year: July, 2005 - Jun, 2010 (different Times); Location: Various Locations; Employer/Client: RIDC (P) Ltd./Different
Clients; Main Project Features: Study, Master Planning and Environmental Study; Position Held: Sr. Civil Engineer
Page 15 of 17
CV# Kumar Dhamala

Planner,
55. Name of assignment or project : Rural Transport Services Study and Policy Development, Year: 2009 - 2010 , Location:
Kathmandu , Client: RAIDP, DoLIDAR, MoLD, GoN, Employer: RIDC P. Ltd., Main Project Features: 1) Topographical and
Geological Surveys 2) Detailed design of the components in Memorial Zone, Recreational Zone, Institutional Zone and
Religious Zone through stakeholders' consultation 3) Preparation of Forest Conservation and Environmental Plan,
Project Investment and Implementation Plan, Project Management Plan , Position held: Planner/ Civil Engineer,
Activities Performed: Involved in rural transport services study and policy development which includes traffic study and
prepare guideline for design of road safety measures, assess the demand characteristics, identify the mobility and
transport needs, develop a pilot scheme (one Terai and one Hill District) and support the implementation.
56. Name of assignment or project: Study and report preparation of the “Need Identification” of the Siraha and Rajbiraj
Municipality, Year: 2009 , Location: Siraha and Rajbiraj Municipality, Siraha and Saptari District, Client: Department of
Urban Development and Building Construction, MoPPW, GoN , Employer: RIDC P. Ltd. , Main project features: Identify
the various needs of the municipality based on physical, socioeconomically, environmental management, disaster
management, institutional development demands of the municipality area, prepare and identify the projects based on
the needs, prepare cost of the projects, mapping of the projects., Position held: Urban Planner/ Civil engineer,
Activities performed: Preparation of questionnaires and check list, field visits, discussions with the stakeholders.
Identify the projects for the overall development of the municipality for the Saudi fund.
57. Name of assignment or project: Study and report preparation work for the “Disaster management Framework (DMF)”
of Nepal for MoPPW/MoHA. Year: 2009, Location: Kathmandu, Client: Department of Urban Development and
Building Construction, Employer: SITARA Consultant P. Ltd., Main project features: Preparation of Disaster
management framework (DMF) for the nation. Position held: Team Leader/ Planner/ Disaster Risk Management
expert, Activities performed: Study, report Preparation and presentation of the disaster management framework
(DMF) for DUDBC and MoHA.
58. Name of assignment or project: Preparation of Periodic Plan/Infrastructure Plan of Greater Itahari of Itahari
Municipality’; Location: Itahari; Year: March 2007 - July 2007 (4months) ; Employer: We Link Consultancy Pvt. Ltd. ;
Main Project feature: Preparation of Periodic Plan; Position Held: Sr. Civil Engineer /Planner, Activities Performed:
 Preparation of Periodic Plan of Itahari Municipality
 Preparation of Inventory of Bio-Diversity, Conservation & Development Plan of Tal-Talaiya (Park) in Itahari Municipality
 Study and Plan preparation of Regional Sports and recreational facilities in Greater Itahari
 Study and Plan preparation of development of Regional collection, storage, processing and export center of the
Agriculture and Livestock products in Greater Itahari
 Preparation of Sewerage and Drainage network Master Plan in Greater Itahari
 Preparation of Master plan of Industrial Area in Greater Itahari
 Preparation of Master Plan of Road network in Greater Itahari
59. Name of assignment or project: Design and Construction Supervision of Various Building Projects; Year: Sept, 2006 -
2007 (Part Time) ,Location: Kathmandu; Employer: Dhamala Construction & Engineering Company Pvt. Ltd., Main
Project Features: Planning, Design and Supervision; Position Held: Civil Engineer
Worked as Associate of Managing Director; Planning, Designing, Cost Estimate, Rate analysis of projects, prepare
contracts, agreements, reports, Bill and BOQ, construction supervision of new building, renovation & rehabilitation of
traditional / Old Buildings.
60. Name of assignment or project: Planning, Designing, quantity and Cost Estimate, Rate Analysis, Preparing Contracts,
agreements, Bill and Reports, Construction supervision of Projects, Year: Aug, 2003 - Feb, 2005; Location: Kathmandu;
Employer Design Cell Pvt. Ltd., Main Project Features: Planning, Design and Supervision; Position Held: Civil Engineer,
Activities Performed: Worked as Civil Engineer; Planning, Designing, quantity and Cost Estimate, Rate Analysis,
Preparing Contracts, agreements, Bill and Reports, Construction supervision of Projects.
61. Name of assignment or project: Planning, Designing, quantity and Cost Estimate, Rate Analysis, Preparing Contracts,
agreements, Bill and Reports, Construction supervision of Projects, Year: 1995-1999, Location: Kathmandu; Employer
Nest interiors Pvt. Ltd., Main Project Features: project Supervision; Position Held: Jr. Civil Engineer, Activities
Performed: Worked as Civil Engineer; Planning, Designing, quantity and Cost Estimate, Rate Analysis, Preparing
Contracts, agreements, Bill and Reports, Construction supervision of interior designing Projects.
Expert's Contact Information: Email: kumardai@gmail.com, Mobile No. 9851076265

Certification:
I, undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience
(ii) I am not a current employee of the GoN
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs
specified for me in ToR provided. team mobilization takes place within the validity of this proposal.
(iv) I was not part of the team who wrote the terms of references for this consulting services assignment
(v) I am not currently debarred by a multilateral development bank ( In case of DP funded project)
(vi) I certify that I have been informed by the firm that it is including my CV in the Proposal for the aforementioned
Page 16 of 17
CV# Kumar Dhamala

Consulting services. I confirm that I will be available to carry out the assignment for which my CV has been submitted
in accordance with the implementation arrangements and schedule set out in the proposal.
(vii) I declare that Corruption Case is not filed against me.

I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.

__________________ Date:
[Signature of expert] Day/Month/Year

_________________________________________ Date:
[Signature of authorized representative of the firm] Day/Month/Year
Full Name of authorized representative: .

Page 17 of 17

You might also like