Download as pdf or txt
Download as pdf or txt
You are on page 1of 17

PROCEDURE IN THE SUBMISSION, EVALUATION,

AND APPROVAL OF THE SCHOOL ANNUAL


IMPLEMENTATION PLAN (AIP) AND PROJECT
PROCUREMENT MANAGEMENT PLAN (PPMP)
Division Memorandum No. 285, s. 2023

“LEARN and TEACH with a HEART to be GREAT and SMART”


“LEARN and TEACH with a HEART to be GREAT and SMART”
“LEARN and TEACH with a HEART to be GREAT and SMART”

PROCEDURE
01 PREPARATION AND SUBMISSION OF THE
AIP AND PPMP

• To be prepared by the School Planning Team

• Use prescribed template which can be downloaded from the link


https://bit.ly/SchoolAIP-PPMPTemplate.
01 PREPARATION AND SUBMISSION OF THE
AIP AND PPMP
• The following must be observed:
➢Program/project name must be clearly indicated.
➢The item/s to be procured must be related with the objective
and/or specific activity of the program.
➢Repair in a year must not exceed to 25% of the school approved
annual MDP.
➢Localized price threshold must be observed.
➢Only eligible/allowable items must be reflected.
➢Only ONE format or template in the AIP and PPMP shall be used.
01 PREPARATION AND SUBMISSION OF THE
AIP AND PPMP
➢There shall be uniformity in the “unit of issue” per item to avoid
confusion.
➢Subtotal per month must be reflected in the PPMP.
➢Reference to brand name is strictly not allowed based on
Section 18 of RA 9184.
➢Overall monthly total must coincide with the Division monthly
MDP.
➢A separate sheet bearing the signature of the School Planning
Team shall be submitted along with the AIP and PPMP.
01 PREPARATION AND SUBMISSION OF THE
AIP AND PPMP

• AIP and PPMP must be submitted in two (2) hard copies to the
District SIP/AIP Appraisal Team

• Each page of the AIP must bear the signature/initial of the School
Head
02 DISTRICT AIP CHECKING
• To be checked by the District SIP/AIP Appraisal Team

• Ensure that guidelines are strictly followed before


forwarding it to the Division Office

• District Appraisal Team (all members) shall sign in the


separate sheet submitted by the SPT

• District SIP/AIP Appraisal Team Leader shall sign in every


page of the submitted AIP
03 SDO EVALUATION

Planning and Research


• Conducts initial appraisal
• Signs the AIP (all pages)
• Forwards the appraised AIP to the accounting section, if
found to be in order
03 SDO EVALUATION

Accounting Section
• Reviews the allocation and eligibility of the items to be
funded by MOOE outlined in the AIP
• Signs the AIP (all pages)
• Forwards the reviewed AIP to the ASDS Office for
acceptance, if found to be in order
04 ACCEPTANCE

ASDS Office
• ASDSs sign for acceptance
• Return the AIP to the Planning and Research section for
recording purposes
05 RELEASE OF APPROVED AIP

Planning and Research Section


• Records the approved AIP in the database
• Forwards the Approved AIP to the Record Section for
release
06 UPLOADING OF E-COPY OF THE AIP
AND PPMP

School Planning Team


• Uploads the electronic copy of the Approved AIP and
PPMP (in PDF format) in the link
https://bit.ly/ZDSSchoolAIP_PPMP.
REMINDERS

• Only AIPs that are found to be in order shall be


forwarded to the concerned offices, otherwise, shall
be returned to the school for enhancement.

• The uploaded AIP shall be used by the accounting


section in checking liquidation reports
“LEARN and TEACH with a HEART to be GREAT and SMART”

TEMPLATES
THANK YOU!

“LEARN and TEACH with a HEART to be GREAT and SMART”

You might also like