INTEGRATION OF A NEW PREFLASH SECTION
REVAMPING OF REFORMER UNIT / SAR
Serio- TECHNIP REQUISITION NUMBER:
073576C-100-MR-0570-0001
Ventura
TECHNIP ITEM NUMBER:
2020.04.0 C-171
+02'00'
A1003
CLIENT DOCUMENT REFERENCE:
252511-HC
KOCH-GLITSCH ITALY
Hydraulic Calculation
KOCH-GLITSCH ITALY
252511-HC
Number of pages:3
Date
Rev DD/MM/YYY Document Status Written by Checked by Approved by
00 24-09-2019 Issued for Approval FF FM PR
01 01-04-2020 Issued for Approval FF FM PR
Customer's copy.
Strictly confidential. Property of Koch-Glitsch.
VALVE TRAY RATING DATA FINAL
Customer: TECHNIP Order No.: 4400000827 Page: 1/1
End User: SAR Case: As ordered 100% ERHA
Tower: Colonne de Preflash By: OP Date: 01-Apr-2020
HYDRAULIC DATA
Jet Flood % 66 33 79
Downcomer Flood % 66 33 79
Downcomer Backup mm liq 193.7 128.9 236.3
Total Tray ΔP * mm liq 102.2 66.8 128.8
Total Tray ΔP * mBar 6.799 4.399 8.532
TRAY GEOMETRY
Tower Diameter mm 2500.00 No. of Flow Paths 2
Tower Area m2 4.91 Flow Path Length mm 703
Valve Type VG-10
Percent Open Area % 7.69
HYDRAULIC DATA
Jet Flood % 63 34 76
Downcomer Flood % 61 30 73
Downcomer Backup mm liq 142.0 83.5 175.0
Total Tray ΔP * mm liq 85.9 40.4 112.4
Total Tray ΔP * mBar 5.066 2.399 6.666
TRAY GEOMETRY
Tower Diameter mm 1550.00 No. of Flow Paths 1
Tower Area m2 1.89 Flow Path Length mm 1220
Valve Type VG-10
Percent Open Area % 10.74