Equipment installation detail drawing

Cooling Tower

SENIPAH COMBINED CYCLE EXPANSION PROJECT


RCR DOCUMENT NO: E-0002514-173-04415
Issued 13-Dec-18 VENDOR DOCUMENT NO: SAP-M-RCR-0016 Rev. 0

Revision History

Rev. No. Date Description of change


0 13-Dec-18 Issued For Construction
SENIPAH COMBINED CYCLE EXPANSION
PROJECT
Date : 12-Dec-2018

PT RCR ENERGY INDONESIA Rev :0

RCR DOCUMENT DESCRIPTION:


EQUIPMENT INSTALLATION DETAIL DRAWING

RCR DRAWING NO.:


E-0002514-173-04415

TABLE OF CONTENTS
VENDOR DRAWING DRAWING TITLE TOTAL REV.
NO. PAGES
IOUT1050-PD-VDL-07 WATER DISTRIBUTION INSTALLATION 1 0
DRAWING
IOUT1050-PD-VDL-08 FAN CYLINDER INSTALLATION 3 0
DRAWING
IOUT1050-PD-VDL-09 FILL AND FILL SUPPORT INSTALLATION 4 0
DRAWING
IOUT1050-PD-VDL-10 DRIFT ELIMINATOR INSTALLATION 3 0
DRAWING
IOUT1050-PD-VDL-11 FAN DECK INSTALLATION DRAWING 2 0
IOUT1050-PD-VDL-12 CASING INSTALLATION DRAWING 6 0
IOUT1050-PD-VDL-13 STAIRWAY INSTALLATION DRAWING 3 0
IOUT1050-PD-VDL-14 HANDRAIL INSTALLATION DRAWING 4 0
IOUT1050-PD-VDL-15 ACCESS HATCH INSTALLATION 2 0
DRAWING
IOUT1050-PD-VDL-16 REMOVABLE WALKWAY 2 0
INSTALLATION DRAWING
IOUT1050-PD-VDL-17 CAGE LADDER INSTALLATION 1 0
DRAWING
IOUT1050-PD-VDL-18 DOUBLE TRASH SCREEN 1 0
INSTALLATION DRAWING
IOUT1050-PD-VDL-18F DOUBLE TRASH SCREEN FABRICATION 3 0
DRAWING
IOUT1050-PD-VDL-19 LIFTING DEVICE INSTALLATION 1 0
DRAWING

SEAGULL COOLING TECHNOLOGIES (ASIA PACIFIC) SDN BHD


Suite 6-4, Level 6, Menara Milenium, No.8, Jalan Damanlela, Pusat Bandar Damansara,
50490, Kuala Lumpur, Malaysia
Website: www.seagull-ct.com
REFER TO JOINT DETAIL "J19"
IN DRAWING
IOUT1050-PD-VDL-04-22

FRP 6C GIRT

WS

0
75
Ø
5
670 783 630 720 693 720 800 800 800 800 800 800 800 623

305
750
750

5790
750

WH1
780

WU1 1 2 3
(FIELD DRILL HOLE)
720
750
650

300

TRANS.GIRT
850

BEAM (4C6)
850
650
750

6350
WH2
750

168
11 (4 nos) 4 PIPE SEALER RING
750

100
750
677

Ø160

2225
WV
WU2 1 2 3
4210 6210
(FIELD DRILL HOLE)
WL2

WL1
Ø767

60
Ø1
8 9 10
8 9 5 6 7

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:50 TELUK PAMEDAS, EAST KALIMANTAN,
A - 17 MAY 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG IOUT1050-PD-VDL-07-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION XY.LEE YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
XY.LEE 17 MAY 2018

YY.YONG 03 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA WATER DISTRIBUTION INSTALLATION DRAWING
YY.YONG 04 JUL 2018

ZH.YANG 05 JUL 2018


PT TRUBA JAYA ENGINEERING
立面图
ELEVATION VIEW

TF3
TF1
TF1

TF1 TF1
A-A
´ ¶¯

1:15
TF1
TF1
B-B
1:15

TF1
TF1

TF1 TF1

TF2

俯视图
PLAN VIEW

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 10 MAY 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG IOUT1050-PD-VDL-08-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION XY.LEE YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
XY.LEE 10 MAY 2018

YY.YONG 11 MAY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FAN CYLINDER INSTALLATION DRAWING
YY.YONG 12 MAY 2018

ZH.YANG 13 MAY 2018


PT TRUBA JAYA ENGINEERING
BOLT HEAD UP
1 4 5 6
12000 (2)

TP2

1 2 1

2 2

1 1

BOLT HEAD UP BOLT HEAD UP


2 4 5 6 2A 4 5 6
(2) (2) (2) (2) (2) (2)
1 1

2 2

1 1

3 3

1 1

2 2

1 1
3 5
FP08

1 1
7 8 9 10

2 2
TP3
1 1
4

TP3
NOTE #1

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 08 MAY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-08-02
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION XY.LEE YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 08 MAY 2018

YY.YONG 08 MAY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FAN CYLINDER INSTALLATION DRAWING
YY.YONG 08 MAY 2018

ZH.YANG 08 MAY 2018


PT TRUBA JAYA ENGINEERING
TP3 1 2 3 4 (typical 12)

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:8 TELUK PAMEDAS, EAST KALIMANTAN,
A - 08 MAY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-08-03
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION XY.LEE YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 08 MAY 2018

YY.YONG 08 MAY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FAN CYLINDER INSTALLATION DRAWING
YY.YONG 08 MAY 2018

ZH.YANG 08 MAY 2018


PT TRUBA JAYA ENGINEERING
12000

2000 2000 2000 2000 2000 2000


1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000
2000
2000

1 (typ.2)

PB1
2000

12000
2000
2000
2000

6000 6000

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-09-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FILL AND FILL SUPPORT INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000

673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2

2000

= W
n)
2000

.8
H19
2000

12000
L
2000

ITEM FIND. W n L×H PACK QTY. TOTAL QTY.


2000

1 PF 673.2 34 2000×610 324 11016


2000

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-09-02
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FILL AND FILL SUPPORT INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000

2000 2000 2000 2000 2000 2000


646 646 646 646 646 646 646 646 646 646 646 646 646 646 646 646 646 646 408
2000

= W
n)
34
2000

H
2000

12000
L
2000

ITEM FIND. W n L×H PACK QTY. TOTAL QTY.


1 PF1 646 19 2000×750 324 6156
2000

2 PF2 408 12 2000×750 18 216


2000

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-09-03
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FILL AND FILL SUPPORT INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2 673.2

1
2

UF UF

1 1
1

UF

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-09-04
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FILL AND FILL SUPPORT INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
2000 x 6 = 12000

20 20 20 20 20 20 20 20 20 20 20
976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8

2020
2020
2020
2020
2020
2020

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-10-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA DRIFT ELIMINATOR INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
20 20 20 20 20 20 20 20 20 20 20
976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8 976,8
1

3 2

20

UF UF

160
1 1 1

UF

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-10-02
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA DRIFT ELIMINATOR INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
16
2

0.7
1 160
144
A

40
0.7
A DETAILS
40.7×24+43.5=1020.3

40.7×24=976.8

0.7
3

40
4

0.7
B

16
70 470 470
2020
470 470 70
B DETAILS

DE PVC DRIFT ELIMINATOR: SJ-160


2020(L)x160(H)x976.8(W)
QTY: 216 blocks
QTY: 25 sheets per block 4 END CAP P.E 10

3 SJ160-40 ELIMINATOR BRACKET P.E 120

2 PIN P.E 10

1 SJ160-40 DE SHEET P.V.C 25 L=2020

ITEM PART No. DESCRIPTION MATERIAL QTY REMARK


PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415
NTS TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-010-03
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA DRIFT ELIMINATOR INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000

5
630 740 630 630 740 630 630 740 630 630 740 630 630 740 630 630 740 630

FD1 FD1 FD2 FD2 FD3 FD3 FD3 FD3 FD2 FD2 FD1 FD1

(2)
1 2 3 4 FJ5
(FIELD DRILL,
TYPICAL)

FB6 FB7

FB5

FJ4
FB4
FB3
FB2
FB1
FJ4

FJ3
(2) (2)
FD1 FD1 FD2 FD2 FD3 FD3 FD3 FD3 FD2 FD2 FD1 FD1 FJ3
1 2 3 4 1 2 3 4
FJ2 (FIELD DRILL, (FIELD DRILL,
FJ1 TYPICAL) TYPICAL)

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-11-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FAN DECK INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000

2000 2000 2000 2000 2000 2000

FP08 FP08 FP08


FP07 FP07 FP07

FP07 FP07 FP07

FP07 FP07 FP07

FP06 FP06

FP05 FP05

FP04 FP04

28

28

28
L L L
FP03 FP03
610 205 205
FP02 FP02

FP02 FP02
12000

FP01 FP01

FP02 FP02

FP02 FP02

FP03 FP03

FP04 FP04

FP05 FP05

FP06 FP06

FP07 FP07 FP07

FP07 FP07 FP07

FP07 FP07 FP07


FP08 FP08 FP08

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-11-02
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA FAN DECK INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000 12000 12000
4075 4075 4075 4075 4075 4075 4075 4075 4075

CT1 CT1
1100 1100 1100 1100 1178

CR1 CS1 CS1 CS1 CS1 CS1 CS1 CS1 CS1 CS1 CR1

1745
CJ2 CJ2 CJ2

CR2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CR2
CS11 CS11 CS11

5160
CR2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CR2
CS11 CS11 CS11
CR2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CR2

1770
CR2 CS2 CJ3 CS2 CS2 CS2 CJ3 CS2 CS2 CS2 CJ3 CS2 CS2 CR2

CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:80 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-12-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA CASING INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000 12000 12000
4075 4075 4075 4075 4075 4075 4075 4075 4075

CT1 CT1
1100 1100 1100 1100 1177

CR1 CS1 CS1 CS1 CS1 CS1 CS1 CS1 CS1 CS1 CR1

CR2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CR2

5160
CR2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CR2

CR2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CR2

CR2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CS2 CR2

CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1 CJ1

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:80 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-12-02
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA CASING INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000
4575 4575
4075 4075 4075

CT1 CJ4 CJ4 CJ4 CJ4 CJ4 CJ4


1100 1100 1100 1100 1100 1100 1100 1100 1177

CS1 CS1 CS1


CS2 CS2 CS2

5270
CS2 CS2 CS2
CS2 CS2 CS2
CS2 CS2 CS2
CR3 CS3 CS3 CR4
CS2
CR3 CS3 CS3 CR4
CS2

3950
CR3 CS3 CS3 CR4
CS2
CR3 CS3 CS3 CR4
CS2
CJ5 CJ5 CJ5 CJ5 CJ5 CJ5

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:60 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-12-03
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA CASING INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000

4075 4075 4075

1085

1 TYP
CS4 CS4 CS4
583

CS5 CS5 CS5 POSITION OF CASING


1085

CS4 CS4 CS4


479

CS6 CS6 CS6


1085

CS4 CS4 CS4


785

CS7 CS7 CS7


1085

CS4 CS4 CS4


583

CS5 CS5 CS5


1085

CS4 CS4 CS4


635

CS8 CS8 CS8


450

CS9 CS9 CS9 COLUMN


4C/6C

Cutting at beam location

CASING

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:60 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-12-04
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA CASING INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000 12000 12000
4075 4075 4075 4075 4075 4075 4075 4075 4075

CASING
CAB
COLUMN
TYP @ EVERY VALLEY 2
CASING CASING

1 1
TYP @ EVERY VALLEY TYP @ EVERY VALLEY
1085

CS4 CS4 CS4 CS4 CS4 CS4 CS4 CS4 1 CS4


TYP
635

CS8 CS8 CS8 CS8 CS8 CS8 CS8 CS8 CS8

4150
1085

CS4 CS4 CS4 CS4 CS4 CS4 CS4 CS4 CS4


635

CS8 CS8 CS8 CS8 CS8 CS8 CS8 CS8 CS8


555

CS10 CS10 CS10 CS10 CS10 CS10 CS10 CS10 CS10


COLUMN
CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6 CJ6
4C/6C

Cutting at beam location

CASING

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:80 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-12-05
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA CASING INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
CT1 CT1

2 (TYP @ 200mm)
2 (TYP @ 200mm)

TRANS. GIRTS
TRANS. GIRTS
SIDEWALL CASING SHEET
LONG GIRTS LONG GIRTS
10mm DIA. 1
COLUMN CONTINUOUS
COLUMN BEAD OF SEALER
2 3 COLUMN
2 3 @ EVERY VALLEY 2 3
@ EVERY VALLEY (TYPICAL) @ EVERY VALLEY ENDWALL CASING SHEET
(TYPICAL)
SECTION A-A SECTION A1-A1 (TYPICAL)

CR 10mm DIA.
COLUMN 2 3 1 CONTINUOUS
@ EVERY VALLEY BEAD OF SEALER
COLUMN (TYPICAL)
10mm DIA. 10mm DIA.
CONTINUOUS 1 1 CONTINUOUS
BEAD OF SEALER
BEAD OF SEALER
SECTION B-B
CASING 7 6
2 3 CASING 4
@ EVERY VALLEY 2 3 (2)
(TYPICAL) @ 400mm (EVERY 2 VALLEYS)
4 5 6 7
SECTION C-C (@ 500mm) Outside Inside
SECTION D-D
(2)
4 5 6 7 5 5
(Typical @ 250mm)

10mm DIA.
CONTINUOUS
BEAD OF SEALER
1
2 PCS PER GIRT
SECTION E-E
STRUCTURE GIRT
(TYPICAL) 2
Ø514

CASING JOIST

10mm DIA.
CONTINUOUS 1 CASING
BEAD OF SEALER 2 3
@ EVERY VALLEY
(TYPICAL)

SECTION G-G SECTION H-H

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:50 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-12-06
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 09 JUL 2018

YY.YONG 09 JUL 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA CASING INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
C B A
915 915 1000 1000 915 1830 915 915 1830 915 915 1830 915
D D #10
ST01 ST02

D D
ST01 ST02
ST06 SKP3 ST06

F F ST04 ST04

H H
1600

ST05 ST02 ST02

ST26 ST07 ST13 ST14

E E
ST05 ST02 ST02
ST06 SKP3 ST06 SKP4
ST04 ST04

G G

3544
1600

ST05
M M ST02
ST29 ST30 ST29A ST30
ST02
ST29B ST30

ST13
ST14
ST05 ST02 ST02
SKP4 ST06 SKP3 ST06
ST04 ST04

N ST27 ST28 ST27 ST28A ST27 ST28B


1600

ST02 ST02
H H ST13 ST14

N
ST08 ST02 ST02
ST06 SKP3 ST06 SKP4
ST04 ST04
13450

3192
1600

ST02 ST02
#1 #1 #1 #1
ST13
ST14
ST02 ST19 ST20 ST19A ST20 ST02 ST19B ST20
SKP4 ST06 SKP3 ST06
ST04 ST04
1600

ST02 ST02
H H ST13 ST14
ST17 ST18 ST17 ST18A ST17 ST18B

ST08 ST02 ST02


ST06 SKP3 ST06 SKP4
ST04 ST04
1600

ST02 ST02

ST13
ST14
4761

ST02 ST02 ST19B ST20


SKP4 ST06 SKP3 ST06
ST04 ST04
1600

ST02 ST02
ST13 ST14

ST02 ST02
ST06 SKP3 ST06 SKP4
ST04 ST04
1150

ST25

ST15

C B A
ST16

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-13-01
-
@A1 SIZE INDONESIA D
B 13 SEP 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG
C - 15 NOV 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG SENIPAH COMBINED CYCLE EXPANSION PROJECT
D - 05 DEC 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG TH.TAN 09 JUL 2018
0 - 12 DEC 2018 ISSUED FOR CONSTRUCTION XY.LEE YY.YONG ZH.YANG YY.YONG 09 JUL 2018
RCR Energy
Indonesia PT RCR ENERGY INDONESIA STAIRWAY INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
915 915 1000 1000

915 915
STT02 915 915

2000

915
4- 1 5 6 7 8

915
SB2 ST05 SB2
915 915 1000 1000

915
STT03
SB2
ST02 ST02

(2)
SB2 ST01 5- 2 5 6 7 8

915
(2)
10- 2 5 6 7 8 6- 1 5 6 7 8
ST02

1830
1830
SB2 STT01
ST03
STT01
2000
FJC

AB7

915 915

915
915
#9

2000
ST21
2000
SB3 2- 15 5 6 7 SB3
SKP5

915
ST23
STT03 SKP4 SKP3
915 915 1000 1000 (2)
5- 17 5 6 7

SB3 1- 15 5 6 7
SKP1 ST24 AB7
915

915

915
SKP3 (2)
10- 17 5 6 7

2000
SKP2 ST23
AB7
FJC

ST10
ST09

1830
915 915 1000
ST24
(2) 915 915 (2) 915 915 (2)
30- 9 12 13 14 31- 9 12 13 14 ST21 37- 9 12 13 14
ST21A ST22 TOWER COL.
AB7

-4 1112 13 14 ST23
(2)
915
915

915

ST34 ST34 ST34 ST33 ST34 ST33

2000
915
ST22
(2)
14- 9A 12 13 14
453 453 460 425
FJC
(2)
2000 8- 10 12 13 14
ST24

(2)
1830
1830

1830

12- 11 12 13 14
AB7

ST31 ST32 ST31 ST32


ST31 ST31

453 453

2000
453 453 ST31 ST32 ST31
ST21 ST21

#7 #7
ST34 ST34
ST34 ST34
915
915

915

ST21 ST21 ST21

915 915 915 915 AB7

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:25 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-13-02
-
@A1 SIZE INDONESIA 0
B 13 SEP 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG
C - 15 NOV 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG SENIPAH COMBINED CYCLE EXPANSION PROJECT
D - 05 DEC 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG TH.TAN 09 JUL 2018
0 - 12 DEC 2018 ISSUED FOR CONSTRUCTION XY.LEE YY.YONG ZH.YANG YY.YONG 09 JUL 2018
RCR Energy
Indonesia PT RCR ENERGY INDONESIA STAIRWAY INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
STAIRCASE COL. AB5
STAIRCASE COL.

SP1

ST12 DRILL ON SITE


STAIRCASE COL.
24- 9A 12 13 14
(2) STAIR TREAD
BP1 (2) HANDRAIL
(2) 24- 20 21 22 23 216- 16 5 6 7 3T6 COL.

48- 9B 12 13 14 64- 2 5 6 7 8 (2)


216- 15 5 6 7

ST11 ST11
RC FOUNDATION
STAIRCASE COL.

RAILING POST RAILING POST


SECONDARY BEAM 29
STAIRCASE COL. AB8
STRINGER

STRINGER MIDDLE BEAM


AB8
HANDRAIL

(2)
32- 4 5 6 7 8
(2)
60- 19 12 13 14
(2)
32- 3 5 6 7 8

COLUMN @COOLING TOWER

DRILL ON SITE 24 25 26 27 28
BOLT INITIAL LOCATION
4- 18 12 13 14 @350
Q Ø14
@350

(SLOTTED HOLE

50
BY SITE)
4- 20 21 22 23
AB6

400
BOLT INITIAL LOCATION

RC FOUNDATION

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:20 TELUK PAMEDAS, EAST KALIMANTAN,
A - 09 JUL 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-13-03
-
@A1 SIZE INDONESIA 0
B 19 SEP 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG
C - 15 NOV 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG SENIPAH COMBINED CYCLE EXPANSION PROJECT
D - 05 DEC 2018 ISSUED FOR REVIEW XY.LEE YY.YONG ZH.YANG TH.TAN 09 JUL 2018
0 - 12 DEC 2018 ISSUED FOR CONSTRUCTION XY.LEE YY.YONG ZH.YANG YY.YONG 09 JUL 2018
RCR Energy
Indonesia PT RCR ENERGY INDONESIA STAIRWAY INSTALLATION DRAWING
YY.YONG 09 JUL 2018

ZH.YANG 09 JUL 2018


PT TRUBA JAYA ENGINEERING
12000 12000 12000
4035 3995 3995 3995 3995 3995 3995 3995 4035
(HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL)
2038 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2038
(KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE)
HR2 1 HR1 1 HR1 1 HR1 1 HR1 1 HR1 1 HR1 1 HR1 1 HR2

HR2 HR1 HR1 HR1 HR1 HR1 HR1 HR1 HR2

KP2 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP2
KP1

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:50 TELUK PAMEDAS, EAST KALIMANTAN,
A - 16 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-14-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 16 JULY 2018

YY.YONG 16 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA HANDRAIL INSTALLATION DRAWING
YY.YONG 16 JULY 2018

ZH.YANG 16 JULY 2018


PT TRUBA JAYA ENGINEERING
12000 12000 12000
625
2075 1410 3995 3995 3995 3995 3995 3995 3995 4035
(HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL)
2075 1415 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2038
(KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE)
2
HR7 HR6 1 HR1 1 HR1 1 HR1 1 HR1 1 HR1 1 HR1 1 HR1 1 HR2

HR7 HR6 HR1 HR1 HR1 HR1 HR1 HR1 HR1 HR2

KP6 KP5 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP1 KP2

LC1

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:50 TELUK PAMEDAS, EAST KALIMANTAN,
A REV 16 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-14-02
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 16 JULY 2018

YY.YONG 16 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA HANDRAIL INSTALLATION DRAWING
YY.YONG 16 JULY 2018

ZH.YANG 16 JULY 2018


PT TRUBA JAYA ENGINEERING
12000 12000

1950 5120 3905


3905 3995 3905
(HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL)
(HAND & KNEE RAIL) (HAND & KNEE RAIL) (HAND & KNEE RAIL)
915
2000 1122 2000 2000 2000 1960
1960 2000 2000 2000 2000 1960
(KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE)
(KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE) (KICK PLATE)
2
HR3 HR4 1 HR5
HR5 1 HR1 1 HR5

HR3 HR4 HR5


HR5 HR1 HR5

KP7 KP3 KP1 KP1 KP1 KP4


KP4 KP1 KP1 KP1 KP1 KP4

FJC

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:50 TELUK PAMEDAS, EAST KALIMANTAN,
A - 16 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-14-03
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 16 JULY 2018

YY.YONG 16 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA HANDRAIL INSTALLATION DRAWING
YY.YONG 16 JULY 2018

ZH.YANG 16 JULY 2018


PT TRUBA JAYA ENGINEERING
SB1 SB1

(2)
(2) (2) 1 6 7 8
1 6 7 8 1 6 7 8

SB1 SB1

(2)
(2) (2)
1 6 7 8
1 6 7 8 1 6 7 8

(4) (4) (2)


9 9 9

(2) SB2
(2) 4 6 7 8 (2)
SB2
1 6 7 8 (4) 5 6 7 8
TYP.3
9
TYP.3

(2) (2)
1 6 7 8 2 6 7 8

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 16 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-14-04
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 16 JULY 2018

YY.YONG 16 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA HANDRAIL INSTALLATION DRAWING
YY.YONG 16 JULY 2018

ZH.YANG 16 JULY 2018


PT TRUBA JAYA ENGINEERING
12000 12000 12000

2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000

346

2000
ACCESS
HATCH

2000

1000
2000

12000

770
2000
571

2000
2000
PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415
1:100 TELUK PAMEDAS, EAST KALIMANTAN,
A - 17 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-15-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 17 JULY 2018

YY.YONG 17 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA ACCESS HATCH INSTALLATION DRAWING
YY.YONG 17 JULY 2018

ZH.YANG 17 JULY 2018


PT TRUBA JAYA ENGINEERING
346
1000
571 148
770 AL 4C/6C GIRT

963
AB

AB
1917

1 2 3 4
8 7 6 5

AB

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:30 TELUK PAMEDAS, EAST KALIMANTAN,
A - 17 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-15-02
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 17 JULY 2018

YY.YONG 17 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA ACCESS HATCH INSTALLATION DRAWING
YY.YONG 17 JULY 2018

ZH.YANG 17 JULY 2018


PT TRUBA JAYA ENGINEERING
12000

RC
WALKWAY C WALKWAY C
12000

1 2

WALKWAY A WALKWAY B

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 17 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-16-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 17 JULY 2018

YY.YONG 17 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA REMOVABLE INTERNAL WALKWAY INSTALLATION DRAWING
YY.YONG 17 JULY 2018

ZH.YANG 17 JULY 2018


PT TRUBA JAYA ENGINEERING
RL2

RP3

RL1 RL1

118 150 (TYPICAL)

RP1 RP2

LADDER

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04413


1:15 TELUK PAMEDAS, EAST KALIMANTAN,
A - 17 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-16-02
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 17 JULY 2018

YY.YONG 17 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA REMOVABLE INTERNAL WALKWAY INSTALLATION DRAWING
YY.YONG 17 JULY 2018

ZH.YANG 17 JULY 2018


PT TRUBA JAYA ENGINEERING
3T6
275
6 9 10 11
7 9 10 11
1 3 4 5

550 550
LD1
1658

NOTCHING AT CASING, SEAL WITH


SEALANT TO PREVENT LEAKAGE
(TYPICAL)
LD3

750(TYP) 808
LS1

4730
LC1
2360

7 9 10 11
6 9 10 11 2 3 4 5

LC1 3T6

LC2
3668

LC3

LD5
15 16 17 18
13 16 17 18
LS2
5335

6 9 10 11

LD4

LS4
LD2

3T6
LC2

12 16 17 18
8 9 10 11
14 16 17 18
13 16 17 18 LS5
LS3

6 9 10 11

PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04413


1:40 TELUK PAMEDAS, EAST KALIMANTAN,
A - 18 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG IOUT1050-PD-VDL-17-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 18 JULY 2018

YY.YONG 18 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA CAGE LADDER INSTALLATION DRAWING
YY.YONG 18 JULY 2018

ZH.YANG 18 JULY 2018


PT TRUBA JAYA ENGINEERING
38°

80 95
75 80

200
8300

400(TYP)
6500 1000
1400 2800
400
95

3100
80 80

200
400(TYP)

2300
100

5610
100

100

4010
400(TYP)

100
2610

1810
400(TYP)
110

110
325 2675

325 2675
2574
2650

2324
2400

Bill Of Materials
1:100 PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415
A - 19 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG
TELUK PAMEDAS, EAST KALIMANTAN, IOUT1050-PD-VDL-18-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 19 JULY 2018

YY.YONG 19 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA DOUBLE TRASH SCREEN INSTALLATION DRAWING
YY.YONG 19 JULY 2018

ZH.YANG 19 JULY 2018


PT TRUBA JAYA ENGINEERING
2574 2574
2424 2424
665 665 665 665
200 200

200
200

1405

1280
1405

1280

2810
2810

2574

1405
1405

665 665

590 590

60
750 750
800 800

25
25

750 750 750 750

2574

750 750

100

100
100

100

675 675

1405

1280
1405

1280

60
2810
2810

1405
1405

2574

750 750

665 665 665


665

60
100x10mm 100x10mm
OPENING HOLE OPENING HOLE
(for eye plate) (for eye plate)

25 25
25

25

NOTES:

RCR Energy
Indonesia PT RCR ENERGY INDONESIA
2324 2324

2174 2174
200 200

200

200
1005

1005
880

880
2010

2010
2324
1005

1005
594 594

519 519

625 625

60
675 675
25

25
2324 2324

2174 2174 2324


200 200
625 625

550 550
100

100
200

200
1005

1005
880

880

60
2010

2010
1005

1005

2324

625 625

60
25 100x10mm 100x10mm
25 OPENING HOLE OPENING HOLE
(for eye plate) (for eye plate)
25

25

NOTES:

RCR Energy
Indonesia PT RCR ENERGY INDONESIA
50

60

30
50
30 60

50
30
75

30
50
50

75
6

38
30
50

50
50

50
30

38
50 50
50 50

6
60

60

60

30
60

50
30

75
15 75
75 6
25

75
50

30
60

58

75
3045
36

50
30 30

90
125

NOTES:

RCR Energy
Indonesia PT RCR ENERGY INDONESIA
2838
975 1863

TBC 400
975 1863

HOIST
SIZE
400

MIN. CLEARANCE
2000

3000
2000

4248
2000

(170)
2000

400 24
Ø

38
4-
5495

400
224

300
2000

38 324 38
2000

3000
4248
2000

5
1200
2000

1:55 PT. KARTANEGARA ENERGI PERKASA E-0002514-173-04415


A - 19 JULY 2018 ISSUED FOR REVIEW TH.TAN YY.YONG ZH.YANG
TELUK PAMEDAS, EAST KALIMANTAN, IOUT1050-PD-VDL-19-01
-
@A1 SIZE INDONESIA 0
0 12 DEC 2018 ISSUED FOR CONSTRUCTION TH.TAN YY.YONG ZH.YANG
SENIPAH COMBINED CYCLE EXPANSION PROJECT
TH.TAN 19 JULY 2018

YY.YONG 19 JULY 2018


RCR Energy
Indonesia PT RCR ENERGY INDONESIA LIFTING DEVICE INSTALLATION DRAWING
YY.YONG 19 JULY 2018

ZH.YANG 19 JULY 2018


PT TRUBA JAYA ENGINEERING

You might also like