Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CAUTION; SPECIFICATIONS FOR SITE OR CHAIN DRAGGING; THEN FIRM THE 6. AREAS MUST BE RE-SEEDED AND MULCHED 14.

-SEEDED AND MULCHED 14. APPLY ADDITIONAL SEED, MULCH AND/OR


REVEGETATION VARY CONSIDERABLY FROM SURFACE WITH A ROLLER TO PROVIDE GOOD IF THE VEGETATION FAILS TO ESTABLISH OR IS SOIL CONDITIONING AS REQUIRED. MULCHES
SITE TO SITE. SITE SUPERVISORS SHOULD SEED CONTACT. DAMAGED BY RUNOFF OR CONSTRUCTION USUALLY NEED TO BE MAINTAINED OR
OBTAIN SITE SPECIFIC PLANTING ACTIVITIES. RENEWED (AS NECESSARY) 2 TO 3 TIMES A
8. APPLY SEED AT THE RECOMMENDED RATE,
SPECIFICATIONS. YEAR.
AND DISC OR OTHERWISE MECHANICALLY 7. IF THE TEMPORARY VEGETATION COVER OR
TREAT THE SURFACE TO BRING THE SEED EROSION CONTROL MEASURE (e.g. MULCH 15. INSPECT AND WHERE NECESSARY REPAIR
INSTALLATION
INTO CONTACT WITH THE SOIL. COVER) SHOULD FAIL FOR ANY REASON PROTECTIVE FENCING AT MAINTENANCE
1. REFER TO APPROVED PLANS FOR
BEFORE ESTABLISHMENT OF THE PERMANENT PERIODS NOT EXCEEDING 1 MONTH.
LOCATION, EXTENT, AND APPLICATION 9. THE SEEDED AREA SHOULD BE MULCHED AS
VEGETATION COVER, THEN IT MUST BE
DETAILS. IF THERE ARE QUESTIONS OR SPECIFIED IN THE APPROVED PLAN. 16. RE-FIRM PLANTS LOOSENED BY
REPLACED WITH AN APPROPRIATE TYPE OF
PROBLEMS WITH THE LOCATION, EXTENT, OR WIND-ROCK, LIVESTOCK OR WILDLIFE.
COVER SUFFICIENT TO CONTROL SOIL
METHOD OF APPLICATION CONTACT THE MAINTENANCE
EROSION. 17. REPLACE DEAD OR SEVERELY RETARDED
ENGINEER, LANDSCAPE ARCHITECT OR 1. DURING THE CONSTRUCTION PHASE,
PLANTS.
RESPONSIBLE ON-SITE OFFICER FOR INSPECT THE TREATED AREA FORTNIGHTLY 8. IF THE PERMANENT VEGETATION SHOULD
ASSISTANCE. AND AFTER RUNOFF-PRODUCING RAINFALL. FAIL TO ESTABLISH OR TO ADEQUATELY 18. PRUNE ANY PLANTS OF DEAD OR
MAKE REPAIRS AS NEEDED. RESTRAIN EROSION FOR ANY REASON DISEASED PARTS. CUT OFF ALL DAMAGED
2. ENSURE ALL NECESSARY SOIL TESTING (e.g.
DURING THE CONSTRUCTION OR TREE LIMBS ABOVE THE TREE COLLAR AT THE
SOIL pH, NUTRIENT LEVELS) AND ANALYSIS 2. WATERING THE VEGETATION PERIODICALLY
MAINTENANCE PERIOD, THE AREA SHOULD BE TRUNK OR MAIN BRANCH. USE SEVERAL
HAS BEEN COMPLETED, AND REQUIRED SOIL IS ESSENTIAL, ESPECIALLY IN THE FIRST 7
REVEGETATED OR PROTECTED WITH OTHER CUTS INCLUDING UNDERCUTTING TO AVOID
ADJUSTMENTS PERFORMED PRIOR TO DAYS AFTER ESTABLISHMENT. USE
EROSION CONTROL MEASURES AS PEELING BARK FROM THE HEALTHY AREAS OF
PLANTING. LOW-PRESSURE SPRAYS BECAUSE
APPROPRIATE. THE TREE.
HIGH-PRESSURE JETS CAN WASH AWAY THE
3. APPLY SOIL CONDITIONERS AND FERTILISER
SEED AND MULCH COVER. 9. IN AREAS WHERE THE OBTAINED 19. DISPOSE OF CLEARED VEGETATION IN AN
AS SPECIFIED ON THE APPROVED PLANS. RIP
VEGETATION COVER IS CONSIDERED APPROPRIATE MANNER SUCH AS CHIPPING OR
THE SOIL 100 TO 150mm TO MIX THE 3. WATERING SHOULD START IMMEDIATELY
INADEQUATE FOR EROSION CONTROL, THE MULCHING, ON-SITE BURIAL, OR OFF-SITE
COMPONENTS INTO THE SOIL AND TO LOOSEN AFTER PLANTING. WATERING SHOULD
AFFECTED AREA SHOULD BE OVER-SEEDED DISPOSAL. CLEARED VEGETATION SHOULD
AND ROUGHEN THE SOIL SURFACE BEFORE COMPLY WITH SPECIFICATIONS PROVIDED
AND FERTILISED USING HALF THE ORIGINALLY NOT BE DUMPED NEAR A WATERCOURSE OR
SEEDING. WITH THE APPROVED PLANS. GENERALLY
SPECIFIED RATES, OR AS DIRECTED. ON A FLOODPLAIN WHERE IS COULD BE
WATERING SHOULD VARY ACCORDING TO
4. WHERE POSSIBLE, THERE SHOULD BE REMOVED BY FLOODWATERS. VEGETATION
WEATHER AND SOIL CONDITIONS. A TYPICAL 10. MAINTAIN GRASS BLADE LENGTH AT A
SUFFICIENT SOIL DEPTH TO PROVIDE AN SHOULD NOT BE BURNT ON-SITE WITHOUT
WATERING SCHEDULE MAY CONSIST OF THE MINIMUM 50mm HEIGHT WITHIN MEDIUM TO
ADEQUATE ROOT ZONE. THE DEPTH TO ROCK SPECIFIC APPROVAL FROM THE LOCAL
FOLLOWING: HIGH VELOCITY DRAINAGE AREAS, AND 20 TO
OR IMPERMEABLE LAYERS SUCH AS AUTHORITY.
(i) 25mm EVERY SECOND DAY FOR THE FIRST 50mm WITHIN LOW VELOCITY FLOW PATHS.
HARDPANS SHOULD BE 300mm OR MORE,
THREE WATERINGS; 20. REPAIR DAMAGED TREE ROOTS BY
EXCEPT ON SLOPES STEEPER THAN 2:1(H:V) 11. WHERE NECESSARY, OR AS DIRECTED BY
(ii) 25mm TWICE A WEEK FOR THE NEXT THREE CUTTING OFF THE DAMAGED AREAS AND
WHERE SUCH SOIL DEPTH MAY NOT BE THE SITE SUPERVISOR, SLASH THE
WEEKS; AND SEALING THEM WITH AN APPROVED PRODUCT.
FEASIBLE. TEMPORARY CROP/GRASS COVER TO ALLOW
(iii) 25mm ONCE WEEKLY FOR A FURTHER TWO SPREAD MOIST TOPSOIL OVER EXPOSED
THE SUCCESSFUL GROWTH OF THE
5. ENSURE THE SOIL pH IS WITHIN THE WEEKS. ROOTS.
UNDERLYING PERMANENT VEGETATION
SPECIFIED RANGE.
4. MONITOR SITE REVEGETATION, COVER.
6. APPLY SEED UNIFORMLY BY HAND OR WITH PARTICULARLY AFTER RAINFALL, AND
12. CONTROL WEED GROWTH WITHIN 1m OF
A CYCLONE SEEDER, DROP-TYPE SPREADER, APPROPRIATE MAINTENANCE AND/OR
I-MMATURE TREES FOR 6 TO 12 MONTHS FOR
DRILL, HYDROSEEDER, HYDROMULCHER, OR AMENDMENT TO ENSURE THAT THE
FAST GROWING SPECIES, AND 18 TO 20
OTHER SUITABLE EQUIPMENT AS SPECIFIED. REVEGETATION IS CONTROLLING EROSION
MONTHS FOR SLOWER GROWING SPECIES,
AND STABILISING SOIL SLOPES AS REQUIRED.
7. WHEN USING BROADCAST-SEEDING OR UNTIL THE END OF THE SPECIFIED
METHODS, SUBDIVIDE THE AREA INTO 5. WHERE PRACTICABLE, FILL IN, OR LEVEL MAINTENANCE PERIOD.
WORKABLE SECTIONS AND APPLY ONE-HALF OUT, ANY RILL EROSION BETWEEN PLANTS. IF
Catchments & Creeks Pty Ltd

13. WHERE MULCH IS USED TO CONTROL


THE SPECIFIED QUANTITY OF SEED WHILE EXCESSIVE EROSION OCCURS, THEN
WEED GROWTH, INSPECT AND WHERE
MOVING BACK AND FORTH ACROSS THE AREA, CONSIDER INCREASING THE PLANTING
NECESSARY, RENEW AT MAINTENANCE
MAKING A UNIFORM PATTERN. THEN APPLY DENSITY, APPLYING APPROPRIATE EROSION
PERIODS NOT EXCEEDING 4 TO 6 MONTHS.
THE SECOND HALF IN THE SAME WAY, BUT CONTROL MEASURES, OR INTRODUCING
MOVING AT RIGHT ANGLES TO THE FIRST ALTERNATIVE, NON-CLUMPING PLANT Drawn: Date:
PASS. COVER BROADCAST SEED BY RAKING SPECIES.
GMW Dec-09 Revegetation - General R-01

You might also like