on dated 13/6/2023
Testing team reached at site 12/06/2023 .The following work has been carried at 18MW Generator
Relay Panel
1.0 Metering CT & PT Secondary Injection check at load 100%, 75%, 50% and 25% has been tested
successfully.
(Check: MW, MVAR, PF, FREQUENCY, VOLTAGE, CURRENT, MVA, GOVERNER RELAY)
2.0 Relay Siemens Make 7UM62 at GRP panel following protection check successfully
3) Diff protection, o/c protection, thermal, NPS, Reverse power, under & over voltage
under & over frequency, under excitation, Impedance all protection check.
Note: Testing team leave at side due to Siemens OEM leave for Cyclone Red Alert.