SELENDANG UTARA ENTERPRISE

i-TECHNOLOGIES SOLUTION
System Solar Synergy, Electrical (Wiring) & Electronic,
SmartHouse IT, Security & Networking

INVOICING ADDRESS
Teratak Chalet [Cabin Biru] Reference No : SU/SS/02/2024
Jalan Sungai Congkak Date : 22 January 2024
Batu 20, Kampung Padang Valid Date : 12 March 2024
43100, Hulu Langat
Selangor.

PURCHASED BY CONTACT DETAIL


KOPERASI KAKITANGAN BSN-KOBANAS Director : Nazz’Edzuan
No. 25-1, Wisma Warisan Phone No. : 6013-635 5531
Jalan Jelatek 2, Jelatek Business Park Moderator : Al Hakim Hassan
54200 Kuala Lumpur Phone No. : 6019-321 2115
Kuala Lumpur Email : Selendang.utaraa@gmail.com

KOBANAS CAFETERIA QUOTATION – INSTALLATION SYSTEM SOLAR SYNERGY


SCHEDULE :

Quantity Descriptions Price Per-unit Total Price


MPPT Hybrid Inverter 100 Kw – 3 Phase
1 unit MYR 78 190.00 MYR 78 190.00
Industrial Building/Factory (High Spec)
Solar Panel Monochrome 700 watt – voltage
92 Pcs MYR 973.20 MYR 89 534.40
39.6 Vamp (238.4cm*130.3)
20Kw LifePO4 Battery Lithium 51.2v
6 Unit MYR 3 291.00 MYR 19 746.00
200Ah

16 Set Mounting Bracket MYR 167.18 MYR 2 674.88

1 Set PV Array Combiner Rack Box MYR 823.85 MYR 823.85

20 Rolls PV Cable 10AWG Heavy Duty 6.1 mm MYR 325.21 MYR 6 504.20

Utilities - Tools Part/Sky folding Lift MYR 16 000

Installation Service Charge MYR 5 000

Amount Cost Subtotal MYR 218,473.33


(Tax% including charge Import
duty/postage/custom duty) Tax% MYR 28 960.47

Total : MYR 247,433.80

Rechecked By,

………………………………………………..………………..
(MHD NUR SAIFUL IDZUAN BIN ABU BAKAR)
EXECUTIVE DIRECTOR