MATERIALS 5.

ENSURE BOTH ENDS OF THE BERM REMOVAL (IF REQUIRED)


ARE ADEQUATELY TURNED UP THE
(i) MULCH MUST COMPLY WITH THE
SLOPE TO PREVENT FLOW BYPASSING 1. WHEN DISTURBED AREAS UP-SLOPE
REQUIREMENTS OF AS4454.
PRIOR TO WATER PASSING OVER THE OF THE BERM ARE SUFFICIENTLY
(ii) MAXIMUM SOLUBLE SALT BERM. STABILISED TO RESTRAIN EROSION, THE
CONCENTRATION OF 5dS/m. BERM MAYBE REMOVED.
(iii) MOISTURE CONTENT OF 30 TO 50% 6. ENSURE 100% CONTACT WITH THE
PRIOR TO APPLICATION. SOIL SURFACE. 2. REMOVE ANY COLLECTED SEDIMENT
AND DISPOSE OF IN A SUITABLE MANNER
INSTALLATION 7. WHERE SPECIFIED, TAKE THAT WILL NOT CAUSE AN EROSION OR
APPROPRIATE STEPS TO VEGETATE THE POLLUTION HAZARD.
1. REFER TO APPROVED PLANS FOR BERM.
LOCATION AND EXTENT. IF THERE ARE 3. REHABILITATE/REVEGETATE THE
QUESTIONS OR PROBLEMS WITH THE MAINTENANCE DISTURBED GROUND AS NECESSARY TO
LOCATION, EXTENT, MATERIAL TYPE, OR MINIMISE THE EROSION HAZARD.
METHOD OF INSTALLATION CONTACT THE 1. DURING THE CONSTRUCTION PERIOD,
ENGINEER OR RESPONSIBLE ON-SITE INSPECT ALL BERMS AT LEAST WEEKLY
OFFICER FOR ASSISTANCE. AND AFTER ANY SIGNIFICANT RAIN. MAKE
NECESSARY REPAIRS IMMEDIATELY.
2. WHEN SELECTING THE LOCATION OF A
MULCH FILTER BERM, TO THE MAXIMUM 2. REPAIR OR REPLACE ANY DAMAGED
DEGREE PRACTICAL, ENSURE THE BERM SECTIONS.
IS LOCATED:
3. WHEN MAKING REPAIRS, ALWAYS
(i) TOTALLY WITHIN THE PROPERTY RESTORE THE SYSTEM TO ITS ORIGINAL
BOUNDARIES; CONFIGURATION UNLESS AN AMENDED
LAYOUT IS REQUIRED OR SPECIFIED.
(ii) ALONG A LINE OF CONSTANT
ELEVATION (PREFERRED, BUT NOT 4. REMOVE ACCUMULATED SEDIMENT IF
ALWAYS PRACTICAL); THE SEDIMENT DEPOSIT EXCEEDS A Sediment-laden
100 mm (min)
DEPTH OF 100mm OR 1/3 THE HEIGHT OF sheet flow
(iii) AT LEAST 1m, IDEALLY 3m, FROM THE 500 mm (min) Max
TOE OF A FILL EMBANKMENT; THE BERM. 1 grade
1
(iv) AWAY FROM AREAS OF 5. DISPOSE OF SEDIMENT IN A SUITABLE
CONCENTRATED FLOW. MANNER THAT WILL NOT CAUSE AN
EROSION OR POLLUTION HAZARD. Recommended maximum berm spacing
Mulch filter berm
3. ENSURE THE BERM IS INSTALLED IN A Land slope Max spacing
< 2% 30 m
MANNER THAT AVOIDS THE
5% 25 m
CONCENTRATION OF FLOW ALONG THE
10% 15 m
BERM, OR THE UNDESIRABLE
20% 8m
DISCHARGE OF WATER AROUND THE END
Catchments & Creeks Pty Ltd

OF THE BERM.
Figure 1 - Typical placement of mulch filter berm
4. ENSURE THE BERM HAS BEEN PLACED
SUCH THAT PONDING UP-SLOPE OF THE
BERM IS MAXIMISED. Drawn: Date:

GMW Apr-10 Mulch Filter Berms MB-01