Pearl GTL

Project
LINDE ENGINEERING
Shell Project No: HP-3000-QAT Contractor Project No : 5887
Project Document Number: T- 4.234.086 Project Rev.: B Page 1 of 10

SUPPLIER/VENDOR DOCUMENTATION
Purchase Order Number: 2MH127

Equipment Description: N/A


Vendor/Supplier
Vendor/Supplier Name: GAMA QATAR CO. W. L. L. LOC470
Code :
Document Title: METHOD STATEMENT FOR MONITORING OF CONCRETE FOUNDATIONS
Vendor/Supplier Vendor/Supplier
GAM-MTS-CIV-GTL-019
Doc Number: Revision: E
Tag/Item Number(s): SEE NEXT PAGE

Unit: SEE NEXT PAGE PCWBS: SEE NEXT PAGE

Vendor/Supplier Prepared Vendor/Supplier


Vendor/Supplier Approved By
By Checked By Initials / Signature Vend/Supp
Initials / Signature Initials / Signature Revision Date
SB UA AG 06.07.2009
Status of Submission (tick applicable box before submission)
For Review/Info: Final: X Certified: As-Built:
Purchaser signature below does not indicate responsibility or liability for accuracy or completeness of this document, nor
does it alter any contractual terms or conditions or relieve the Supplier/Vendor of his contractual obligations.

PURCHASER AREA BELOW


Contractor Contract Number: PI – 092 Contractor Name : LINDE
Contractor Doc. No: GAMAC-0100-C-PC 1019 Contractor Rev no : 3.0

Contractor Initials Date


Review Code and Status / Signature signed

No Comments. ACCEPTED.
X Code 1 Work May Proceed.

Comments As Noted. Incorporate Comments, Revise and


Code 2 Resubmit. Work May Proceed.

REJECTED. Incorporate Comments, Revise and Resubmit.


Code 3 Work May NOT Proceed.

Code 4 Not Reviewed. Work May Proceed.


Pearl GTL
Project
LINDE ENGINEERING

Shell Project No: HP-3000-QAT Contractor Project No : 5887


Project Document Number: T- 4.234.086 Project Rev.: B Page 2 of 10

Purchase Order Number: 2MH127

Tag/Item Number(s): N/A

Unit(s): ASU

PCWBS: Z
QATAR SHELL GTL PROJECT (PEARL)
C2 AIR SEPARATION UNITS CONSTRUCTION

E B 06.07.09 Issued For Final SB UA AG IFF

D A 23.02.08 Ready for construction SB UA ZG RFC

C O 27.12.07 Issued for Company Comments IU MC/UA ZG ICC

B 25.12.07 Issued for Review IU MC/UA ZG IFR

A 24.12.07 Issued for Internal Review IU MC/UA ZG IIR

GAMA Project Prepared Checked Approved


Date Description Status
Rev. Rev By By By
No. No. ORIGINATOR

Document Title:

METHOD STATEMENT FOR MONITORING OF


LINDE ENGINEERING AG CONCRETE FOUNDATIONS
Contractor Document No.
LOC470
GAM MTS CIV GTL 019 E
Org. Doc. Disc. Geogr. Seq. Rev.
Gama Qatar Co. W. L. L. Vendor Code
Code Type Code Area No No

Project Document Number: T-4.234.086 Rev No: B


GAM-MTS-CIV-GTL-019 Rev. E
Doc. Title :
Method Statement for Monitoring of Concrete Foundations

Q A T A R Date : 06.07.2009

CONTENTS

1. PURPOSE_______________________________________________________________________5
2. SCOPE_________________________________________________________________________5
3. REFERENCES__________________________________________________________________5
4. DEFINITIONS___________________________________________________________________5
5. RESPONSIBILITY_______________________________________________________________6
5.1. Site Manager______________________________________________________________________6
5.2. Surveyor__________________________________________________________________________6
5.3. QA/QC Inspector__________________________________________________________________6
6. METHOD OF EXECUTION_______________________________________________________6
6.1. General___________________________________________________________________________6
6.2. Monitoring intervals of foundations_________________________________________________7
6.3. Settlement behavior_______________________________________________________________7
6.4. Monitoring of settlement___________________________________________________________7
6.5. Monitoring of tilting________________________________________________________________8
6.6. Slopes____________________________________________________________________________8
6.7. Tank foundation___________________________________________________________________8
7. HSSE___________________________________________________________________________8
8. QUALITY ASSURANCE___________________________________________________________8
9. ATTACHMENTS________________________________________________________________9

T-4.234.086 Rev. B Page 4 of 10


GAM-MTS-CIV-GTL-019 Rev. E
Doc. Title :
Method Statement for Monitoring of Concrete Foundations

Q A T A R Date : 06.07.2009

1. PURPOSE
This document describes the methods proposed to be used for the Monitoring of concrete
foundations that will be carried out as part of ASU Construction Works of Qatar Shell GTL Plant
(Pearl) in Ras Laffan Industrial City of Qatar including similar works in TSF Area.

2. SCOPE
This method statement identifies the monitoring activities of concrete foundations during and after
construction.

3. REFERENCES
T.4.234.542 Project Quality Plan
34.11.00.10 GEN Site Investigations
34.11.00.11 GEN Site Preparation and Earth works (Amendments T.13.376.352E)
34.11.00.12 GEN Geo Technical and Foundation Engineering
(Amendments T.13.376.360E)
BS 5930 Site Investigation
BS 6031 Earthworks
BS 8110 The Structural use of Concrete

4. DEFINITIONS

Company : QSGTL or its PMC


Contractor : Linde Engineering AG
Subcontractor : Gama Qatar Co. W. L. L.
Contract : QSGTL Pearl Plant – C2 ASU Construction Works
QCP : Quality Control Procedure
ITP : Inspection and Test Plan
QA/QC : Quality Assurance / Quality Control

T-4.234.086 Rev. B Page 5 of 10


GAM-MTS-CIV-GTL-019 Rev. E
Doc. Title :
Method Statement for Monitoring of Concrete Foundations

Q A T A R Date : 06.07.2009

5. RESPONSIBILITY
5.1. SITE MANAGER
The site manager will provide inputs to the project monitoring plan to ensure that Strategies
& philosophy are properly addressed.
5.2. SURVEYOR
Provide the markings and verify all details and record.

5.3. QA/QC INSPECTOR


Coordinate the monitoring to be done as per the specification and interval.

Maintain all the records and make non-conformity if observed. Inform the Contractor about
non-conformities.

6. METHOD OF EXECUTION
6.1. GENERAL
In order to monitor the concrete foundation, the followings are to be checked and recorded:

 depth, area and volume of each excavation


 encountered soil layers-encountered groundwater level
 data of excavation
 date and results of inspection of the bearing layer
 date of (back) filling
 number of fill layers, compaction procedure
 results of compaction tests
 date of pouring the blinding layer
 date of pouring the foundation

6.2. MONITORING INTERVALS OF FOUNDATIONS


Especially Major foundations on soft soil and weak rock should be evaluated by monitoring
of settlement at intervals of:

 2 to 6 weeks during construction of the superstructure


 6 months during the first two years after construction/water testing
 3 to 5 years in the period thereafter

For horizontally loaded foundations, the horizontal movements should also be monitored.

T-4.234.086 Rev. B Page 6 of 10


GAM-MTS-CIV-GTL-019 Rev. E
Doc. Title :
Method Statement for Monitoring of Concrete Foundations

Q A T A R Date : 06.07.2009

The monitoring marks etc. at the structure or foundation shall be installed by the contractor.
During his construction period, the contractor shall be responsible for carrying out the
monitoring.
Concrete foundations are to be marked to check the settlement and tilting.

6.3. SETTLEMENT BEHAVIOR


The settlement behavior of the foundation shall be verified and recorded. Both the total and
differential settlement as well as the increase of the settlements in time shall be calculated.
Where relevant, effects of vibrations on long-term settlement (tilting) shall be taken into
account.

6.4. MONITORING OF SETTLEMENT-MAJOR FOUNDATIONS

 Major Foundations for monitoring Lox tank, Lin tank, Cold box.
 Mark 500 mm / or anchor bolt top elevation as datum from the top of floor elevation at
four location of the foundation during concreting.

 Mark the elevation also.

 Measure the distance, settlement at stated interval in stated in monitoring details.

 The difference in 500 mm/ or anchor bolt is the contraction of concrete.

 The difference in elevation is the settlement of the foundation. If different elevations are
readed, the settlement is improper.

6.5. MONITORING OF TILTING

 Check the coordinates of middle and corner points in the structure in vertical plane
during concrete and recording.

 Verify as stated in the monitoring intervals the middle and the corner points. If found
any difference the same is the tilting. The same is to be recorded.
6.6. SLOPES
The stability of a slope should be monitored over a minimum period of six months after
completion of that slope. As a minimum a monthly visual inspection for cracks and
deformations shall be carried out. For major works monitoring should also comprise
measurements of pore pressure, settlements and horizontal displacements.

6.7. TANK FOUNDATION


The tank foundation also checked as concrete foundation. During water test, the tank
settlement shall be monitored by the Tank Contractor.

T-4.234.086 Rev. B Page 7 of 10


GAM-MTS-CIV-GTL-019 Rev. E
Doc. Title :
Method Statement for Monitoring of Concrete Foundations

Q A T A R Date : 06.07.2009

7. HSSE
All works shall be in compliance with the State of Qatar laws and regulations, Ras Laffan Industrial
City and international standards/codes, and Company and Contractor requirements and
instructions.
All personnel will go through Gama, Linde and Company Safety Induction courses as well as other
trainings as identified by their supervisor. Please see Document Number GTL-GM-001-A-5635 for
details.
All personnel will have PPE required for their specific tasks in addition to the minimum PPE
(coveralls, safety goggles, safety shoes, high-visibility vests, gloves) at site at all times as required.
In the event of a release, fire or explosion, employees will secure their area and evacuate to the
nearest muster point. Once all employees are evacuated the supervisor will conduct a headcount to
verify all employees are out of harms way. The supervision will report this to Contractor. Emergency
Contact numbers for Company, Contractor and Gama will be posted onsite.
All vehicles and equipment used for the subject work will be inspected and certified as required.
Drivers and operators will be competent and will have attended all required trainings set forth in
project procedures and specifications.

8. QUALITY ASSURANCE

A Quality Assurance System shall be operated conforming to related standards. Controls and
checks shall be established and documented through relevant GAM-PRO-QAC-GTL-027 (QCP),
GAM-QCR-QAC-GTL-110 (QCR).

9. ATTACHMENTS

 JSA

T-4.234.086 Rev. B Page 8 of 10