IHHNK-PH1-000-1100-PI-NCR-01

INDUS HOSPITAL & HEALTH NETWROK


Karachi Extension Project

NON-CONFORMANCE REPORT Page: 1 of 2


Project No : Indus Hospital & Health Network Extension Phase-1

Contractor : M/s. Seasonmaster Engineering Limited - SEL

Scope of Work : Delay & Poor Quality Works

Document No. : IH&HN-HB-1-SEL-NCR No. 01

Rev No. : 00

NCR No: 01 Rev No: 00 Date Issued: 28-11-2023 Issued By: Muhammad Anus Wasi

Description of Non Conformance: (List Specification/Drawings, Other attachment)


We have noticed several instances where the HVAC installations have not
met the required specifications & standards, leading to inefficient
performance and potential operational issues. Futhermore we have observed
that your team has not been responsive and fails to implement the necessary
changes. This lack of responsiveness is concerning as it hinders the progress
and timely completion of the project. Additionally, we have noticed a lack of
effort from your side to increase the workforce in order to overcome the
challenges faced during the project. It is crucial to allocate sufficient
resources and manpower to address any obstacles and ensure timely
completion as per the project timeline.

Effect on Construction Schedule:


Yes

Proposed Disposition/Action to Resolve:

Remove and redo: As required


Repair:
Other (Explain):
Comment / Required Action by the Contractor:

The Contractor is required to refrain from all such acts for the betterment of the work and the environment.

Prepared By: Name: Muhammad Anus Wasi Date: 28/Nov/22

Noted By: Name: Syed Zain Ali Zaidi Date: 28/Nov/22

Acknowledgement of receipt by Contractor:

Name: Signature: Date:

IHHNK-PH1--000-1100-PI-NCR-018 Page 1 of 2
Page: 2 of 2
Contractor Proposed Action/Remedial Measure:

Remedial Work will be carried out by the Date:

Contractor’s HSE Incharge/Representative

Name: Signature:
Date:

Contractor’s Project Manager Signature:


Name:
Date:

IHHNK-PH1--000-1100-PI-NCR-018 Page 2 of 2